Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14030A26830 September 2010Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location
ML10273032930 September 2010NRC Slides for Public Meeting to Discuss Braidwood Nuclear Station Special Inspection ExitSafe Shutdown
RS-14-029, Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location30 September 2010Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location
RA-10-074, Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope24 September 2010Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
NRC-2010-0309, FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-030923 September 2010FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309Hydrostatic
Exemption Request
ML10267005723 September 2010FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309Hydrostatic
Exemption Request
Press Release-III-10-036, NRC Schedules Public Meeting to Discuss Special Inspection Team Results for Braidwood Nuclear Power Plant23 September 2010Press Release-III-10-036: NRC Schedules Public Meeting to Discuss Special Inspection Team Results for Braidwood Nuclear Power Plant
ML10258113222 September 2010Acknowledgement of Cyber Security Plan Supplement Based NEI 08-09, Revision 6Cyber Security
RS-10-153, Withdrawal of License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading Rooms20 September 2010Withdrawal of License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading RoomsFire Protection Program
ML10253054417 September 2010Review of the 2009 Steam Generator Tube Inservice Inspection Report
ML10251049516 September 2010Issuance of Amendments 163, 163, 169 & 169 Extension of Inspection Interval for Reactor Coolant Pump FlywheelsSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
ML10259009315 September 2010Public Exit Meeting Notice for the Special Inspection That Was Conducted at Braidwood in Response to Dual Unit Shutdown on August 16, 2010
ML10224040510 September 2010Request for Additional Information Related to Large Break Loss-of-Coolant Accident Analysis Using Astrum
Press Release-10-154, National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study3 September 2010Press Release-10-154: National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk StudyEnvironmental Justice
ML1024204703 September 2010Acceptance Review of License Amendment Request Low Temperature Overpressure Protection
ML1024506921 September 2010EC 361017, Revision a, Evaluation of the Interim Remedial Action Pumping SystemOffsite Dose Calculation Manual
Incorporated by reference
ML1024506891 September 2010EC 360234 Evaluation, Braidwood StationHot Short
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Incorporated by reference
ML1024506881 September 2010EC 360234, Eval - Mech, Braidwood StationGrab sample
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Incorporated by reference
ML1024506871 September 2010EC 361017, Revision 000, Evaluation of the Interim Remedial Action Pumping System, Braidwood StationHot Short
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Incorporated by reference
ML1024401001 September 2010Mid-Cycle Performance Review and Inspection Plan - Braidwood Nuclear Power Plant
RS-10-137, Supplemental Information Supporting License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal24 August 2010Supplemental Information Supporting License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat RemovalSafe Shutdown
Shutdown Margin
Operator Manual Action
PNO-III-10-014, A; Update - Shutdown of Braidwood Reactors Unit 1 & 223 August 2010PNO-III-10-014A; Update - Shutdown of Braidwood Reactors Unit 1 & 2
RS-10-142, Response to RAI Supporting Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program19 August 2010Response to RAI Supporting Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramInternal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Press Release-III-10-032, NRC Begins Special Inspection at Braidwood Nuclear Power Plant18 August 2010Press Release-III-10-032: NRC Begins Special Inspection at Braidwood Nuclear Power Plant
ML10230070918 August 2010No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010Cyber Security
Fuel cladding
ML10236035018 August 2010Tritium Production and Release Path, Braidwood
ML10229029317 August 2010PNO-III-10-014 - Shutdown of Braidwood Reactors Unit 1 & 2
ML10228028412 August 2010Ec. 361017, Revision a, Evaluation of the Interim Remedial Action Pumping System, BraidwoodHot Short
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Incorporated by reference
RS-10-101, Units 1 & 2 - Parent Guarantees for Decommissioning Financial Assurance9 August 2010Units 1 & 2 - Parent Guarantees for Decommissioning Financial AssuranceDecommissioning Funding Plan
ML1021401285 August 2010Unit Nos.1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Low Temperature Overpessure ProtectionOperator Manual Action
ML1021803365 August 2010Ltr to A. Shahkarami Re Participation in Commission Meeting on the Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Performance on 09/29/10
ML1021102664 August 2010Enclosure 4: Exelon - Braidwood Presentation of July 28, 2010 Public Meeting
IR 05000456/201000329 July 2010IR 05000456-10-003, 05000457-10-003, on 04/01/2010 - 06/30/2010, Braidwood Station, Units 1 & 2, Follow-Up of Events and Notices of Enforcement DiscretionSafe Shutdown
Unanalyzed Condition
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Foreign Material Exclusion
Maintenance Rule Program
Pressure Boundary Leakage
Fire Protection Program
ML10214008028 July 2010Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML10210015228 July 2010Ltr. 07/28/10 Braidwood Ti 2515/177 Request for Information
ML10208050527 July 2010Ltr. 07/27/10 Braidwood ISI Request for InformationBoric Acid
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
ML10207002527 July 2010Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security PlanCyber Security
IR 05000456/200900823 July 2010IR 07200073-09-001, IR 05000456-09-008, IR 05000457-09-008, on 07/07/2010, Braidwood Station
TAC:ME429823 July 2010
ML10111032423 July 2010Fleet - Request to Use Specific Provisions from a Later Edition of American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
Liquid penetrant
NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan23 July 2010Re-Submittal of the Exelon Cyber Security PlanCyber Security
Incorporated by reference
ML10204020322 July 2010E-mail Draft on NEI 99-01 Rev 5
ML10203053022 July 2010Readiness for 95001 Supplemental Inspection
ML10208025022 July 2010Attachment to e-amil for Draft NRC RAI (Exelon EAL Upgrade Project)
ML10208025222 July 2010Attachment to E-mail NRC Draft RAIs - Exelon Ela Upgrade Project
ML10088008521 July 2010Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5
TAC:ME220020 July 2010
ML10197028820 July 2010Relief Request 13R-05 for Post Accident Hydrogen Monitoring System PipingVT-2
Incorporated by reference
Through-Wall Leak
ML10174043120 July 2010Request for Additional Information Related to License Amendment Request to Adopt TSTF-425, Revision 3Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
ML10196010214 July 2010Information Request to Support Upcoming Problem Identification and Resolution (PI &R) Inspection at Braidwood StationTemporary Modification