MONTHYEARIR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 IR 05000457/20214202023-03-22022 March 2023 Reissued - Braidwood Generating Station, Unit 1 and 2, Security Inspection Report Cover Letter 05000456 and 05000457-2021420 IR 05000456/20220062023-03-0101 March 2023 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2022006 and 05000457/2022006) IR 05000456/20220042023-01-26026 January 2023 Integrated Inspection Report 05000456/2022004 and 05000457/2022004 ML22269A4992022-11-0808 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report IR 05000456/20220032022-10-25025 October 2022 Integrated Inspection Report 05000456/2022003 and 05000457/2022003 and Exercise of Enforcement Discretion IR 05000456/20224202022-10-24024 October 2022 Cover Letter Braidwood Station Units 1 and 2 Security Baseline Inspection Report 05000456/2022420 and 05000457/2022420 IR 05000456/20224032022-08-23023 August 2022 Material Control and Accounting Program Inspection Report 05000456/2022403 and 05000457/2022403 IR 05000456/20220052022-08-22022 August 2022 Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2022005; 05000457/2022005) IR 05000456/20220022022-07-26026 July 2022 Integrated Inspection Report 05000456/2022002; 05000457/2022002; and 07200073/2022001 IR 05000456/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000456/2022011 and 05000457/2022011 IR 05000456/20224012022-07-13013 July 2022 Security Baseline Inspection Report 05000456/2022401 and 05000457/2022401 IR 05000456/20220102022-06-22022 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000456/2022010 and 05000457/2022010 IR 05000456/20220012022-05-0303 May 2022 Integrated Inspection Report 05000456/2022001 and 05000457/2022001 IR 05000456/20223012022-04-0606 April 2022 NRC Initial License Examination Report 05000456/2022301 and 05000457/2022301 IR 05000456/20225012022-03-21021 March 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000456/2022501 and 05000457/2022501 IR 05000456/20210062022-03-0202 March 2022 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2021006 and 05000457/2021006) IR 05000456/20224022022-02-0404 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 IR 05000456/20210042022-01-28028 January 2022 Integrated Inspection Report 05000456/2021004 and 05000457/2021004 IR 05000456/20210032021-10-26026 October 2021 Integrated Inspection Report 05000456/2021003 and 05000457/2021003 IR 05000456/20214022021-09-16016 September 2021 Security Baseline Inspection Report 05000456/2021402 and 05000457/2021402 IR 05000456/20210052021-09-0101 September 2021 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2021005 and 05000457/2021005) IR 05000456/20210022021-07-22022 July 2021 Integrated Inspection Report 05000456/2021002 and 05000457/2021002 IR 05000456/20210102021-07-19019 July 2021 Triennial Fire Protection Inspection Report 05000456/2021010 and 05000457/2021010 IR 05000456/20214012021-05-20020 May 2021 Security Baseline Inspection Report 05000456/2021401 and 05000457/2021401 IR 05000456/20210012021-04-16016 April 2021 Integrated Inspection Report 05000456/2021001 and 05000457/2021001 IR 05000456/20200062021-03-0404 March 2021 Annual Assessment Letter for Braidwood Station (Report 05000456/2020006 and 05000457/2020006) IR 05000456/20200042021-01-26026 January 2021 Integrated Inspection Report 05000456/2020004; 05000457/2020004; and 07200073/2020001 IR 05000456/20200122020-11-18018 November 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000456/2020012 and 05000457/2020012 IR 05000456/20200032020-11-10010 November 2020 Integrated Inspection Report 05000456/2020003 and 05000457/2020003 IR 05000456/20204022020-10-0202 October 2020 Security Baseline Inspection Report 05000456/2020402 and 05000457/2020402 2024-09-12
[Table view] Category:Letter
MONTHYEARRS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 27, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
BRAIDWOOD STATION UNIT 1 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Pacilio:
On October 4, 2010, the NRC will begin the Baseline Inservice Inspection (NRC Inspection Procedure (IP) 71111.08) at the Braidwood Station Unit 1. This inspection is scheduled to be performed October 4 through 15, 2010.
Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. T. Matson, of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. T. Bilik at (630) 829-9744.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-456; License Nos. NPF-72;
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ
INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: October 4 - 15, 2010 Inspection Procedures: IP 71111.08, Inservice Inspection Inspector: Tom Bilik (630) 829-9744 tom.bilik@nrc.gov A. Information Requested for the In-Office Preparation Week The following information (electronic copy CD ROM if possible) is requested by September 20, 2010, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site from your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.
- 1. A detailed schedule and description of:
- a. non-destructive examinations (NDE) planned for Class 1 and 2 Systems and containment, performed as part of your American Society of Mechanical Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk Informed (RI)-ISI Program, or other augmented inspection programs commitments as part of an industry initiative. Specifically, identify any dissimilar metal weld examinations performed to meet the MRP-139 Program that are scheduled to occur during the outage. For each weld examination, include the weld identification number, description of weld (component name), category, class, type of exam and procedure number, and date of exam;
- b. reactor vessel upper head examinations required by 10 CFR 50.55a(g)(6)(ii)(D) and Code Case N-729-1;
- c. steam generator (SG) tube inspection and repair activities for the upcoming outage; and
- d. welding on Code Class 1, 2, or 3 components.
Also, provide the inspector with the on-site training necessary to observe these activities; (e.g., confined space, scaffolding, or fall protection).
- 2. A copy of the NDE procedures and welding procedures used to perform the activities identified in A.1 (including NDE calibration and flaw characterization/sizing procedures and Welding Procedure Qualification Records).
1 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST
- 3.Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the Electric Power Research Institute (EPRI) performance demonstration qualification summary sheets).
- 4. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A(1).
- 5. A copy of the 10-year ISI program showing those required exams scheduled to be performed during this outage, and those that have been completed.
- 6. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.
- 7. List with short description of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation, (e.g., NIS-2 forms with definitions of system and component acronyms).
- 8. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.
- 9. List with description of ISI and SG related issues (e.g., piping/SG tube degradation, or damage (cracks, wall thinning, wear, corrosion or errors identified in piping/SG tube examinations) entered into your corrective action system since the beginning of the last refueling outage (both Units). Also, include a list of corrective action records associated with foreign material introduced/identified in the primary or secondary piping systems since the beginning of the last refueling outage (both Units).
- 10. Copy of any 10 CFR Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code, which have been identified since the beginning of the last refueling outage.
- 11. Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.
- 12. Copy of procedure containing screening criteria used for selecting tubes for in-situ-pressure testing and the procedure to be used for in-situ-pressure testing.
- 13. Copy of previous outage SG tube operational assessment completed following ET of the SGs.
2 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST
- 14. Copy of the document defining the planned ET scope for the SGs and the scope expansion criteria which will be used. Also, identify and describe any deviations in this scope or expansion criteria from the EPRI Guidelines.
- 15. Copy of the document describing the ET probe types, Examination Technique Specification Sheets, and ET acquisition equipment to be used, including the areas of the SG (e.g., top of tube sheet, U-bends) that each probe will be used.
- 16. Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition.
- 17. Identify changes made to the dissimilar metal weld examination program MRP for Unit 1 welds subject to the requirements of the Materials Reliability Program:
Primary System Piping Butt Weld Inspection and Evaluation Guidelines MRP-139, which have been implemented since the completion of the last NRC inspection. For example, identify a program change if welds have been moved in/out of scope, schedules of planned weld examinations have been changed, or planned methods for mitigation of susceptible welds have changed since the NRC documented its review of this program in its previous inspection report.
- 18. Identify any current, or planned, deviations from the Materials Reliability Program: Primary System Piping Butt Weld Inspection, and Evaluation Guidelines MRP-139, and provide a copy of the basis document supporting these deviations.
- 19. Identify and provide scheduled dates for any dissimilar metal weld mitigation activities (overlay repair, inlay repair, mechanical stress improvement, etc.),
which will occur during the upcoming Unit 1 outage.
B. Information To Be Provided On-Site To The Inspector Following The Entrance Meeting
- 1. For welds selected by the inspector from A.2 and A.6 above, provide copies of the following documents:
- a. Document of the weld number and location (e.g., system, train, branch);
- b. Document with a detail of the weld construction;
- c. Applicable Code Edition and Addenda for weldment;
- d. Applicable Code Edition and Addenda for welding procedures;
- e. Applicable weld procedures specifications (WPS) used to fabricate the welds; 3 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST
- f. Copies of procedure qualification records (PQRs) supporting the WPS;
- g. Copies of welders performance qualification (WPQ) records;
- h. Copies of mechanical test reports identified in the PQRs above;
- i. Copies of the nonconformance reports for the selected welds;
- j. Radiographs of the selected welds and access to equipment to allow viewing radiographs; and
- k. Copies of the preservice examination records for the selected welds.
- 2. For the ISI related corrective action issues selected by the inspector from A.8 above, provide a copy of the corrective actions, and supporting documentation.
- 3. For the nondestructive examination reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector from A.5 above, provide a copy of the examination records, and associated corrective action documents.
- 4. Updated schedules for item A.1 (including schedule showing contingency repair plans if available).
- 5. Copy of the procedures which govern the scope, equipment used, and implementation of the inspections required to identify boric acid leakage from systems, and components above the vessel head.
- 6. Copy of any documentation of:
- a. engineering evaluations/assessments of boric acid related deposits and associated wastage or corrosion for safety significant components; and
- b. corrective actions for coolant leakage including boric acid deposits on safety-related components identified since the beginning of the last refueling outage.
- 7. Copy of the plant procedures used to perform inspections to identify reactor coolant system leaks or boric acid deposits and the procedures for resolution of leaks or boric acid deposits.
- 8. Provide a copy of the EPRI Examination Technique Specification Sheets, which support qualification of the ET probes to be used during the upcoming SG tube inspections.
- 9. Provide a copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
- 10. Copy of document describing actions to be taken if a new SG tube degradation mechanism is identified.
4 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST
- 11. Identify the types of SG tube repair processes which will be implemented for defective SG tubes (including any NRC reviews/evaluation/approval of this repair process). Provide the flaw depth sizing criteria to be applied for ET indications identified in the SG tubes.
- 12. Provide a copy of the site specific documents, which implement the MRP-139 Program, and a copy of the baseline and inservice inspection schedules for the welds affected by this program.
- 13. Identify any dissimilar welds, which were excluded from the MRP-139 Guidelines, where the site is relying on nuclear steam supply shutoff system (NSSS) vendor documents to exclude these welds from this program. For these welds, (if any) provide a copy of the NSSS vendor documents and site documents, which provide the basis for excluding these welds from the MRP-139 Program.
- 14. Ready access to:
- a. Sections V, IX, and XI of the ASME Code, with Editions applicable to the inservice inspection program and the repair/replacement program.
- b. MRP-139, Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline and associated site implementing procedures.
- c. EPRI and industry standards referenced in the site procedures used to perform the SG tube eddy current examination, which includes EPRI documents: TR-107621-R1, Steam Generator Integrity Assessment Guidelines, TR-107620-R1, Steam Generator In-Situ Pressure Test Guidelines, and 1003138, Pressurized Water Reactor Steam Generator Examination Guidelines.
Ready access is typically facilitated by providing copies of these standards at the on-site NRC inspection location for the duration of the inspection.
5 Enclosure
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-456 License Nos. NPF-72
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 072710 Braidwood Unit 1 ISI RFI TXB.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME TBilik:ls DEHills DATE 7/26/10 7/27/10 OFFICIAL RECORD COPY