ML102140080

From kanterella
Jump to navigation Jump to search

Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations
ML102140080
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane  
Issue date: 07/28/2010
From: Hansen J
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
RIS 2010-08
Download: ML102140080 (12)


Text

RS-10-130 July 28, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

to NRC Regulatory Issue and Scheduling of Operator Licensing Examinations" NRC Issue Summary 2010-08, "Preparation and Scheduling Operator Licensing Examinations," dated June 28,2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

J r

ansen Manaer - Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO.

EXPIRES:

Ie lpl' rega~~~~gbb~~~~

cOlle~!i~~ "~6~

OPERATOR LICENSING to

~"v n",vT Services Branch (I'

.by i11ternet EXAMINATION DATA rr. r. "f). OfficeOffice" and 20503.

\\v I ov-v I v I

<Y.u"a~'O;. "'On" a

.~~~

not condi rt\\rr~,:;~c;,nsor.

a FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 NUMBER OF REACTOR 0

8 6

0 OPERATORS NUMBER OF SENIOR REACTOR 0

12 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 4/812013 1/5/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2012 Cy 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 12 0

CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.s. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE III PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE Cy 2012 2

6 o

o 1123/2012 1116/2012 Cy 2013 6

6 o

o 112112013 1128/2013 CY 2014 6

6 1

o 1127/2014 1120/2014 Cy 2015 o

6 o

o 1119/2015 1126/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

o 12 o

o o

6 o

NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER 1

1 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA

':ar\\ar'~hr,n Company, LLC Response to Regulatory Clinton Power Station Facility Operating License No. NPF-62 NRC Docket NO. 50-461 III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy20U Cy2013 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS o

6 o

6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT o

4 o

4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE o

2 o

2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED o

o o

o PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08/17115 ALTERNATE DATE N/A 08/26113 N/A 08/24115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2012 JUNE SEPTEMBER DECEMBER MARCH CY 2013 JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

10 o

o o

o o

o NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

U,S, NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 Page 1 of 1 EXPIRES; 10/31/2011 Summary 2010-08 Generation Company, LLC lJoe-n'....nC'*o to Regulatory OPERATOR LICENSING EXAMINATION DATA Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-I!' and DPR-25 NRC Docket Nos.58-237 aDd 50-249 III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF 1

I 0

1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

NRC-PREPARED 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012 Cy 2013 Cy2014 Cy2015 NUMBER OF REACTOR OPERATORS 5

4 o

4 NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 7

7 o

7 NUMBER OF SENIOR REACTOR OPERATORS UPGRADE o

1 o

NUMBER OF SENIOR REACTOR OPERATORS - LIMITED o

o o

o PROPOSED DATES PRIMARY DATE 8/6/12 10114/13 N/A 3/2/15 ALTERNATE DATE 8/20/12 10/28/13 N/A 3/23/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

12 o

o o

o o

12 NRC FORM 536 (1(1..2003)

PRINTED ON RECYCLEO PAPER

Generation Company, LLC Response to Regulatory Issue Summary 2010-08 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2015 NUMBER OF REACTOR 8

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10113/2014 N/A ALTERNATE DATE 10/112012 N/A 10120/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

o o

o o

12 o

o NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Generation Company, LLC Response to Regulatory Issue Summary 2010-08 U.s. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE 1

Page 1 of 1 PROPOSED NUMBER CY 2012 Cy 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF 0

LICENSEE-PREPARED 1

1 0

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE Cy 2012 8

7 2

o 10/08/2012 10/1512012 Cy 2013 o

o o

o N/A N/A Cy 2014 8

6 2

o 10/06/2014 10/1312014 Cy 2015 o

o o

o N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

o o

o o

14 o

o NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

.... vt::~lnn Generation Company, LLC Response to Regulatory Issue Summary 2010-08 U.S. NUCLEAR REGULATORY COMMISSION APPRoveo BY OMS: NO. 3150>0131 OPERATOR LICENSING EXAMINATION DATA Creek Nuclear Station Renewed License No. DPR-16 NRC Docket No.59-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Page 1 of 1 EXPIRES: 10131/2011 REGION PROPOSED NUMBER ESTIMATED NUMBER OF NRC~PREPARED EXAMINATIONS Cy 2012 I

o Cy 2013 o

o Cy 2014 o

CY 2015 o

o B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE Cy 2012 3

2 o

0512912012 06/04/2012 CY 2013 o

o o

o N/A N/A Cy 2014 2

o 0(jJ02l2014 06/0912014 Cy 2015 o

o o

N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER o

o o

13 o

o o

NRC FORM 535 (10-2008)

PRINTED ON RECYClED PAPER

Generation Company, LLC Response to Regulatory Issue Summary 2010-08 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Page 1 of 1 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I

NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR 0

8 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

10 0

6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • SeeLGS
  • See LGS OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 2/1112013 N/A 2/9/2015 ALTERNATE DATE N/A 3/2512013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES o

o o

o o

o 12 o

NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Generation Company! LLC ""OC''\\C'O to Regulatory Issue Summary 2010-08 Page 1 1

NRC FORM 536 U.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:

II' collection reqi is used to' Pl~~vb'~dg~~

IlIlV""<:HIVII OPERATOR LICENSING

~

-v ** va,",:,

"f'I"'' f'lf'If'I1

,by il,ternet EXAMINATION DATA

'. and

,!h~"" ".

and IV£V", t.:lIOU-U IJ I a

to:the a

iFACILlTY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF 1

0 1

LICENSEE-PREPARED 1

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR 4

5 0

5 OPERATORS NUMBER OF SENIOR REACTOR 9

5 0

5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

1 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/26/2012 9/23/2013 N/A 2/912015 ALTERNATE DATE 4/23/2012 10114/2013 N/A 2/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2012 Cy 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

10 0

0 0

0 0

10 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Generation Company, LLC Response to Regulatory Issue Summary 2010-08 0 Page 1 of 1 NRC FORM 536

,0-2008)

FACILITY U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED OMB: NO. 3150-0131 EXPIRES: 10/31/2011 NRC REGION Three I\\1ile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I

PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF 1

1 LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2012 4

5 o

o 02/612012 02/13/2012 Cy 2013 5

5 o

o 6/10/2013 6/17/2013 Cy 2014 4

5 o

o 6/16/2014 6/2312014 Cy2015 6

6 o

o 6/1512015 6/22/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 10 o

o o

9 o

o o

NRC FORM 536 (10-2008)