ML10132012330 September 2009Cultural Resources Protection Plan
IR 05000305/200900629 September 2009IR 05000305-09-006, on 06/22/2009 - 08/-20/2009 for KewauneeProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
Battery sizing
Weak link
Power Uprate
ML09232107928 September 2009Irradiated Fuel Management Program and Preliminary Decommissioning Cost Estimate
ML09260089928 September 2009(KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02
ML09272018428 September 2009Response to Request for Additional Information for the Review of License Renewal Application - Ventilation SystemsFire Barrier
Coatings
Zebra Mussel
Aging Management
License Renewal
Fire Protection Program
ML09271004525 September 2009Supplemental Information for the Review of the License Renewal Application - Changes to the Work Control Process Aging Management ProgramBoric Acid
Coatings
Aging Management
Fire Protection Program
Press Release-III-09-028, NRC to Discuss Results of License Renewal Inspection for Kewaunee Nuclear Power Plant24 September 2009Press Release-III-09-028: NRC to Discuss Results of License Renewal Inspection for Kewaunee Nuclear Power PlantAging Management
ML09279055522 September 2009Withdrawal of Licensee Event Report 2009-005-00
ML09264029818 September 2009NRC Inspection Report 05000305-09-406, Notification of Intentions
ML09260001316 September 2009Record of Conference Call in Which a Proposed ASME Code Alternative Was Verbally Authorized
ML09260064315 September 2009Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09
ML09260037615 September 2009Handout 2 - Drawings, Analyzed RCS - Not Limiting Break
ML09260001815 September 2009Handout 1 - GSI-191 Resolution for Kewaunee Power StationMission time
Coatings
ML09257064311 September 2009NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML09265029311 September 2009Independent Spent Fuel Storage Installation - Cask Registration for Spent Fuel Storage
ML09253073210 September 2009Ltr. 09/10/2009 Kewaunee Notice of Public Exit Meeting for NRC License Renewal Inspection
ML09254038110 September 200909/30/2009 Notice of Meeting with Dominion Energy Kewaunee, Inc Exit Meeting for IR 05000305/2009007, License Renewal Inspection
IR 05000305/20094068 September 2009NRC Security IR 05000305-09-406, 08/27/2009, Preliminary Greater than Green Inspection Findings for Kewaunee Power Station - Cover Letter OnlySignificance Determination Process
Affidavit
IR 05000305/20093022 September 2009Er 05000305-09-302 (Drs), on 8/3/2009 - 08/07/2009, Dominion Energy Kewaunee, Inc., Kewaunee Power Station, Initial License Retake Examination ReportJob Performance Measure
ML0924402721 September 2009Mid-Cycle Performance Review and Inspection Plan
TAC:ME232128 August 2009
ML09212054628 August 2009Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review ResultsCoatings
Aging Management
Fire Protection Program
ML09243033828 August 2009Removal of Mixed Vane Grid Spacing Restriction in Appendix B to Fleet Report Dom-NAF-2-Evaluation of 4X4 DNB Test of 15X15 Vantage + with Ifms Using Vipre-D/WRB-1Fuel cladding
ML09238017128 August 2009Notice of Telephone Conference Meeting with Dominion Energy Kewaunee, to Discuss Licensee'S Proposed Response to Request Regarding Generic Letter 2004-02
ML09244042824 August 2009Attachment 1 - Volume 12, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems, Revision 0Safe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Earthquake
Power Operated Valves
Recently irradiated fuel
Power change
Power Uprate
ML09244042424 August 2009Attachment 1 - Volume 8, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.3, Instrumentation, Revision 0Safe Shutdown
Reactor Vessel Water Level
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Earthquake
Recently irradiated fuel
ML09244041624 August 2009Attachment 1 - Volume 6, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.1, Reactivity Control Systems, Revision 0Boric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML09244043524 August 2009Attachment 5 - License Amendment Request 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Commitment List
ML09244044124 August 2009Enclosures 1, 2, 3, 4, and 5 - Attachment 5 - License Amendment Request 249, Kewaunee Power Station Conversion to Improved Technical Specifications
ML09244042724 August 2009Attachment 1 - Volume 11, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems, Revision 0High Radiation Area
Stroke time
Hydrostatic
Incorporated by reference
Condition Adverse to Quality
Power-Operated Valves
Power Operated Valves
Fuel cladding
ML09244037124 August 2009License Amendment Request 249, Conversion to Improved Technical SpecificationsProbabilistic Risk Assessment
ML09244042324 August 2009Attachment 1 - Volume 5, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0Time of Discovery
Missed surveillance
Offsite Circuit
ML09244041924 August 2009Attachment 1 - Volume 1, Kewaunee Power Station, Improved Technical Specifications Conversion, Application of Selection Criteria to the Kewaunee Technical Specifications, Rev. 0Safe Shutdown
Boric Acid
Shutdown Margin
Post Accident Monitoring
Probabilistic Risk Assessment
Earthquake
Pressure Boundary Leakage
ML09244041824 August 2009Attachment 1 - License Amendment Request 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Kewaunee ITS Submittal, Volumes 1 Through 16
ML09244042024 August 2009Attachment 1 - Volume 2, Kewaunee Power Station, Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Rev. 0Offsite Dose Calculation Manual
Incorporated by reference
Large early release frequency
ML09244043424 August 2009Attachment 4 - License Amendment Request 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Applicability of WCAP-14333 and WCAP-15376 to Kewaunee Power Station (Non-Proprietary Version)Internal Flooding
ML09244043324 August 2009Attachment 2 - License Amendment Request 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Background and Technical Analysis for Adoption of WCAP-10271, WCAP-14333 (TSTF-418), and WCAP-15376 (TSTF-411)High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML09244041724 August 2009Attachment 1 - Volume 7, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.2, Power Distribution Limits, Revision 0Shutdown Margin
Fuel cladding
Grace period
Power change
ML09244042524 August 2009Attachment 1 - Volume 9, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0Unanalyzed Condition
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Power Uprate
ML09244043024 August 2009Attachment 1 - Volume 14, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.9, Refueling Operations, Revision 0Boric Acid
Shutdown Margin
Time to boil
Probabilistic Risk Assessment
Fuel cladding
Recently irradiated fuel
ML09244043124 August 2009Attachment 1 - Volume 15, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 4.0, Design Features, Revision 0Earthquake
ML09244042924 August 2009Attachment 1 - Volume 13, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems, Revision 0Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Qualified Offsite Circuit
Incorporated by reference
Battery sizing
Recently irradiated fuel
Offsite Circuit
ML09244042224 August 2009Attachment 1 - Volume 4, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Chapter 2.0, Safety Limits (Sls), Revision 0Anticipated operational occurrence
Fuel cladding
ML09244042124 August 2009Attachment 1 - Volume 3, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0Safe Shutdown
Time of Discovery
Shutdown Margin
Pressure and Temperature Limits Report
Process Control Program
Pressure Boundary Leakage
ML09244042624 August 2009Attachment 1 - Volume 10, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling System (ECCS) Revision 0Boric Acid
Non-Destructive Examination
Stroke time
TAC:ME024624 August 2009
ML09244043224 August 2009Attachment 1 - Volume 16, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 5.0, Design Features, Revision 0Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML09239000821 August 2009E-mail Transmitting a Draft Safety Evaluation Regarding Preliminary Decommissioning Funding, and the Irradiated Fuel Management Program
ML09239001121 August 2009Draft SE on the Preliminary Decommissioning Cost Estimate, and Irradiated Fuel Management Program
IR 05000305/200940318 August 2009IR 05000305-09-403(DRS), on 07/20/2009 - 07/31/2009, Kewaunee Power Station, Routine Security Baseline Inspection - Cover LetterAffidavit