ML22350A102 | 16 December 2022 | 301 Exam Administrative Items (Normal release)(ADAMS-2B) | |
ML22294A092 | 15 December 2022 | Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 | Nondestructive Examination Foreign Material Exclusion Stress corrosion cracking Operational leakage |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
RA-22-0347, Transmittal of Core Operating Limits Report | 2 December 2022 | Transmittal of Core Operating Limits Report | Shutdown Margin |
ML22339A136 | 1 December 2022 | 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant | |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML22322A132 | 18 November 2022 | 301, NRC Operator License Examination Report & Cover Letter Merged | |
ML22256A253 | 14 November 2022 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
IR 05000261/2022003 | 3 November 2022 | Integrated Inspection Report 05000261 2022003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Earthquake Fire Protection Program Power change Overspeed trip |
RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | 1 November 2022 | Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | Post Accident Monitoring |
IR 05000261/2022402 | 19 October 2022 | Security Baseline Inspection Report 05000261/2022402 | |
ML22285A155 | 12 October 2022 | NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b | |
RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 4 October 2022 | Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination Operational leakage |
ML22262A288 | 3 October 2022 | Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 | |
ML22273A128 | 30 September 2022 | News Release-II-22-025: NRC Monitoring Hurricane Ian | |
ML22301A166 | 29 September 2022 | Presentation 4 - Recent Biennial PI&R Team Inspection Insights | Condition Adverse to Quality |
IR 05000261/2022010 | 26 September 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 | Ultimate heat sink FLEX Large early release frequency Battery sizing |
IR 05000261/2022301 | 23 September 2022 | 301 Operator License Exam Approval Letter (05000261/2022301) | |
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | 21 September 2022 | License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | Surveillance Frequency Control Program Fuel cladding |
ML22258A030 | 15 September 2022 | Evacuation Time Estimate Reports | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22257A239 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22258A039 | 9 September 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1272) | Pandemic COVID-19 COVID19 Siren |
PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 | 9 September 2022 | Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 | |
RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 | 8 September 2022 | Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 | |
ML22258A040 | 1 September 2022 | Evacuation Time Estimate Reports, Rev. 0 (Kld TR-1276) | Pandemic COVID-19 COVID19 Siren |
IR 05000261/2022005 | 26 August 2022 | Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final | Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
ML22222A108 | 10 August 2022 | NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 | |
IR 05000261/2021404 | 10 August 2022 | Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 | |
IR 05000261/2022002 | 9 August 2022 | Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion | Unanalyzed Condition Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Severe Accident Management Guideline Earthquake Continuous fire watch Fire Protection Program Fire Watch |
RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) | 9 August 2022 | Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) | Post Accident Monitoring |
ML22213A068 | 5 August 2022 | Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 | Affidavit |
ML22193A212 | 4 August 2022 | Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections | Coatings Incorporated by reference Moisture barrier |
ML22215A212 | 3 August 2022 | News Release-II-22-020: NRC Announces Resident Inspectors at Robinson Nuclear Power Plant | |
ML22159A295 | 3 August 2022 | Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves | |
RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 28 July 2022 | Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Non-Destructive Examination Stress corrosion cracking Affidavit |
IR 05000261/2022011 | 19 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 | Boric Acid Internal Flooding Cyber Security Condition Adverse to Quality Significance Determination Process Operability Determination Power change Unidentified leakage |
ML22174A287 | 14 July 2022 | Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 | |
ML22167A170 | 14 July 2022 | Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid High Radiation Area Safe Shutdown Earthquake Coatings Finite Element Analysis Design basis earthquake Foreign Material Exclusion Time Critical Operator Action |
ML22166A018 | 7 July 2022 | Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force | |
ML22258A038 | 28 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1245) | Pandemic Coronavirus COVID-19 COVID19 Siren |
RA-22-0179, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | 15 June 2022 | Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | |
ML22046A022 | 14 June 2022 | Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Time of Discovery Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
RA-22-0262, Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | 8 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | Pandemic COVID-19 COVID19 Siren |
ML22151A265 | 31 May 2022 | Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LAR | Surveillance Frequency Control Program |
ML22146A365 | 25 May 2022 | Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16 | |
PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 | 25 May 2022 | Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 | |
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | 24 May 2022 | Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | Exemption Request Minimum staff Grace period Siren |
RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 | 19 May 2022 | Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 | |
PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 | 19 May 2022 | Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 |