Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22350A10216 December 2022301 Exam Administrative Items (Normal release)(ADAMS-2B)
ML22294A09215 December 2022Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1Nondestructive Examination
Foreign Material Exclusion
Stress corrosion cracking
Operational leakage
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
RA-22-0347, Transmittal of Core Operating Limits Report2 December 2022Transmittal of Core Operating Limits ReportShutdown Margin
ML22339A1361 December 20222023 Requalification Program Inspection - H.B. Robinson Nuclear Plant
ML22096A00318 November 2022McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud ExaminationsAging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
ML22322A13218 November 2022301, NRC Operator License Examination Report & Cover Letter Merged
ML22256A25314 November 2022Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2Ultimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
Fire Protection Program
IR 05000261/20220033 November 2022Integrated Inspection Report 05000261 2022003Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Earthquake
Fire Protection Program
Power change
Overspeed trip
RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)1 November 2022Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
IR 05000261/202240219 October 2022Security Baseline Inspection Report 05000261/2022402
ML22285A15512 October 2022NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b
RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections4 October 2022Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
Operational leakage
ML22262A2883 October 2022Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2
ML22273A12830 September 2022News Release-II-22-025: NRC Monitoring Hurricane Ian
ML22301A16629 September 2022Presentation 4 - Recent Biennial PI&R Team Inspection InsightsCondition Adverse to Quality
IR 05000261/202201026 September 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010Ultimate heat sink
FLEX
Large early release frequency
Battery sizing
IR 05000261/202230123 September 2022301 Operator License Exam Approval Letter (05000261/2022301)
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
ML22258A03015 September 2022Evacuation Time Estimate Reports
ML22251A23514 September 2022Presentation Slides for September 14, 2022, Observation Public Meeting
ML22257A23914 September 2022Presentation Slides for September 14, 2022, Observation Public Meeting
ML22258A0399 September 2022Evacuation Time Estimate Report, Rev. 0 (Kld TR-1272)Pandemic
COVID-19
COVID19
Siren
PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 29 September 2022Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2
RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.168 September 2022Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16
ML22258A0401 September 2022Evacuation Time Estimate Reports, Rev. 0 (Kld TR-1276)Pandemic
COVID-19
COVID19
Siren
IR 05000261/202200526 August 2022Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-FinalCommercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
ML22222A10810 August 2022NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16
IR 05000261/202140410 August 2022Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404
IR 05000261/20220029 August 2022Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement DiscretionUnanalyzed Condition
Tornado Missile
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Severe Accident Management Guideline
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)9 August 2022Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)Post Accident Monitoring
ML22213A0685 August 2022Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2Affidavit
ML22193A2124 August 2022Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment InspectionsCoatings
Incorporated by reference
Moisture barrier
ML22215A2123 August 2022News Release-II-22-020: NRC Announces Resident Inspectors at Robinson Nuclear Power Plant
ML22159A2953 August 2022Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves
RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections28 July 2022Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNon-Destructive Examination
Stress corrosion cracking
Affidavit
IR 05000261/202201119 July 2022Biennial Problem Identification and Resolution Inspection Report 05000261/2022011Boric Acid
Internal Flooding
Cyber Security
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Power change
Unidentified leakage
ML22174A28714 July 2022Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2
ML22167A17014 July 2022Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsBoric Acid
High Radiation Area
Safe Shutdown Earthquake
Coatings
Finite Element Analysis
Design basis earthquake
Foreign Material Exclusion
Time Critical Operator Action
ML22166A0187 July 2022Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force
ML22258A03828 June 2022Evacuation Time Estimate Report, Rev. 0 (Kld TR-1245)Pandemic
Coronavirus
COVID-19
COVID19
Siren
RA-22-0179, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks15 June 2022Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
ML22046A02214 June 2022Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOTime of Discovery
Surveillance Frequency Control Program
Offsite Circuit
Fire Protection Program
RA-22-0262, Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237)8 June 2022Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237)Pandemic
COVID-19
COVID19
Siren
ML22151A26531 May 2022Presubmittal Licensee Presentation for 3.3.2 ESFAS Proposed LARSurveillance Frequency Control Program
ML22146A36525 May 2022Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16
PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 225 May 2022Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes24 May 2022Duke Energy Common Emergency Plan, Revision 2, Summary of ChangesExemption Request
Minimum staff
Grace period
Siren
RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-0219 May 2022Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02
PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 219 May 2022Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2