 Issue dateTitleTopic
ML22362A11429 December 2022Project Manager Assignment
ML22318A21527 December 2022Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage TankAnticipated operational occurrence
Temporary Modification
Cyber Security
Qualified Offsite Circuit
Aging Management
Surveillance Frequency Control Program
ML23006A12819 December 20220 to Updated Safety Analysis Report, Appendix I, Revision 38, Evaluation of High Energy Line Breaks Outside Containment
ML23006A14819 December 20220 to Updated Safety Analysis Report, Section 14, Plant Safety AnalysisShutdown Margin
Safety Limit Minimum Critical Power Ratio
Stroke time
Anticipated operational occurrence
Coast down
ML23006A15019 December 20220 to Updated Safety Analysis Report, Section 8, Plant Electrical SystemSafe Shutdown
Fire Barrier
Post Accident Monitoring
Operator Manual Action
Emergency Lighting
Open Phase Condition
Earthquake
Power-Operated Valves
Power Operated Valves
ML23006A12719 December 20220 to Updated Safety Analysis Report, Section 7, Plant Instrumentation and Control SystemSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Abnormal operational transient
Design basis earthquake
Scram Discharge Volume
Excess Flow Check Valve
Earthquake
Power change
Power Uprate
Failure to Scram
ML23006A14019 December 20220 to Updated Safety Analysis Report, Section 11, Plant Power Conversion System
ML23006A13619 December 20220 to Updated Safety Analysis Report, Appendix D, Revision 35, Pre-Operational and Startup TestsShutdown Margin
Hydrostatic
Squib
ML23006A14119 December 20220 to Updated Safety Analysis Report, Section 9, Plant Radioactive Waste Control SystemsOffsite Dose Calculation Manual
Operating Basis Earthquake
Annual Radioactive Effluent Release Report
Process Control Program
Fuel cladding
ML23006A13319 December 2022Submittal of Revision 40 to Updated Safety Analysis ReportSafe Shutdown
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
License Renewal
Subsequent License Renewal
Fire Protection Program
ML23006A12919 December 20220 to Updated Safety Analysis Report, Table of ContentsPower Operated Valves
Fuel cladding
Fire Protection Program
ML23006A15219 December 20220 to Updated Safety Analysis Report, Section 4, Reactor Coolant SystemSafe Shutdown
Stroke time
Hydrostatic
Incorporated by reference
Finite Element Analysis
Pressure and Temperature Limits Report
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Flow Induced Vibration
Unidentified leakage
Power Uprate
ML23006A13019 December 20220 to Updated Safety Analysis Report, Section 1, Introduction and SummarySafe Shutdown
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Fuel cladding
ML23006A13919 December 20220 to Updated Safety Analysis Report, Section 2, Site and EnvironsSafe Shutdown
High winds
Offsite Dose Calculation Manual
Design basis earthquake
Earthquake
Power Uprate
ML23006A14419 December 20220 to Updated Safety Analysis Report, Section 5, Containment SystemSafe Shutdown
L-MT-22-021, 0 to Updated Safety Analysis Report, Appendix K, Revision 37, Renewed Operating License-USAR Supplement19 December 20220 to Updated Safety Analysis Report, Appendix K, Revision 37, Renewed Operating License-USAR SupplementFire Barrier
Anticipated operational occurrence
Hydrostatic
Coatings
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Maintenance Rule Program
Biofouling
EVT-1
Fire Protection Program
Power Uprate
ML23006A13219 December 20220 to Updated Safety Analysis Report, Appendix H, Revision 29, Reactor Pressure Vessel Design Summary ReportWeld Overlay
Hydrostatic
Liquid penetrant
ML23006A15619 December 20220 to Updated Safety Analysis Report, Appendix E, Revision 35, Plant Comparative Evaluation with the Proposed AEC 70 Design CriteriaShutdown Margin
Hydrostatic
Earthquake
Fuel cladding
Power change
ML23006A14719 December 20220 to Updated Safety Analysis Report, Section 15, Table of Contents - USAR Drawings
ML23006A14319 December 20220 to Updated Safety Analysis Report, Section 13, Plant OperationsSafe Shutdown
Fitness for Duty
Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Severe Accident Management Guideline
Power Operated Valves
ML23006A14219 December 20220 to Updated Safety Analysis Report, Appendix G, Probable Maximum Flood at Mississippi at Monticello Minnesota May 26, 1969
ML23006A14519 December 20220 to Updated Safety Analysis Report, Section 6, Plant Engineered SafeguardsReactor Vessel Water Level
Hydrostatic
Squib
Surveillance Frequency Control Program
Design basis earthquake
Fuel cladding
Coast down
Power Uprate
ML23006A13819 December 20220 to Updated Safety Analysis Report, Appendix J, Revision 40, Fire Protection ProgramFire Protection Program
ML23006A13519 December 20220 to Updated Safety Analysis Report, Appendix a, Revision 29, Seismic Design Criteria
ML23006A15319 December 20220 to Updated Safety Analysis Report, Appendix C, Revision 26, Quality Assurance Program
ML23006A15519 December 20220 to Updated Safety Analysis Report, Section 3, ReactorShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Abnormal operational transient
Scram Discharge Volume
MELLLA
Earthquake
Fuel cladding
Flow Induced Vibration
ML23006A15119 December 20220 to Updated Safety Analysis Report, Appendix F, Containment Vessel DesignEarthquake
Scaffolding
ML23006A13419 December 20220 to Updated Safety Analysis Report, List of Effective Pages
ML23006A13719 December 20220 to Updated Safety Analysis Report, Section 15-2 Drawing Set
ML23006A14619 December 20220 to Updated Safety Analysis Report, Section 12, Plant Structures and ShieldingSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
Scram Discharge Volume
Earthquake
Control of Heavy Loads
Turbine Missile
Flow Induced Vibration
Power Uprate
ML23006A14919 December 20220 to Updated Safety Analysis Report, Section 10, Plant Auxiliary SystemsHot Short
Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Non-Destructive Examination
Mission time
Grab sample
Fire Barrier
Internal Flooding
Coatings
Fire impairment
Zebra Mussel
Emergency Lighting
Exemption Request
Earthquake
Control of Heavy Loads
Biofouling
Fire Protection Program
Fire Watch
Hourly Fire Watch
Backfit
Unidentified leakage
Unidentified leak
Siren
Power Uprate
IR 05000263/202201215 December 2022Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000263/2022012Scaffolding
Weak link
L-MT-22-049, Industry Groundwater Protection Initiative Special Report15 December 2022Industry Groundwater Protection Initiative Special ReportOffsite Dose Calculation Manual
L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative15 December 2022L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative
L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.4613 December 20222022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46
L-MT-22-048, Update to the Monticello Technical Specification Bases28 November 2022Update to the Monticello Technical Specification Bases
IR 05000263/202201321 November 2022Biennial Problem Identification and Resolution Inspection Report 05000263/2022013Packing leak
Cyber Security
Condition Adverse to Quality
FLEX
Scaffolding
Inattentive
Siren
IR 05000263/202230121 November 2022NRC Initial License Examination Report 05000263/2022301Job Performance Measure
IR 05000263/202200317 November 2022Reissue - Monticello Nuclear Generating Plant - Integrated Inspection Report 05000263/2022003Ultimate heat sink
Internal Flooding
Temporary Modification
Zebra Mussel
Functionality Assessment
FLEX
Aging Management
Significance Determination Process
Operability Determination
License Renewal
Fire Protection Program
ML22314A21616 November 2022Withdrawal of Alternative Request VR-08
ML22307A18214 November 2022Integrated Inspection Report 05000263/2022003Ultimate heat sink
Internal Flooding
Temporary Modification
Zebra Mussel
Functionality Assessment
FLEX
Aging Management
Fire Protection Program
L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval10 November 2022Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval
ML22308A19610 November 2022Regulatory Audit Report Regarding License Amendment Request to Transition to Atrium 11 FuelAnticipated operational occurrence
ML23011A25110 November 2022Form 1.3-1
ML23011A33610 November 2022Form 2.1-1Job Performance Measure
L-MT-22-045, Letter Submitting Post-Exam Package4 November 2022Letter Submitting Post-Exam Package
ML22264A10631 October 2022Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance FrequencyUltimate heat sink
Foreign Material Exclusion
ML22292A01224 October 2022Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022License Renewal
Subsequent License Renewal
ML23011A33921 October 2022Form 5.1-1
IR 05000263/202240319 October 2022Security Baseline Inspection Report 05000263/2022403 (Public)Affidavit