ML22362A114 | 29 December 2022 | Project Manager Assignment | |
ML22318A215 | 27 December 2022 | Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | Anticipated operational occurrence Temporary Modification Cyber Security Qualified Offsite Circuit Aging Management Surveillance Frequency Control Program |
ML23006A128 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix I, Revision 38, Evaluation of High Energy Line Breaks Outside Containment | |
ML23006A148 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 14, Plant Safety Analysis | Shutdown Margin Safety Limit Minimum Critical Power Ratio Stroke time Anticipated operational occurrence Coast down |
ML23006A150 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 8, Plant Electrical System | Safe Shutdown Fire Barrier Post Accident Monitoring Operator Manual Action Emergency Lighting Open Phase Condition Earthquake Power-Operated Valves Power Operated Valves |
ML23006A127 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 7, Plant Instrumentation and Control System | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Offsite Dose Calculation Manual Abnormal operational transient Design basis earthquake Scram Discharge Volume Excess Flow Check Valve Earthquake Power change Power Uprate Failure to Scram |
ML23006A140 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 11, Plant Power Conversion System | |
ML23006A136 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix D, Revision 35, Pre-Operational and Startup Tests | Shutdown Margin Hydrostatic Squib |
ML23006A141 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 9, Plant Radioactive Waste Control Systems | Offsite Dose Calculation Manual Operating Basis Earthquake Annual Radioactive Effluent Release Report Process Control Program Fuel cladding |
ML23006A133 | 19 December 2022 | Submittal of Revision 40 to Updated Safety Analysis Report | Safe Shutdown Incorporated by reference Aging Management Surveillance Frequency Control Program License Renewal Subsequent License Renewal Fire Protection Program |
ML23006A129 | 19 December 2022 | 0 to Updated Safety Analysis Report, Table of Contents | Power Operated Valves Fuel cladding Fire Protection Program |
ML23006A152 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 4, Reactor Coolant System | Safe Shutdown Stroke time Hydrostatic Incorporated by reference Finite Element Analysis Pressure and Temperature Limits Report Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Flow Induced Vibration Unidentified leakage Power Uprate |
ML23006A130 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 1, Introduction and Summary | Safe Shutdown Offsite Dose Calculation Manual Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Fuel cladding |
ML23006A139 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 2, Site and Environs | Safe Shutdown High winds Offsite Dose Calculation Manual Design basis earthquake Earthquake Power Uprate |
ML23006A144 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 5, Containment System | Safe Shutdown |
L-MT-22-021, 0 to Updated Safety Analysis Report, Appendix K, Revision 37, Renewed Operating License-USAR Supplement | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix K, Revision 37, Renewed Operating License-USAR Supplement | Fire Barrier Anticipated operational occurrence Hydrostatic Coatings Aging Management Moisture barrier License Renewal Subsequent License Renewal Maintenance Rule Program Biofouling EVT-1 Fire Protection Program Power Uprate |
ML23006A132 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix H, Revision 29, Reactor Pressure Vessel Design Summary Report | Weld Overlay Hydrostatic Liquid penetrant |
ML23006A156 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix E, Revision 35, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria | Shutdown Margin Hydrostatic Earthquake Fuel cladding Power change |
ML23006A147 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 15, Table of Contents - USAR Drawings | |
ML23006A143 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 13, Plant Operations | Safe Shutdown Fitness for Duty Safe Shutdown Earthquake Operating Basis Earthquake Cyber Security Incorporated by reference Surveillance Frequency Control Program Severe Accident Management Guideline Power Operated Valves |
ML23006A142 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix G, Probable Maximum Flood at Mississippi at Monticello Minnesota May 26, 1969 | |
ML23006A145 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 6, Plant Engineered Safeguards | Reactor Vessel Water Level Hydrostatic Squib Surveillance Frequency Control Program Design basis earthquake Fuel cladding Coast down Power Uprate |
ML23006A138 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix J, Revision 40, Fire Protection Program | Fire Protection Program |
ML23006A135 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix a, Revision 29, Seismic Design Criteria | |
ML23006A153 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix C, Revision 26, Quality Assurance Program | |
ML23006A155 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 3, Reactor | Shutdown Margin Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Abnormal operational transient Scram Discharge Volume MELLLA Earthquake Fuel cladding Flow Induced Vibration |
ML23006A151 | 19 December 2022 | 0 to Updated Safety Analysis Report, Appendix F, Containment Vessel Design | Earthquake Scaffolding |
ML23006A134 | 19 December 2022 | 0 to Updated Safety Analysis Report, List of Effective Pages | |
ML23006A137 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 15-2 Drawing Set | |
ML23006A146 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 12, Plant Structures and Shielding | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Design basis earthquake Scram Discharge Volume Earthquake Control of Heavy Loads Turbine Missile Flow Induced Vibration Power Uprate |
ML23006A149 | 19 December 2022 | 0 to Updated Safety Analysis Report, Section 10, Plant Auxiliary Systems | Hot Short Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Mission time Grab sample Fire Barrier Internal Flooding Coatings Fire impairment Zebra Mussel Emergency Lighting Exemption Request Earthquake Control of Heavy Loads Biofouling Fire Protection Program Fire Watch Hourly Fire Watch Backfit Unidentified leakage Unidentified leak Siren Power Uprate |
IR 05000263/2022012 | 15 December 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000263/2022012 | Scaffolding Weak link |
L-MT-22-049, Industry Groundwater Protection Initiative Special Report | 15 December 2022 | Industry Groundwater Protection Initiative Special Report | Offsite Dose Calculation Manual |
L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | 15 December 2022 | L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | |
L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 13 December 2022 | 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | |
L-MT-22-048, Update to the Monticello Technical Specification Bases | 28 November 2022 | Update to the Monticello Technical Specification Bases | |
IR 05000263/2022013 | 21 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000263/2022013 | Packing leak Cyber Security Condition Adverse to Quality FLEX Scaffolding Inattentive Siren |
IR 05000263/2022301 | 21 November 2022 | NRC Initial License Examination Report 05000263/2022301 | Job Performance Measure |
IR 05000263/2022003 | 17 November 2022 | Reissue - Monticello Nuclear Generating Plant - Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination License Renewal Fire Protection Program |
ML22314A216 | 16 November 2022 | Withdrawal of Alternative Request VR-08 | |
ML22307A182 | 14 November 2022 | Integrated Inspection Report 05000263/2022003 | Ultimate heat sink Internal Flooding Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Fire Protection Program |
L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | 10 November 2022 | Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | |
ML22308A196 | 10 November 2022 | Regulatory Audit Report Regarding License Amendment Request to Transition to Atrium 11 Fuel | Anticipated operational occurrence |
ML23011A251 | 10 November 2022 | Form 1.3-1 | |
ML23011A336 | 10 November 2022 | Form 2.1-1 | Job Performance Measure |
L-MT-22-045, Letter Submitting Post-Exam Package | 4 November 2022 | Letter Submitting Post-Exam Package | |
ML22264A106 | 31 October 2022 | Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency | Ultimate heat sink Foreign Material Exclusion |
ML22292A012 | 24 October 2022 | Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022 | License Renewal Subsequent License Renewal |
ML23011A339 | 21 October 2022 | Form 5.1-1 | |
IR 05000263/2022403 | 19 October 2022 | Security Baseline Inspection Report 05000263/2022403 (Public) | Affidavit |