ML23006A134

From kanterella
Jump to navigation Jump to search
0 to Updated Safety Analysis Report, List of Effective Pages
ML23006A134
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/19/2022
From:
Xcel Energy, Northern States Power Company, Minnesota
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23006A159 List:
References
L-MT-22-021
Download: ML23006A134 (1)


Text

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 1 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

Volume 1 List of Effective Pages 40 604000000753, 604000000761, 604000000815, 604000000820, 604000000832, 604000000841, 604000000842 Table of Contents 40 604000000842 Section 1 37 604000000832 1 TOC 1.1 1.2 1.3 604000000832 1.4 1.5 1.FIGURES Section 2 37 604000000820, 604000000832 2 TOC 2.1 2.2 604000000820, 604000000832 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.FIGURES Section 3 38 604000000753 3 TOC 3.1 604000000753 3.2 3.3 3.4 3.5 3.6 3.7 3.FIGURES

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 2 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

Section 4 36 4 TOC 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.FIGURES Volume 2 Section 5 37 5 TOC 5.1 5.2 5.3 5.4 5.FIGURES Section 6 38 6 TOC 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.FIGURES Section 7 39 7 TOC 7.1 7.2 7.3

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 3 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 7.14 7.FIGURES Volume 3 Section 8 39 8 TOC 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 8.10 8.11 8.12 8.13 8.FIGURES Section 9 35 9 TOC 9.1 9.2 9.3 9.4 9.5

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 4 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 9.FIGURES Section 10 39 10 TOC 10.1 10.2 10.3 10.4 10.5 10.FIGURES Section 11 36 11 TOC 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.FIGURES Volume 4 Section 12 36 12 TOC 12.1 12.2 12.3 12.4 12.5 12.FIGURES Section 13 38 13 TOC 13.1 13.2 13.3 13.4

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 5 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 13.5 13.6 13.7 13.8 13.9 13.10 Section 14 39 14 TOC 14.1 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.9 (Section Deleted) 14.10 14.11 14.FIGURES Section 14A Volume 5 Section 15 40 604000000842 15 TOC Volume 6 APPENDIX A 29 Volume 7 APPENDIX C 26 APPENDIX D 35 D TOC D.1 D.2 D.3 D.4 D.5 APPENDIX E 35

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 6 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

E TOC E.1 E.2 APPENDIX F 18 Volume 8 APPENDIX G 13 APPENDIX H 29 APPENDIX I 38 I TOC I.1 I.2 I.3 I.4 I.5 I.6 I.FIGURES APPENDIX J 40 604000000761 J TOC J.1 J.2 J.3 J.4 J.5 604000000761 APPENDIX K 37 604000000815, 604000000841

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 7 of 8 Revision (Rev) No. Effective Date Date of Issue Remarks ORIGINAL 10/81 5/1/82 1 10/82 4/29/83 2 10/83 4/30/84 3 12/84 6/28/85 4 12/85 6/30/86 Added Appendices A thru I 5 12/86 6/30/87 6 12/87 6/30/88 7 12/88 6/30/89 8 11/56 11/4/89 Modified Containment Isolation Valve List to Coordinate Removal of the List from the Tech Spec 9 12/89 6/29/90 10 12/90 6/28/91 11 12/91 6/30/92 12 9/93 9/1/93 Reprint of USAR sections 1 through 14 due to placement of these sections on the Monticello Site Technical Publishing System 13 5/95 4/20/95 Reprint of USAR Appendix D, E, and I due to placement of these sections on the Monticello Site Technical Publishing System 14 5/96 11/18/96 15 7/97 10/31/97 Revision to Section 5.2 response to Treatment of Commitments as License Conditions (TAC No. 97781) and Tech Spec Amendment 98 license condition.

16 7/98 10/23/98 General revision to reflect periodic update and initial input from USAR Review Project.

17 8/99 8/25/99 Revise sections affected by the implementation of the power rerate approved by License Amendment 102.

18 8/00 8/25/00 General revision to reflect periodic update and continuing input from USAR Review Project.

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 40 Page 8 of 8 Revision (Rev) No. Effective Date Date of Issue Remarks 19 6/02 6/11/02 General revision to reflect periodic update and continuing input from USAR Review Project.

20 5/03 11/20/03 Periodic Update 21 9/04 12/15/04 Periodic Update 22 8/05 10/12/05 Periodic Update 23 10/06 2/28/07 Periodic Update 24 10/31/06 to 8/31/07 10/25/07 Periodic Update 25 9/1/07 to 10/1/08 12/23/08 Periodic Update 26 10/1/08 to 10/09/09 10/30/09 Periodic Update 27 10/9/09 to 10/1/10 12/22/10 Periodic Update 28 10/2/10 to 10/3/11 11/16/11 6 Month update following completion of RFO25. (No later than) 29 10/4/11 to 11/13/12 12/2012 Annual Submittal 30 11/14/12 to 12/23/13 01/2014 6 Month update following completion of RFO26; July 19, 2013 31 12/24/13 to 12/10/14 1/19/2015 Annual Submittal 32 12/11/14 to 5/15/15 09/18/2015 General revision to incorporate changes, as identified under Corrective Action Program, Action Request number 01462588.

33 5/16/15 to 11/24/15 01/26/2016 Annual Submittal 34 11/25/15 to 11/15/16 01/11/2017 Annual Submittal 35 11/16/16 to 10/16/17 01/11/2018 Annual Submittal 36 10/17/17 to 11/01/18 01/09/2019 Annual Submittal 37 11/02/18 to 10/15/19 12/13/2019 Annual Submittal 38 10/16/19 to 12/15/20 02/11/2021 Annual Submittal 39 12/16/20 to 12/16/21 02/2022 Annual Submittal 40 12/17/21 to 10/28/22 Annual Submittal