Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:L24711 | 31 December 2013 | ||
ML13365A193 | 31 December 2013 | Letter to B. L. Ivey Denial of Request for Exemption from 10 CFR 72.30 Requirements for Southern Nuclear Operating Company - (TAC Nos. L24711, L24712, and L24713) | Enforcement Discretion Decommissioning Funding Plan Exemption Request |
ML13361A025 | 26 December 2013 | NRR E-mail Capture - Edwin I. Hatch Nuclear Plant, Units 1 and 2: Request for Information: Alternative HNP-ISI-ALT-18, Version 1, Leakage Test of Reactor Pressure Vessel Flange LEAK-OFF Piping | |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
NL-13-2576, CFR50.46 ECCS Evaluation Model Annual Report for 2012 | 23 December 2013 | CFR50.46 ECCS Evaluation Model Annual Report for 2012 | |
ML14035A613 | 18 December 2013 | E.I. Hatch, Single Positive Test Form, for Random, Collected on 12/09/2013 | |
ML13351A424 | 16 December 2013 | ISI Program Alternative HNP-ISI-ALT-18, Version 1 | Hydrostatic VT-2 |
NL-13-2521, Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 1 | 16 December 2013 | Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 1 | Hydrostatic VT-2 |
NL-13-2560, Certificate Pertaining to FOCI Information Update | 16 December 2013 | Certificate Pertaining to FOCI Information Update | |
TAC:MF3228 | 16 December 2013 | ||
NL-13-2521, ISI Program Alternative HNP-ISI-ALT-18, Version 1 | 16 December 2013 | ISI Program Alternative HNP-ISI-ALT-18, Version 1 | Hydrostatic VT-2 |
IR 05000321/2013403 | 13 December 2013 | IR 05000321-13-403 and 05000366-13-403, 12/05/2013, Edwin I. Hatch Nuclear Plant - Cover Letter | Affidavit |
ML13311B919 | 13 December 2013 | Joseph M. Farley Nuclear Plant, and Vogel Electric Generating Plant - Request for Use of Delta Protection Murrow Fr Supplied Air Suits and the Murrow Blue Suit Systems (TAC Mfa, Mfa, MF1853, MF1854, MF1855) | Mururoa |
TAC:MF1176 | 11 December 2013 | ||
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | |
IR 05000321/2013503 | 3 December 2013 | IR 05000321-13-503 & 05000366-13-503; on 11/11/2013 - 11/15/2013; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exercise Evaluation -Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification | Siren |
ML13322B259 | 2 December 2013 | Request for Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805 | Enforcement Discretion Operator Manual Action Fire Protection Program |
TAC:MF3043 | 2 December 2013 | ||
ML14035A614 | 27 November 2013 | E.I. Hatch, Single Positive Test Form, for Pre-Access, Collected on 11/21/2013 | |
NL-13-2383, Certificate Pertaining to FOCI Information Update | 27 November 2013 | Certificate Pertaining to FOCI Information Update | |
ML14035A620 | 27 November 2013 | E.I. Hatch, Single Positive Test Form, for Pre-Access, Collected on 11/05/2013 | |
NL-13-2340, Evacuation Time Estimates Update | 26 November 2013 | Evacuation Time Estimates Update | |
TAC:MF0130 | 25 November 2013 | ||
NL-13-2370, Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns | 25 November 2013 | Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns | |
NL-13-2418, Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical Report | 21 November 2013 | Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical Report | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program |
ML13324A261 | 18 November 2013 | Initial Exam 2013-301 Draft SRO Written Exams | Safe Shutdown Unanalyzed Condition Time of Discovery Shutdown Margin Reactor Vessel Water Level Half scram Offsite Dose Calculation Manual Anticipated operational occurrence FLEX Surveillance Frequency Control Program Deep Dose Equivalent Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change |
ML13324A306 | 18 November 2013 | Initial Exam 2013-301 Draft Administrative JPMs | High Radiation Area Fire Watch |
ML13324A210 | 18 November 2013 | Initial Exam 2013-301 Draft Administrative Documents | Water Inventory Control |
ML13324A590 | 18 November 2013 | Initial Exam 2013-301 Final Administrative JPMs | High Radiation Area Fire Watch |
ML13324A228 | 18 November 2013 | Initial Exam 2013-301 Draft RO Written Exams | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Stroke time Hydrostatic Operator Manual Action Squib Emergency Lighting Surveillance Frequency Control Program Scram Discharge Volume MELLLA Severe Accident Management Guideline Containment Hardened Vent Overtravel Earthquake Deep Dose Equivalent Fire Watch Power change Coast down |
ML13324A602 | 18 November 2013 | Initial Exam 2013-301 Final Simulator Scenarios | Reactor Vessel Water Level Loop seal Squib Earthquake Offsite Circuit Power change |
ML13324A509 | 18 November 2013 | Initial Exam 2013-301 Draft Simulator Scenarios | Reactor Vessel Water Level Loop seal Squib Scram Discharge Volume Earthquake Offsite Circuit Power change |
ML13324A598 | 18 November 2013 | Initial Exam 2013-301 Final Sim IN-plant JPMs | Stroke time |
ML13324A369 | 18 November 2013 | Initial Exam 2013-301 Draft Sim In-plant JPMs | Stroke time |
ML13324A521 | 18 November 2013 | Initial Exam 2013-301 Final Administrative Documents | Water Inventory Control Job Performance Measure |
IR 05000321/2013008 | 14 November 2013 | IR 05000321-13-008, 05000366-13-008; September 16-20 & 30, 2013 - October 4, 2013; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Biennial Inspection of the Problem Identification and Resolution Program | Functionality Assessment Operability Determination |
ML13277A382 | 4 November 2013 | Notice of Forthcoming Meeting with Southern Nuclear on Polyethylene Pipe for Hatch Service Water Systems | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
IR 05000321/2013004 | 31 October 2013 | IR 05000321-13-004, 05000366-13-004, on 07/01/2013-09/30/2013, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Follow-up of Events and Notices of Enforcement Discretion | Enforcement Discretion Functionality Assessment Significance Determination Process Scram Discharge Volume Operability Determination Continuous fire watch Fire Protection Program |
ML13294A529 | 28 October 2013 | Interim Staff Evaluation and Request for Additional Information - Hatch Nuclear Plant, Units 1 and 2 (HNP) Regarding Overall Integrated Plan (OIP) for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
IR 05000321/2013404 | 23 October 2013 | IR 05000321-13-404 & 05000366-13-404, 9/13/2013, Edwin I. Hatch Nuclear Plant; NRC Temporary Instruction 2201/004; Inspection of Implementation of Interim Cyber Security Milestones 1-7 | Enforcement Discretion Cyber Security Affidavit |
ML13296A028 | 18 October 2013 | Initial Exam 2013-301 Final SRO Written Exam | Squib Earthquake |
ML13296A029 | 18 October 2013 | Initial Exam 2013-301 Final RO Written Exam | Squib Earthquake |
NL-13-2180, Edwin Hatch - Letter of Intent to Adopt the 2001 Edition of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants | 4 October 2013 | Edwin Hatch - Letter of Intent to Adopt the 2001 Edition of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants | Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Fire Protection Program |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
ML13274A669 | 26 September 2013 | September 2013 - Hatch NRC Generic Fundamentals Examination Results | Generic Fundamentals Examination |
NL-13-2086, Registration of Spent Fuel Cask Use | 23 September 2013 | Registration of Spent Fuel Cask Use | |
ML14035A607 | 20 September 2013 | E.I. Hatch, Single Positive Test Form, for Random, Collected on 08/05/2013 |