Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:L2471131 December 2013
ML13365A19331 December 2013Letter to B. L. Ivey Denial of Request for Exemption from 10 CFR 72.30 Requirements for Southern Nuclear Operating Company - (TAC Nos. L24711, L24712, and L24713)Enforcement Discretion
Decommissioning Funding Plan
Exemption Request
ML13361A02526 December 2013NRR E-mail Capture - Edwin I. Hatch Nuclear Plant, Units 1 and 2: Request for Information: Alternative HNP-ISI-ALT-18, Version 1, Leakage Test of Reactor Pressure Vessel Flange LEAK-OFF Piping
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
NL-13-2576, CFR50.46 ECCS Evaluation Model Annual Report for 201223 December 2013CFR50.46 ECCS Evaluation Model Annual Report for 2012
ML14035A61318 December 2013E.I. Hatch, Single Positive Test Form, for Random, Collected on 12/09/2013
ML13351A42416 December 2013ISI Program Alternative HNP-ISI-ALT-18, Version 1Hydrostatic
VT-2
NL-13-2521, Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 116 December 2013Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 1Hydrostatic
VT-2
NL-13-2560, Certificate Pertaining to FOCI Information Update16 December 2013Certificate Pertaining to FOCI Information Update
TAC:MF322816 December 2013
NL-13-2521, ISI Program Alternative HNP-ISI-ALT-18, Version 116 December 2013ISI Program Alternative HNP-ISI-ALT-18, Version 1Hydrostatic
VT-2
IR 05000321/201340313 December 2013IR 05000321-13-403 and 05000366-13-403, 12/05/2013, Edwin I. Hatch Nuclear Plant - Cover LetterAffidavit
ML13311B91913 December 2013Joseph M. Farley Nuclear Plant, and Vogel Electric Generating Plant - Request for Use of Delta Protection Murrow Fr Supplied Air Suits and the Murrow Blue Suit Systems (TAC Mfa, Mfa, MF1853, MF1854, MF1855)Mururoa
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters
IR 05000321/20135033 December 2013IR 05000321-13-503 & 05000366-13-503; on 11/11/2013 - 11/15/2013; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exercise Evaluation -Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator VerificationSiren
ML13322B2592 December 2013Request for Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805Enforcement Discretion
Operator Manual Action
Fire Protection Program
TAC:MF30432 December 2013
ML14035A61427 November 2013E.I. Hatch, Single Positive Test Form, for Pre-Access, Collected on 11/21/2013
NL-13-2383, Certificate Pertaining to FOCI Information Update27 November 2013Certificate Pertaining to FOCI Information Update
ML14035A62027 November 2013E.I. Hatch, Single Positive Test Form, for Pre-Access, Collected on 11/05/2013
NL-13-2340, Evacuation Time Estimates Update26 November 2013Evacuation Time Estimates Update
TAC:MF013025 November 2013
NL-13-2370, Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns25 November 2013Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns
NL-13-2418, Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical Report21 November 2013Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical ReportFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
ML13324A26118 November 2013Initial Exam 2013-301 Draft SRO Written ExamsSafe Shutdown
Unanalyzed Condition
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
Half scram
Offsite Dose Calculation Manual
Anticipated operational occurrence
FLEX
Surveillance Frequency Control Program
Deep Dose Equivalent
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
ML13324A30618 November 2013Initial Exam 2013-301 Draft Administrative JPMsHigh Radiation Area
Fire Watch
ML13324A21018 November 2013Initial Exam 2013-301 Draft Administrative DocumentsWater Inventory Control
ML13324A59018 November 2013Initial Exam 2013-301 Final Administrative JPMsHigh Radiation Area
Fire Watch
ML13324A22818 November 2013Initial Exam 2013-301 Draft RO Written ExamsSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Stroke time
Hydrostatic
Operator Manual Action
Squib
Emergency Lighting
Surveillance Frequency Control Program
Scram Discharge Volume
MELLLA
Severe Accident Management Guideline
Containment Hardened Vent
Overtravel
Earthquake
Deep Dose Equivalent
Fire Watch
Power change
Coast down
ML13324A60218 November 2013Initial Exam 2013-301 Final Simulator ScenariosReactor Vessel Water Level
Loop seal
Squib
Earthquake
Offsite Circuit
Power change
ML13324A50918 November 2013Initial Exam 2013-301 Draft Simulator ScenariosReactor Vessel Water Level
Loop seal
Squib
Scram Discharge Volume
Earthquake
Offsite Circuit
Power change
ML13324A59818 November 2013Initial Exam 2013-301 Final Sim IN-plant JPMsStroke time
ML13324A36918 November 2013Initial Exam 2013-301 Draft Sim In-plant JPMsStroke time
ML13324A52118 November 2013Initial Exam 2013-301 Final Administrative DocumentsWater Inventory Control
Job Performance Measure
IR 05000321/201300814 November 2013IR 05000321-13-008, 05000366-13-008; September 16-20 & 30, 2013 - October 4, 2013; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Biennial Inspection of the Problem Identification and Resolution ProgramFunctionality Assessment
Operability Determination
ML13277A3824 November 2013Notice of Forthcoming Meeting with Southern Nuclear on Polyethylene Pipe for Hatch Service Water Systems
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
IR 05000321/201300431 October 2013IR 05000321-13-004, 05000366-13-004, on 07/01/2013-09/30/2013, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Follow-up of Events and Notices of Enforcement DiscretionEnforcement Discretion
Functionality Assessment
Significance Determination Process
Scram Discharge Volume
Operability Determination
Continuous fire watch
Fire Protection Program
ML13294A52928 October 2013Interim Staff Evaluation and Request for Additional Information - Hatch Nuclear Plant, Units 1 and 2 (HNP) Regarding Overall Integrated Plan (OIP) for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
IR 05000321/201340423 October 2013IR 05000321-13-404 & 05000366-13-404, 9/13/2013, Edwin I. Hatch Nuclear Plant; NRC Temporary Instruction 2201/004; Inspection of Implementation of Interim Cyber Security Milestones 1-7Enforcement Discretion
Cyber Security
Affidavit
ML13296A02818 October 2013Initial Exam 2013-301 Final SRO Written ExamSquib
Earthquake
ML13296A02918 October 2013Initial Exam 2013-301 Final RO Written ExamSquib
Earthquake
NL-13-2180, Edwin Hatch - Letter of Intent to Adopt the 2001 Edition of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants4 October 2013Edwin Hatch - Letter of Intent to Adopt the 2001 Edition of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating PlantsEnforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13274A66926 September 2013September 2013 - Hatch NRC Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
NL-13-2086, Registration of Spent Fuel Cask Use23 September 2013Registration of Spent Fuel Cask Use
ML14035A60720 September 2013E.I. Hatch, Single Positive Test Form, for Random, Collected on 08/05/2013