October 23, 2013 The Operating Power Reactors on Enclosed List
SUBJECT:
RESPONSE REGARDING LICENSEE PHASE 1 STAFFING SUBMITTALS ASSOCIATED WITH NEAR-TERM TASK FORCE RECOMMENDATION 9.3 RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT By letter dated March 12, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12053A340), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information (RFI) pursuant to Section 50.54, paragraph (f), of Title 10 of the Code of Federal Regulations (10 CFR), regarding Recommendations 2.1 (seismic and flooding evaluations), 2.3 (seismic and flooding walkdowns), and 9.3 (emergency preparedness communication and staffing) of the Near-Term Task Force (NTTF) review of insights from the Fukushima Dai-ichi accident. With respect to Recommendation 9.3, Enclosure 5 to the NRC's letter requested licensees to assess their means to power communications equipment onsite and offsite during a prolonged station blackout (SBO) event and to perform a staffing assessment to determine the staff required to fill all necessary positions in response to a multi-unit event.
The RFI, in part, requested responses pursuant to the provisions of 10 CFR 50.54(f) pertaining to onsite and augmented staff availability to implement the strategies discussed in the emergency plan and/or plant operating procedures including new staff or functions resulting from the assessment including any identified collateral duties, an implementation schedule to perform the assessments including any identified modifications, and any changes that have been made or will be made to the emergency plan regarding on-shift or augmented staffing. In addition, NTTF Recommendation 9.3 has a dependency on the implementation of NTTF Recommendation 4.2 (mitigation strategies). As a result of this dependency, licensees are responding to the RFI in phases. Licensees evaluated their ability to respond to a multi-unit SBO event utilizing existing processes and procedures in their Phase 1 staffing assessments.
All the licensee responses to the RFI for the Phase 1 staffing assessments were received by April 30, 2013.
In accordance with the NRC-endorsed guidance and assumptions of Nuclear Energy Institute (NEI 12-01) Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities, Sections 2.2, 2.3, and 3, the NRC staff reviewed your Phase 1 staffing assessment. You assessed your current onsite staffing levels to respond to an event following a beyond design basis large-scale natural event to identify any needed enhancements to ensure that the strategies contained in the existing emergency plan and/or plant operating procedures, such as a SBO, can be performed by the site staff. Your assessments assumed that a large-scale natural event causes: (1) all units on the site to be affected, (2) there is an extended loss of all alternating current (ac) power, and (3) access to the site is impeded for a minimum of six hours.
You conducted independent reviews and concluded, based on your staffing assessment, that the existing on-shift staff is sufficient to implement the existing loss of all ac power, multi-unit event response strategies, while supporting performance of the required emergency planning duties without unacceptable collateral duties.
The NRC staff reviewed your Phase 1 submittal and confirmed that the onsite minimum staff, as described in your emergency plan, is sufficient to support required plant actions and emergency plan functions, without the assignment of collateral duties that would impact the performance of assigned emergency plan functions. As a result, the NRC staff concludes that your Phase 1 staffing submittal adequately addresses the response strategies needed to respond to an event that results in a SBO using your plants current procedures.
The NRC staff recognizes that licensees in coordination with the NTTF Recommendation 4.2 (mitigation strategies), will submit for NRC staff review a Phase 2 staffing assessment, which will provide an assessment of the staffing necessary to perform the functions related to the strategies developed in response to NTTF Recommendation 4.2.
Should you have any questions regarding this letter, please contact Brian K. Harris at (301) 415-2277.
Sincerely,
/RA/
Michele G. Evans, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
Operating Power Reactors cc w/encl: Distribution via Listserv
ML13233A183 OFFICE NRR/JLD/PMB NRR/JLD/LA NSIR/DPR/DDEP/NRLB NAME BHarris SLent KWilliams DATE 08/30/13 08/30/13 09/5/13 OFFICE NRR/JLD/PMB NRR/JLD/PMB NRR/DORL NAME MMitchell BHarris MEvans DATE 09/24/13 09/24/13 10/23/13
Letter from Michele G. Evans to Listed Operating Power Reactor Plants dated October 23, 2013
SUBJECT:
RESPONSE REGARDING LICENSEE PHASE 1 STAFFING SUBMITTALS ASSOCIATED WITH NEAR-TERM TASK FORCE RECOMMENDATION 9.3 RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT DISTRIBUTION:
PUBLIC LPL1-1 R/F LPL1-2 R/F LPL2-1 R/F LPL2-2 R/F LPL3-1 R/F LPL3-2 R/F LPL4 R/F RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2 RidsNrrDorlLpl2-1 RidsNrrDorlLpl2-2 RidsNrrDorlLpl3-1 RidsNrrDorlLpl3-2 RidsNrrDorlLpl4 RidsOgcMailCenter RidsNrrLAABaxter RidsNrrLAJBurkhardt RidsNrrLABClayton RidsNrrLASFigueroa RidsNrrLAKGoldstein RidsNrrLASRohrer RidsNrrLAMHenderson RidsNrrPMBeaverValley RidsNrrPMBraidwood RidsNrrPMBrownsFerry RidsNrrPMBrunswick RidsNrrPMByron RidsNrrPMCalvertCliffs RidsNrrPMCatawba RidsNrrPMComanchePeak RidsNrrPMDCCook RidsNrrPMDiabloCanyon RidsNrrPMDresden RidsNrrPMFarley RidsNrrPMHatch RidsNrrPMHopeCreek RidsNrrPMLaSalle RidsNrrPMLimerick RidsNrrPMMcGuire RidsNrrPMMillstone RidsNrrPMNineMilePoint RidsNrrPMNorthAnna RidsNrrPMOconee RidsNrrPMPaloVerde RidsNrrPMPeachBottom RidsNrrPMPointBeach RidsNrrPMPrairieIsland RidsNrrPMQuadCities RidsNrrPMSalem RidsNrrPMSequoyah RidsNrrPMSouthTexas RidsNrrPMSurry RidsNrrPMStLucie RidsNrrPMSusquehanna RidsNrrPMTurkeyPoint RidsNrrPMVogtle RidsRgn1MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsRgn4MailCenter Resource BHarris, NRR KWilliams, NSIR MMitchell, NRR
Enclosure Beaver Valley Power Station FirstEnergy Nuclear Operating Co.
Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Eric A. Larson Site Vice President FirstEnergy Nuclear Operating Company P.O. Box 4, Route 168 Shippingport, PA 15077 Braidwood Station Exelon Generation Co., LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Browns Ferry Nuclear Plant Tennessee Valley Authority Docket Nos. 50-259, 50-260 and 50-296 License Nos. DPR-33, DPR-52 and DPR-68 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Carolina Power & Light Co.
Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Mr. Michael J. Annacone Vice President Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 Byron Station Exelon Generation Co., LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. George H. Gellrich Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Operating Power Reactors Catawba Nuclear Station, Units 1&2 Duke Energy Carolinas, LLC Docket Nos. 50-413 & 50-414 License Nos. NPF-35 and NPF-52 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 Comanche Peak Nuclear Power Plant Luminant Generation Co., LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Luminant Generation Company, LLC Attn: Regulatory Affairs P.O. Box 1002 Glen Rose, TX 76043 Diablo Canyon Power Plant Pacific Gas & Electric Co.
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56 Mail Code 104/6 Avila Beach, CA 93424 Donald C. Cook Nuclear Plant Indiana Michigan Power Company Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Dresden Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Co.
Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Mr. C.R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295/BIN B038 Birmingham, AL 35201-1295 Hope Creek Generating Station PSEG Nuclear, LLC Docket No. 50-354 License No. NPF-57 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 Joseph M. Farley Nuclear Plant Southern Nuclear Operating Co.
Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Mr. C.R. Pierce Regulatory Affairs Director Soutern Nuclear Operating Co., Inc.
P.O. Box 1295/Bin 038 Birmingham, AL 35201-1295 LaSalle County Station Exelon Generation Co., LLC Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station Exelon Generation Co., LLC Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Millstone Nuclear Power Station Dominion Nuclear Connecticut, Inc.
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Nine Mile Point Nuclear Station Nine Mile Point Nuclear Station, LLC Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69 Mr. Christopher Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093 North Anna Power Station Virginia Electric & Power Co.
Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Oconee Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270 and 50-287 Mr. Scott Batson Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 Palo Verde Nuclear Generating Station Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529 and STN 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Mr. Randall K. Edington Executive Vice President Nuclear and Chief Nuclear Officer Arizona Public Service Co.
P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 Peach Bottom Atomic Power Station Exelon Generation Co., LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 & 2 6610 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant Northern States Power Company -
Minnesota Docket Nos. 50-282 and 50-306 Mr. James E. Lynch Northern States Power Company -
Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089-9642 Quad Cities Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Salem Nuclear Generating Station PSEG Nuclear, LLC.
Docket Nos. 50-272 & 50-311 License Nos. DPR-70 and DPR-75 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038 Sequoyah Nuclear Plant Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street LP 3D-C Chattanooga, TN 37402-2801 South Texas Project STP Nuclear Operating Co.
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 St. Lucie Plant Florida Power and Light Company Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy P. O. Box 14000 700 Universe Boulevard Juno Beach, FL 33408-0420 Susquehanna Steam Electric Station PPL Susquehanna, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 Surry Power Station Virginia Electric & Power Co.
Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Turkey Point Nuclear Generating Station Florida Power & Light Company Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy P. O. Box 14000 700 Universe Boulevard Juno Beach, FL 33408-0420 Vogtle Electric Generating Plant Southern Nuclear Operating Co.
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Mr. C.R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295/Bin 038 Birmingham, AL 35201-1295 William B.McGuire Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9and NPF-17 Mr. Steven D. Capps Vice President - McGuire Site Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985