Southern Nuclear Company Operations Training JPM DRAFT CRISIM 1 RO ONLY

Title:

START A RECIRC ADJUSTABLE SPEED DRIVE (ASD) FROM THE CONTROL ROOM thor:

Media Number:

Time Anthony Ball 2013-301 SIM 1 30 Minutes Reviewed By Date Reviewed by Instructional Technologist or designeed.

Date Approved By Date SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 SIM 1 Authors Sups Rev. No.

Date Reason for Revisions i

Initials Imtials 16 02/22/02 Include initial Operator statement RAB RAB 17 05/03/02 Revise Simulator Setup DNM DHG 18 03/01/05 Deleted S from procedure numbers, changed Revision and Rev, numbers BEB DHG to Current Version, changed Reactor Operator to Nuclear Plant Operator, changed IC 121 to IC 127 for Simulator Setup, added new prompts, changed location of some steps and prompts.

19 05/27/05 Revised Initial License statement for successful completion RAI3 RAB 20 03/30/06 Remove Response Cues RAB RAIl 21 01/06/09 This revision is meant for initial training prior to implementation of ASDs DNM RAIl on U2 during the 2009 U2 outage. It is the intent of Training & Operations CEB to perform the best training possible gathering feedback from Operators during the process & feeding this information back to Operations prior to implementation to improve procedures prior to final implementation. (Note:

originally a new JPM 04.20 was written, however this JPM was revised to modify the task and TO for the equipment and JPM 0420 not retained).

Section for Unit One will be simulate in Main Control Room due to modification on simulator to reflect changes to Unit 2.

22 4-19-il Revise JPM to reflect Unit 1 modification completion to remove the Recirc SDH DNM MG sets and associated equipment and their replacement with the Recirc ASD system. Revised Unit 2 jpm to match actual procedure steps.

23 Revised to match procedure and retitled JPM to ARB 2013-301 CR-SIM 1 for use on ILT-8 NRC Exam.

Once NRC Exam is complete will return to original title.

Line Contributors ihe following individuals contributed to the development of this lesson plan.

Rev. No.

[

List of Contributors

Page 1 of 9 UNIT1

()

UNIT2 (X)

TASK TITLE:

Start A Recirc Adjustable Speed Drive (ASD) From THE CONTROL ROOM JPM NUMBER:

2013-301 SIM 1 TASK STANDARD:

The task shall be completed when the Recirculation Motor Adjustable Speed Drive (ASD) has been started and Reactor Recirc Pump is operating at minimum speed, per 34S0-B31-O0l.

TASK NUMBER:

004.002 OBJECTIVE NUMBER:

004.002.A, 004.002.E PLANT HATCH JTA IMPORTANCE RATING:

RO 3.50 SRO 3.22 K/A CATALOG NUMBER: 202001A401 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.30 SRO 3.10 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 3450-B31-00l-2 (current version) 34AB-B3 1-001-2 (current version)

REQUIRED MATERIALS:

Unit 1 Unit 2 34S0-B31-001-2 &

(current version)

APPROXIMATE COMPLETION TIME:

30 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

Page 2 of 9 SIMULATOR SETUP Simulator Initial Conditions: This JPM can only be utilized for a perform for Unit 2.

1.

RESET the Simulator to IC #102 and leave in FREEZE or to SNAP 611.

2.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Raise RWL to >47 inches as indicated on GEMAC.

B.

Use rfB3l_29 and open Seal purge valve B31-FO16A.

3.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

4.

ESTIMATED Simulator SETUP TiME:

5 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

The 2A Reactor Recirc Pump is ready to be started per 34S0-B31-OO1-2.

2.

The 2A ASD Cooling Water System has has been running normally for greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

3.

All required system/seal venting & purging has been completed.

INITIATING CUES:

Start 2A Recirc Pump, using the normal startup section of 34S0-B31-OO1-2.

2013-301 SIM 1 Page 4 of 9 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

1.

Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.

2.

Operator confirms RPT breakers At panel 2H1 1-P602, Operator 2C71-CB3A & CB4A are closed, has confirmed RPT breakers 2C71-CB3A & CB4A CLOSED, red lights illuminated.

3.

Depress the ASD A Fault Reset At panel 2H1 1-P602, all pushbutton to reset all ASDIRecirc ASDIRecirc annunciators have annunciators whose conditions have cleared.

cleared.

PROMPT:

IF addressed by the Operator, INFORM the Operator that inside 2B3 1-SOO2AG, ASD A Cooling Cabinet, the Dry-Running Monitoring Function of each LiqTec sensor has been disabled.

PROMPT:

IF addressed by the Operator, INFORM the Operator that the ASD Cooling Water System has been in service for a minimum of two hours per Section 7.1.1.1, Startup Of The ASD A Cooling System.

(** Indicates critical step)

2013-301 SIM 1 Page 5 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 PROMPT:

WhEN the Operator addresses Cooling Water Conductivity, INFORM the Operator, the ASD SPDS screens or locally at ASD A Cooling Cabinet 2B31-SOO2AG that cooling system conductivity is <1 tS.

PROMPT:

WHEN the Operator addresses which NXG Computer is in control, INFORM the Operator, the B NXG Computer is in control.

4.

Confirm ASD A COOLING At panel 2H1 1-P602, ASD A NORMAL light is illuminated on COOLING NORMAL light is 2H1 1-P602.

illuminated..

PROMPT:

WhEN the Operator addresses Bypassed Cells, INFORM the Operator there are NO Bypassed Cells.

5.

Confirm Reactor Recirc Pump Suction At panel 2H1 1-P602, PUMP Valve, 2B31-F023A is open.

SUCTION VLV, 2B3 1 -F023A is OPEN, red light ONLY illuminated.

6.

Confirm running OR start 2T41-B012, At panel 2111 1-P657, ASD A Room Cooler, at 2H1 1-CONFIRMS running starts P657.

2T42-B012, ASD A Room Cooler red light illuminated.

PROMPT:

WHEN the Operator addresses ASD Room Cooler 2T41-B012, as the RO, INFORM the Operator that 2T41-B012 is operating.

    • 7, Confirm/Close Reactor Recirc Pump At panel 2111 l-P602, PUMP Discharge Valve, 2B31-FO31A.

DISCH VLV 2B31-FO31A is CLOSED, green light ONLY illuminated.

8.

Depress the ASD A Shutdown pushbutton, to reset the Run Request logic.

At panel 2Hl l-P602, Depresses the ASD A Shutdown pushbutton.

    • 9, Position the ASD A control switch, At panel 2H1 1-P602, ASD 2B3 I -SOO2A to START.

STARTED, red light illuminated.

( Indicates critical step)

2013-301 SUvI 1 Page 6 of 9 The ASD A PRE-CHARGING light illuminates.

After 30 seconds, the ASD A PRE CHARGING light extinguishes.

The ASD A Input Breaker CLOSES (the red light above the ASD A control switch illuminates and the green light extinguishes).

The ASD A START pushbutton light illuminates.

STANDARD SAT/UNSAT (COMMENTS)

At panel 2H1 1-P602, the Operator VERIFIES:

The ASD A PRE-CHARGING light illuminates.

After 30 seconds, the ASD A PRE-CHARGING light extinguishes.

The ASD A Input Breaker CLOSES (the red light above the ASD A control switch illuminates and the green light extinguishes).

The ASD A START pushbutton light illuminates.

I STEP PERFORMANCE STEP 10.

Confirm the following:

PROMPT:

IF addressed by the Operator, INFORM the Operator that a CRD Pump is in service to supply Seal Purge Flow.

PROMPT:

IF addressed by the Operator, INFORM the Operator that Seal Purge Isolation Valve 2B31-FO16A is open.

PROMPT:

IF addressed by the Operator, INFORM the Operator it is not required to vent the Recirc pump seals.

11.

Verify Reactor Recirc Pump Suction At panel 2H1 1-P602, PUMP Valve, 2B3 1-F023A is open.

SUCTION VLV, 2B31-F023A is OPEN, red light ONLY illuminated.

PROMPT:

WHEN the Operator addresses the Seal Flow Regulator, as the SO, INFORM the Operator that it is set at 2 gpm.

PROMPT:

WHEN the Operator addresses the status of the other recirc loop, as the SS, INFORM the Operator that the other loop is in operation.

12.

Verify RWL is greater than +32 At panel 2H1 1-P603, the inches.

Operator VERIFIES that RWL is greater than +32 inches.

(** Indicates critical step)

2013-301 SIM 1 Page 7 of 9 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 7 13.

Operator completes required portions has been completed of Attachment 5 of procedure.

through step 7.1.

PROMPT:

INFORM the operator that another operator has completed the applicable portions of Attachment 5 and are acceptable, 2 minutes ago.

    • 14.

Confirm/Close Reactor Recirc Pump At panel 2H1 1-P602, PUMP Discharge Valve, 2B31-FO31A.

DISCH VLV 2B31-FO31A is CLOSED, green light ONLY illuminated.

    • 15.

CONFIRM ASD A START At panel 2Hll-P602, CONFIRM pushbutton indicating light is ASD A START pushbutton illuminated, indicating light is illuminated.

PROMPT:

WhEN the Operator addresses the status of the recirc loop startup temperatures, as the RO, INFORM the Operator that the temperatures are still acceptable.

(** Indicates critical step)

The ASD A STARTING light illuminates.

The ASD A START pushbutton light extinguishes.

2B31-FO31A, Recirc Pump A Disch Vlv, starts to JOG OPEN 2 seconds after the ASD A STARTING light illuminates.

The ASD A speed increases to -P370 RPM on 2B31-R660A and 22% on 2B31-R661A in about 4 seconds.

The ASD A RUNNING light illuminates.

The ASD A STARTING indicating light extinguishes.

Recirc A Flow, indicates 11,000 13,000 GPM on 2B31-R617.

2B31-FO31A, Recirc Pump A Disch Vlv, is FULL OPEN <96 seconds after the Recirc ASD A STARTING light illuminates.

At panel 2H1 i-P602, the Operator VERIFIES:

The ASD A STARTING light illuminates.

The ASD A START pushbutton light extinguishes.

2B31-FO31A, Recirc Pump A Disch Vlv, starts to JOG OPEN 2 seconds after the ASD A STARTING light illuminates The ASD A speed increases to

-370 RPM on 2B31-R660A and 22% on 2B31-R661A in about 4 seconds.

The ASD A RUNNING light illuminates.

The ASD A STARTING indicating light extinguishes.

Recirc A Flow, indicates 11,000 13,000 GPM on 2B31-R617.

2B31-FO31A, Recirc Pump A Disch Vlv, is FULL OPEN <96 seconds after the Recirc ASD A STARTING light illuminates.

2013-301 SIM 1 Page 8 of 9 17 I

SAT/UNSAT STEP I PERFORMANCE STEP STANDARD I

(COMMENTS)

  1. 1
    • 16.

DEPRESS the ASD A START At panel 2H1 1-P602, ASD A pushbutton.

START PUSH BUflON, is Confirm the following:

(** Indicates critical step)

2013-301 SIM 1 Page 9 of 9 PROMPT:

PROMPT:

IF addressed by the Operator, INFOR1VI the Operator the Single Loop Operation was never enabled for the APRMs.

IF addressed by the Operator, INFORM the Operator the STA will evaluate core conditions per 345V-SUV-020-0, perform applicable sections of 34SV-SUV-023-2 AND verify Recirc Loop Active/Inactive status on the process computer.

END TIME:

NOTE:

The terminating cue shall be given to the Operator when:

After JPM step #20 is complete.

With NO reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

STEP j PERFORMANCE STEP STANDARD I

(COMMENTS) 18.

Complete remainder of Attachment 5. has been completed through Step 7.4.

PROMPT:

IF addressed by the Operator, INFORM the Operator that the remaining portions of Attachment 5 have been completed.

19.

Confirm that Pump 2A Number 1 Seal At panel 2H1 1-P602, the pressure is within 50 psig of Reactor Operator has VERIFIED that pressure.

Pump 2ANo. 1 Seal pressure on 2B31-R6O3Ais within 50 psig of Reactor pressure.

20.

Confirm that Pump 2A Number 2 Seal At panel 2H1 1-P602, the pressure is within 50 psig of one half Operator VERIFIES that Pump of Reactor pressure.

2ANo. 2 Seal pressure on 2B3 1 -R6O2Ais within 50 psig of one half of Reactor pressure.

(*

  • Indicates critical step)

Southern Nuclear Company Operations Training JPM DRAFT CRISIM 2 ALL Title PERFORM A MANUAL STARTUP OF THE CORE SPRAY SYSTEM WITH 1ST VALVE FAILURE thor:

Media Number:

Time Critical Anthony Ball 2013-301 SIM 2 8.0 Minutes Reviewed By:

Date:

Reviewed by Instructional Technologist or designee Date Approved By:

Date:

SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 SIM 2 Rev. No.

Date

[

Reason for Revisions Authors Sups Initials Initials 00 This JPM was created from LR-JP-08.02 for ILT-8 NRC Exam. Modified JPM with failure of the 1st ARB CS valve attempted to open. After this exam will be changed to a new LR JPM number.

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev No List of Contributors

2013-301S1M2 Page 1 of 7 UNIT1

(

)

UNIT 2 (X)

TASK TITLE:

PERFORM A MANUAL STARTUP OF THE CORE SPRAY SYSTEM WITH 1ST VALVE FAILURE JPM NUMBER:

2013-301 SIM 2 TASK STANDARD:

The task shall be completed when the operator has started the second ioop of the Core Spray System manually and the system is aligned for injection to the Reactor with loop flow greater than 950 gpm per 34S0-E21-001-2.

TASK NUMBER:

008.002 OBJECTIVE NUMBER:

008.002.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.80 SRO 3.42 K/A CATALOG NUMBER: 209001A405 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.80 SRO 3.60 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34S0-E21-001-2 (current version) 3 1EO-EOP-010-2 (current version)

REQUIRED MATERIALS Umt 2 34S0-E21-001-2 (current version)

APPROXIMATE COMPLETION TIME:

8.0 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP 2013-301 S1M 2 Page 2 of 7 Simulator Initial Conditions:

1.

RESET the Simulator to 75% RTP OR SNAP 612 and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

MALF #

TITLE FINAL RAMP ACT.

VALUE RATE TIME mfB2l_123A Steam Line Break in the Drywell 00000 mfE2l_202A Core Spray LOCA Signal Failure 00000 mfEl l_202B RHR LOCA Signal Failure 00000 mfN2L79A Condensate Pump A Trip 00000 mfN2l_79B Condensate Pump B Trip 00000 mfN2L79C Condensate Pump C Trip 00000 mfE4l_104 HPCI Turbine Trip 00000 mfE5 1_i 10 RCIC Turbine Trip 00000 ACTiVATE THE FOLLOWING EVENT TRIGGERS:

Trigger #

DESCRIPTION CONDITIONS Expert Command E21-7 2E2l-FOO5B fails close, FOO5A works E21-8 2E21-FOO5A fails close, FOO5B works ORS OVERRIDES:

Activator TAG #

S/MIL DESCRIPTION Final Ramp Delay Value Rate ST-O diE2l-FOO5A S

Core Spray A Inboard Disch Valve Close ST-O diE2l-FOO5B S

Core Spray B Inboard Disch Valve Close 3.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Allow to run until Reactor pressure is approximately 150 psig.

B.

Acknowledge annunciators.

4.

PLACE the Simulator in FREEZE until the crew assumes the shift.

5.

ESTIMATED Simulator SETUP TIME:

10 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 has had a LOCA. RWL is less than -101 inches and Reactor pressure is less than 350 psig.

2.

Core Spray Logic has failed.

3.

31E0-EOP-0l0-2 (RC) is in progress.

INITIATING CUES:

Start Core Spray And Inject To The Reactor.

This JPM Is Time Critical.

2013-301 SIM 2 Page 4 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN I

Human performance tools, safety, PPE met (1), AND L1 Mark the JPM as a PASS L

For initial trg all steps completed correctly OR PASS For continuing trg, critical steps (if used) completed correctly I

Mark the JPM as a FAIL FAIL IJ Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: If the operator starts first with the A Loop of Core Spray perform Steps 1 10.

If the operator starts first with the B Loop of Core Spray perform Steps 1120.

1.

Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as 34SO-E21-001-2.

2.

Start Core Spray Pump 2A.

At panel 2H1 1-P601, CORE SPRAY PUMP, 2E21-COO1A, is RUNNING, red light illuminated.

3.

Confirm Core Spray Pump discharge At panel 2H1 1-P601, operator pressure is greater than 265 psig.

VERIFIES DISCH PRESS is greater than 265 psig on indicator 2E2 1 -R600A.

4.

Recognizes the Core Spray Pump At panel 2H1 1-P601, INBD 2A Discharge Valve, 2E21-FOO5A DISCH VLV, 2E21-FOO5A, is will NOT OPEN when Reactor CLOSE, green light ONLY pressure is less than 425 psig.

illuminated.

(*

  • Indicates critical step)

2013-301 SIM 2 Page 5 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

I NOTE: The operator may inform the Shift Supervisor of the valve failure at this time or may continue with placing the other loop of Core Spray in service and then notify the Shift Supervisor. (EITHER is acceptable) 5.

Start Core Spray Pump 2B.

At panel 2H1 1-P601, CORE SPRAY PUMP, 2E21-COO1B, is RUNNING, red light illuminated.

PROMPT:

WHEN the operator addresses discharge pressure, INDICATE for the operator that pump discharge pressure is greater than 265 psig.

6.

Confirm Core Spray Pump discharge At panel 2H1 1-P601, operator pressure is greater than 265 psig.

VERIFIES DISCH PRESS is greater than 265 psig on indicator 2E2 1 -R600B.

7 Open the Core Spray Pump 2B At panel 2H1 1-P601, INBD Discharge Valve, 2E21-FOO5B when DISCH VLV, 2E21-FOO5B, is Reactor pressure is less than 425 psig.

OPEN, red light illuminated.

NOTE: If adequate core cooling exists, it is acceptable for the FOO5B valve to be left in mid position to prevent exceeding rated pump flow.

NOTE: Valve, 2E21-FO31B, auto closes when flow exceeds 950 gpm.

8.

Verify the Minimum Flow Valve, At panel 2H1 1-P601, the operator 2E21-FO31B closes when flow is VERIFIES when DISCH FLOW,

>950 gpm.

2E2l-R601 is greater than 950 gpm, MIN FLOW VLV, 2E2 1 -F03 1 B is CLOSED, green light ONLY illuminated.

9.

Throttles 2E2 1 -FOO5B as necessary At panel 2H 11 -P601, the operator throttles 2E21-FOO5B to maintain RWL +3 to +50 inches.

10.

Confirms a Core Spray and RHR At panel 2H1 1-P654, the operator room cooler automatically starts.

has confirmed that a CORE SPRAY and RHR ROOM COOLER have started, red light illuminated.

PROMPT:

IF the operator addresses RWL, as the Shift Supervisor, INFORM the operator to maintain RWL between +3 to +50 inches.

(*

  • Indicates critical step)

2013-301 SIM 2 Page 6 of 7 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 PROMPT:

IF the operator addresses shutting down the Core Spray System, as the Shift Supervisor, INFORM the operator that this is NOT desired at this time.

11.

Operator identifies the procedure Operator has identified the correct needed to perform the task.

procedure as 34S0-E21-001-2.

12.

Starts Core Spray Pump 2B.

At panel 2H1 1-P601, CORE SPRAY PUMP, 2E21-COO1B, is RUNNING, red light illuminated.

13.

Confirm Core Spray Pump discharge At panel 2H1 l-P601, operator pressure is greater than 265 psig.

VERIFIES DISCH PRESS is greater than 265 psig on indicator 2E2 1 -R600B.

14.

Recognizes the Core Spray Pump At panel 2H1 1-P601, INBD 2B Discharge Valve, 2E21-FOO5B DISCH VLV, 2E21-FOO5B, is will NOT OPEN when Reactor CLOSE, green light ONLY pressure is less than 425 psig.

illuminated.

NOTE: The operator may inform the Shift Supervisor of the valve failure at this time or may continue with placing the other ioop of Core Spray in service and then notify the Shift Supervisor. (EITHER is acceptable)

    • 15.

Starts Core Spray Pump 2A.

At panel 2H1 1-P601, CORE SPRAY PUMP, 2E21-COO1A, is RUNNING, red light illuminated PROMPT:

WHEN the operator addresses discharge pressure, INDICATE for the operator that pump discharge pressure is greater than 265 psig.

16.

Confirm Core Spray Pump discharge At panel 2H1 1-P601, operator pressure is greater than 265 psig.

VERIFIES DISCH PRESS is greater than 265 psig on indicator 2E2 1 -R600A.

    • 17.

Opens the Core Spray Pump 2A At panel 2H1 1-P601, INBD Discharge Valve, 2E21-FOO5A when DISCH VLV, 2E21-FOO5A, is Reactor pressure is less than 425 psig.

OPEN, red light illuminated.

NOTE: If adequate core cooling exists, it is acceptable for the FOO5A valve to be left in mid position to prevent exceeding rated pump flow.

(*

  • Indicates critical step)

2013-301 SIM 2 Page 7 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 NOTE: Valve, 2E21-FO31A, auto closes when flow exceeds 950 gpm.

18.

Verify the Minimum Flow Valve, At panel 2H1 1-P601, the operator 2E21-FO31A closes when flow is VERWIES when DISCH FLOW,

>950 gpm.

2E21-R601 is greater than 950 gpm, MIN FLOW VLV, 2E21-FO31A is CLOSED, green light ONLY illuminated.

19.

Throttles 2E21-FOO5A as necessary At panel 2H1 1-P601, the operator throttles 2E21-FOO5A to maintain RWL +3 to +50 inches.

20.

Confirms Core Spray and RHR room At panel 2H1 1-P657, the operator cooler automatically starts, has confirmed that a CORE SPRAY and RHR ROOM COOLER have started, red light illuminated.

PROMPT:

IF the operator addresses RWL, as the Shift Supervisor, INFORM the operator to maintain RWL between +3 to +50 inches.

PROMPT:

IF the operator addresses shutting down the Core Spray System, as the Shift Supervisor, INFORM the operator that this is not desired at this time.

END TIME:

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes through step 10 or through step 20.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

Operator is controlling RWL and slowly bringing RWL to

+3 to +50 inches.

TERMINATING CUE:

We will stop here.

(** Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT CRISIM 3 RO & SRO4 SOUTHERN COMPANY TITLE EMERGENCY DEPRESS THE REACTOR USING THE HEAD VENTS/DRYWELL COOLERS Error! Reference source not found.

AUTHOR MEDIA NUMBER 2013-301 SIM 3 N/R 10 Minutes RECOMMENDED BY APPROVED BY DATE

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2013-301 SIM 3 RAB DHG 01 03/05/99 Revised due to new simulator computer.

SCB DHG 02 03/13/00 Format modification, change time allowance based on running, modify title RAB 03 11/06/00 Include objective number 04 03/19/02 Include initial operator statement RAB 05 06/21/05 Revised Initial License statement for successful RAB RAB completion 06 05/08/06 Remove Response Cues RAB RAB 07 10/09/09 Revised for use on 2009-302 Exam FNF CME 08 Revised to match procedure and retitled for JLT-8 ARB NRC Exam. Once exam is complete will retitle back to LR-JP-20198.

00 08/05/96 Initial development Rev. No.

Date Reason for Revision

[

Authors Supvs Imtials Initials DHG RAB DHG RAB

2013-301 S1M 3 Page 1 of 7 UNIT 1

(

)

UNIT 2 (X)

TASK TITLE:

EMERGENCY DEPRESS THE REACTOR USING THE HEAD VENTS/DRYWELL COOLERS JPM NUMBER:

2013-301 SIM 3 TASK STANDARD:

The task shall be complete when the operator has initiated the emergency depress process with the Head Vents/Drywell Coolers, per 31E0-EOP-108-2.

TASK NUMBER:

201.098 OBJECTIVE NUMBER:

201.098.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.57 SRO 3.66 K/A CATALOG NUMBER: 295025A1.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 2.9 SRO 3.0 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 3 1EO-EOP-108-2 34S0-T47-00 1-2 34S0-T48-002-2 REQUIRED MATERIALS:

Unit 2 3 1EO-EOP-108-2 34S0-T47-001-2 34S0-T48-002-2 APPROXIMATE COMPLETION TIME:

10 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP 2013-301 SIM 3 Page 2 of 7 Simulator Initial Conditions:

1.

RESET the Simulator to SNAP 613 OR IC #113 and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

MALF #

TITLE FINAL DELAY ACT.

VALUE TIME TIME mfB2ll 29B Main Steam Relief Valve B Fails Stuck 00000 mfB2l_129C Main Steam Relief Valve C Fails Stuck 00000 mfB2ll29D Main Steam Relief Valve D Fails Stuck 00000 mfB2l_129E Main Steam Relief Valve E Fails Stuck 00000 mfB2ll29F Main Steam Relief Valve F Fails Stuck 00000 mfB2l_l29G Main Steam Relief Valve G Fails Stuck 00000 mfB2l_129H Main Steam Relief Valve H Fails Stuck 00000 mfB2l_129K Main Steam Relief Valve K Fails Stuck 00000 mfB2l_129L Main Steam Relief Valve L Fails Stuck 00000 mfB2ll29M Main Steam Relief Valve M Fails Stuck 00000 3.

INSERT the following OVERRIDES (SVO) & (10):

SVO #

DESCRIPTION FINAL RAMP ACT.

VALUE RATE TIME svoT48 140 Water Level in Torus 115 100 00000 diB2l-FO13A Auto Relief SRV A AUTO 4.

INSERT the following REMOTE FUNCTIONS:

REM #

DESCRIPTION STATUS rfP64_330 Drywell Chillers BOO6A & B LOCA/LOSP Trip Links BYPASS rfP64_33 1 Drywell Chillers BOO6B LOCA/LOSP Trip Links BYPASS

2013-301 SIM 3 Page 3 of 7 5.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

On 2H1 1-P700 place the key switch for the Drywell Chillers to Override B.

On 2H1 1-P654 and P657, place keyswitchs for Drywell Fans to Override C.

Perform RC-1, RC-2, and TC-1 and RWL to the normal band.

D.

Reset the Group 2 isolation.

E.

Prevent a further Group 2 by starting RCIC to maintain level >3 (SRV A will be cycling)

F.

Close the MSIVs G.

Place ALL SRV switches to OPEN H.

Place HPCI in service in Auto, injecting at 750 gpm.

I.

Acknowledge annunciators.

6.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

7.

ESTIMATED Simulator SETUP TIME:

20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

A seismic event has caused a small steam leak in the drywell and an unisolable leak in the Torus.

2.

Attempts to raise Torus water level have been unsuccessful.

3.

31E0-EOP-012-2 (PC-i) is in progress.

4.

The Reactor has been shutdown 5.

The Shift Supervisor has determined that the plant cannot be maintained in the SAFE Region of the Heat Capacity Temperature Limit and decided to Emergency Depress the Reactor.

6.

31E0-EOP-015-2 (CP-i) is in progress.

7.

An attempt was made to Emergency Depress with the SRVs, but they have failed to open.

8.

Other methods of Alternate Emergency Depress have been unsuccessful.

9.

Drywell Chillers and Fans have been placed in service per 34SO-P64-OOi-2 with the LOCA trips overridden.

10.

The Group 2 isolation has been reset.

11.

Standby Gas Treatment System is running with suction from the Reactor Building & Refueling Floor per 3450-T46-OOi-2.

INITIATING CUES:

Depressurize the Reactor using the Head Vents/Drywell Coolers per 31 EO-EOP-108-2.

2013-301 SIM 3 Page 5 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

1.

Obtain the procedure needed to Operator obtains 31EO-EOP-108-2.

SAT! UNSAT perform the task.

2.

Place all available DW Chillers and Recognizes that all DW Chillers SAT / UNSAT Fans in service and Fans in service from initial conditions or by observing red lights illuminated on 2Hl 1-P654 and 2H1 l-P657.

3.

Obtain the procedure needed to Operator obtains 34S0-T48-002-2 SAT! UNSAT perform the task.

or placard to vent the drywell.

NOTE: Only one loop is critical and needs to be vented. Steps 4-6 are for the A side and steps 7-9 are for the B side.

  • 4 OPEN 2T48-F334A, Drywell Vent At 2H1 l-P657, the operator places SAT! UNSAT ! NA Isol Vlv.

the control switch for 2T48-F334A, Drywell Vent Isol Vlv to OPEN.

5.

OPEN 2T48-F335A. Drywell Vent At 2H1 1-P657, the operator places SAT! UNSAT / NA Isol Vlv.

the control switch for 2T48-F335A, Drywell Vent Isol Vlv to OPEN.

  • Indicates critical step)

2013-301 SIM 3 Page 6 of 7 At 2H 11 -P654, the operator places the control switch for 2T48-F334B, Drywell Vent Isol Vlv to OPEN.

At 2H1 1-P654, the operator places the control switch for 2T48-F335B, Drywell Vent Isol Vlv to OPEN.

At 2H1 1-P654, the operator increases the controller output on 2T48-R615B, Drywell Flow Controller for F336B with demand greater than zero.

10.

At 2H1 1-P602, Place the following At 2141 1-P602, DRYWELL SUMP pump control switches to PULL TO CONTROLS, the operator places LOCK:

the following pump control switches are in PULL TO LOCK:

o D/W Equipment Drain pump D/W Equipment Drain pump SAT / UNSAT 2G1 1-COO6A 2G1 1-COO6A D/W Equipment Drain Pump D/W Equipment Drain Pump SAT / UNSAT 2G1 1-COO6B 2G1 1-COO6B e

D/W Floor Drain Pump D/W Floor Drain Pump SAT / UNSAT 2G11-COO1A 2Gll-COO1A D/W Floor Drain Pump D/W Floor Drain Pump SAT I UNSAT 2G11-COOIB 2G11-COO1B I

SAT/UNSAT I STEP I

I PERFORMANCE STEP STANDARD I

(COMMENTS)

OPEN 2T48-F336A, Drywell Vent Flow Cntl Vlv.

    • 7 At 2H1 l-P657, the operator increases the controller output on 2T48-R615A, Drywell Flow Controller for F336A with demand greater than zero.

SAT/UNSAT/NA OPEN 2T48-F334B, Drywell Vent Isol Vlv.

    • 9 SAT/UNSAT/NA OPEN 2T48-F336B, Drywell Vent Flow Cntl Vlv.

SAT/UNSAT/NA SAT/UNSAT/NA

(** Indicates critical step)

2Ol33Ol SIM 3 Page 7 of 7 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

    • 11.

At 2H1 l-P602, OPEN Reactor Head At 2H1 l-P602, RX HEAD SAT! UNSAT Vent valve, 2B21-F004.

VENTS, VENT VLV, 2B21-F004 is OPEN, red light ONLY illuminated.

    • 12.

At 2H1 l-P602, OPEN Reactor Head At 2H1 l-P602, RX HEAD SAT! UNSAT Vent valve, 2B21-F003.

VENTS, VENT VLV, 2B21-F003 is OPEN, red light ONLY illuminated.

PROMPT:

IF system restoration is addressed by the operator, as the Shift Supervisor, INFORM the operator that system restoration is not desired at this time.

NOTE:

The terminating cue shall be given to the operator when:

END TIME:________

When the operator completes step 12.

With NO reasonable progress, the operator exceeds double the allotted time.

TERMINATING CUE:

We will stop here.

(*

  • Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT CR/SIM 4 RO & SROI SOUTHERN COMPANY TITLE PERFORM A MANUAL INITIATION OF LPCI (IF IN SHUTDOWN COOLING

- Alt. Path)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 SIM 4 15 Minutes RECOMMENDED BY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2013-301 SIM 4 Rev. No.

Date Reason for Revision Authors Supvs Initials Initials 01 Renumbered to 2013-301 Sim 4 for ILT-8 NRC ARB Exam and modified for Alternate paths. This 1PM will be renumbered after NRC Exam.

2013-301 SIM 4 Page 1 of 8 UNIT1

()

UNIT2 (X)

TASK TITLE:

PERFORM A MANUAL INITIATION OF LPCI (IF IN SHUTDOWN COOLING - Alt. Path)

JPM NUMBER:

2013-301 SIM4 TASK STANDARD:

The task shall be completed when the RHR loop previously in the shutdown cooling mode is aligned for LPCI, with both pumps running and injecting to the Reactor at approximately 17,000 gpm, as indicated on 2E1 1-R603A, per 34S0-E1 1-010.

TASK NUMBER:

006.008 OBJECTIVE NUMBER:

006.008.O PLANT HATCH JTA IMPORTANCE RATING:

RO 4.33 SRO 3.76 K/A CATALOG NUMBER:

203000A405 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.30 SRO 4.10 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)/Senior Reactor Operator (SRO)

GENERAL

REFERENCES:

Unit 2 34S0-E1 1-010-2 (current version)

REQUIRED MATERIALS:

Unit 2 34S0-E1 1-010-2 (current version)

APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP 2013-301 SIM 4 Page 2 of 8 Simulator Initial Conditions:

1.

RESET the Simulator to SNAP 614 OR IC #102 and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

MALF #

TITLE FINAL RAMP ACT.

VALUE RATE TIME mfG3 1_242 RWCU Non-Isol Leak 5

100 99999 mfEl 1_i 15B RHR Pump B Trip 00000 mfEl 1_i 15D RHR Pump D Trip 00000 mfE2l_202A Core Spray LOCA Signal Failure 00000 3.

INSERT the following ORS OVERRIDES:

TAG #

P/L DESCRIPTION STATUS diE2l-COOIA P

Core Spray Pmp 1A STOP 00000 diE2l-COO1B P

Core Spray Pmp B STOP 00000 diEl 1-FOO7A P

Mm Flow Bypass Valve CLOSE 00000 diEl 1-F028A P

RHR A Torus Spray/Test Vlv CLOSE 00000 diEl 1-FO16A P

Contmt Spray Outboard Drywell CLOSE 00000 loEl 1-FOO7AG1 L

Mm Flow Bypass Valve OFF 00000 loEl 1-FOO7AR2 L

Mm Flow Bypass Valve OFF 00000 loEl 1-FO28AG1 L

RHR A Torus Spray/Test Vlv OFF 00000 loEl 1-F028AR2 L

RHR A Torus Spray/Test Vlv OFF 00000 loEl 1-FO16AG1 L

Contmt Spray Outboard Drywell OFF 00000 loEl 1-FO16AR2 L

Contmt Spray Outboard Drywell OFF 00000 4.

INSERT the following REMOTE FUNCTIONS:

REM #

DESCRIPTION STATUS rfEl 1_22 2E1 1-FO15AJB Override Jumper And Links Override

(** Indicates critical step)

2013-301 SIM 4 Page 3 of 8 5.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Place RHR Loop A into Shutdown Cooling.

B.

Activate malfunction mfG3 1_242 and allow to run until LOCA Signal is received.

C.

Allow Sim to run until 2E1 1-F048A LOCA timer times out, then place 2E11-F048A control switch to close to close valve. Once closed reposition switch to mid position.

D.

MODIFY mfG3 1_242 to Final 1 to limit the RWL reduction.

E.

Acknowledge annunciators.

6.

PLACE the Simulator in FREEZE until the crew assumes the shift.

7.

PLACE DANGER TAGS on the following equipment:

MPL #

COMPONENT TAGGED POSITION 2E1 1-FOO7A Mm Flow Bypass Valve CLOSED 2E1 1-F028A Torus Spray Or Test Vlv CLOSED 2E1 1-FO16A Cmt Spray Outboard Vlv CLOSED 8.

ESTIMATED Simulator SETUP TIME:

20 Minutes

(** Indicates critical step)

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is shutdown.

2.

RHR loop 2A was in the Shutdown Cooling mode with RHR Pump 2A in service.

3.

Both Core Spray System Pumps are inoperable.

4.

HPCI and RCIC are isolated on low steam supply pressure.

5.

A LOCA has occurred and 31EO-EOP-O1O2 (RC) is in progress.

6.

RHR Pumps 2B and 2D are inoperable.

INITIATING CUES:

Place RHR Loop A in the LPCI Mode and inject to the Reactor.

2013-301 SIM 4 Page 5 of 8 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

I For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly FAIL U

Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

1.

Operator identifies the procedure Operator has identified the correct needed to perform the task.

procedure as 34S0-E1 1-010-2.

2.

Confirm RHRSW pumps are tripped.

At panel 2H1 1-P601, SERVICE WATER PUMPS, 2E1 1-COO1A/B/CID are TRIPPED, green lights illuminated.

NOTE: IF the RHR Pumps AUTO trip, with an Auto Initiation Signal present, the pumps Anti-Pumping Logic, will result in NO light indication for the pumps.

3.

Confirm RHR pumps are tripped.

At panel 2H11-P6O1, the following pumps are TRIPPED, neither green nor red lights are illuminated: RHR PUMPS, 2E1 l-COO2AJC 4.

Confirm/close Shutdown Cooling At panel 2H1 1-P601, SDC Suction Valve, 2E1 1-FOO8.

SUCTION VLV, 2El l-FOO8, is CLOSED, green light ONLY illuminated.

(** Indicates critical step)

2013-301 SIM 4 Page 6 of 8 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) J 5.

Confirm/close Shutdown Cooling At panel 2H1 1-P602, SDC Suction Valve, 2E1 1-F009.

SUCTION VLV, 2E1 1-F009, is CLOSED, green light ONLY illuminated.

    • 6.

Close Shutdown Cooling Suction At panel 2H1 1-P601, the Valve, 2E1 1-FOO6A.

following valve is CLOSED, green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 1-FOO6A

following valve is CLOSED, green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 1-FOO6C 8.

Confirm/open Torus Suction Valve, At panel 2H1 1-P601, TORUS 2E1 1-F065A.

SUCTION VLV, 2E1 1-F065A, is OPEN, red light ONLY illuminated.

9.

Confirm/open Torus Suction Valve, At panel 2H1 1-P601, TORUS 2E1 1-F065C.

SUCTION VLV, 2E1 1-F065C, is OPEN, red light ONLY illuminated.

NOTE: Valve in Step 6 must be closed, green light ONLY, before valve in Step 10 will open.

Valve in Step 7 must be closed, green light ONLY, before valve in Step 11 will open.

    • 1O.

Open Torus Suction Valve, At panel 2H1 1-P601, the 2E1 1-FOO4A.

following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E1 1-FOO4A

    • 11.

Open Torus Suction Valve, At panel 2H1 l-P601, the 2E1 1-FOO4C.

following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E11-FOO4C

(** Indicates critical step)

20 13-301 SIM 4 Page 7 of 8 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

NOTE: The control switch for each pump must be taken to STOP before the RHR pump will start on the ioop that was in Shutdown Cooling.

    • 12.

Start RHR Pump 2A by placing the At panel 2H1 1-P601, control control switch to STOP, then to switch for the following pump START.

has been taken to STOP and then to START, red light illuminated:

RHR PUMP, 2E1 1-COO2A

  • 93*

Start RHR Pumps 2C by placing the At panel 2H1 1-P601, control control switch to STOP, then to switch for the following pump START.

has been taken to STOP and then to START, red light illuminated:

RHR PUMP, 2E1 1-COO2C NOTE: At least one RHR pump must be started to satisfy the critical step in step 12 or step 13.

NOTE:

2E1 1-FO15A has failed to AUTO open. The operator will be required to MANUALLY open 2E1 1-F015A

)en 2E1 1-FO15A.

At panel 2H1 1-P601, RHR JNBD INJ VLV, 2E1 1-FO15A, is OPEN, red light ONLY illuminated.

NOTE:

2E1 1-FO15A will close on a Group II Signal level signal if 2E1 1-F008 and 2E1 1-F009 are open and Reactor pressure is less than 138 psig.

NOTE:

2E1 1-F048A has failed to AUTO open. The operator will be required to MANUALLY open 2E1 1-F048A

    • 15.

Open Heat Exchanger Bypass Valve, At panel 2Hl 1-P601, HX 2E11-F048A.

BYPASS VLV, 2E11-F048A, is OPEN, red light illuminated.

(** Indicates critical step)

2013-301 SIM 4 Page 8 of 8 1

STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 16.

Throttle the RHR Outboard Injection At panel 2H1 1-P601, the Vlv, 2E1 1-FO17A, to obtain 17,000 following has been performed:

gpm.

RHR OUTBD INJ VLV, 2E1 1-FO17A, has been THROTTLED, red and green lights illuminated.

Operator has OBTAINED approximately 17,000 gpm as indicated on RHR FLOW, 2E1 1-R603A (accept +/-2,000 gpm).

NOTE: If a LOCA signal is present, the 2E1 1-FO17A is interlocked open and the operator will be unable to throttle flow for five minutes. Due to the stroke times of the 2E1 1-FOO6A & 6C along with the 2E1 1-FOO4A & 4C, the interlock for 2E1 1-FO17A will be timed out.

PROMPT:

IF the operator addresses additional steps in the procedure, INFORM the operator that another operator will complete the remainder of the procedure.

PROMPT:

IF the operator addresses shutting down LPCI, as the Shift Supervisor, INFORM the operator that shutdown of RHR is not required at this time.

END TIME:________

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 16.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

(** Indicates critical step)

Southern Nuclear Company Operations Training JPM DRAFT CRISIM 5 ALL Title VERIFY AN AUTOMATIC ISOLATION OF PCIS GROUP II thor:

Media Number:

Time Error! Reference source not found.

20 13-301 SIM 5 15 Minutes Reviewed By:

Date Reviewed by Instructional Technologist or designee Date Approved By Date SOUTHERN

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 SIM 5 Rev. No.

Date

[

Reason for Revisions

[Authors Sups Initials Initials 00 06/28/95 Initial development RAB SMC 01 06/17/96 Format change, modify time allowance RAB RSG 02 10/07/97 eied on annual exam comments & changed valves SCB DHG 03 10/23/97 Fixed some typographical errors.

SCB DHG 04 03/02/99 Revised due to new simulator computer.

SCB DHG 05 02/04/00 Format modification, correct simulator setup RAB DHG 06 11/02/00 Include objective number RAB DHG 07 12/27/01 Added valve not referenced in JPM DNM DHG 08 03/07/02 Include initial operator statement RAB RAB Update procedure numbers, operator applicability and 09 03/08/05 Simulator IC number TFP R

10 06/02/05 Revised Initial License statement for successful completion RAB RAB 11 04/07/06 Remove Response Cues RAB RAB 1 1.1 10/17/11 Reviewed JPM against current procedure. Added pass / fail MMG ALS criteria. Added CLOSED to 2G11-F020, 2D11-F071, 2P33-F605, 2D1 1-F072 descriptions. Deleted CLOSED from all valves that failed to close. Added These valves can also be checked using the Isolation Valve Display on 2H11-P601 to the prompt dealing with verifying 2E1 1-FO79AJB and 2E1 1-FO8OAJB on panels 2H21-P018 and 2H21-P021.

11.2 Revised to match procedure and retitled for ILT-8 ARB NRC Exam. Once exam is complete will retitle back to LR-JP-13.46.

Line Contributors e following individuals contributed to the development of this lesson plan.

Rev. No.

List of Contributors 11.1 MMG

2013-301 SIM 5 Page 1 of 13 UNIT1

(

)

UNIT2 (X)

TASK TITLE:

VERIFY AN AUTOMATIC ISOLATION OF PCIS GROUP II JPM NUMBER:

2013-301 SIM 5 TASK STANDARD:

TASK NUMBER:

The task shall be completed when the operator has verified Group II isolation per 34AB-C71-001-2 and isolated those valves that have failed to close.

013.046 OBJECTIVE NUMBER 013 046 A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.57 SRO Not Available K/A CATALOG NUMBER: 223002A302 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.50 SRO 3.50 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34AB-C7 1-001-2 REQUIRED MATERIALS Umt 2 34AB-C71-001-2 (current version)

APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON ThE FOLLOWING PAGE

SIMULATOR SETUP 2013-301 SIM 5 Page 2 of 13 Simulator Initial Conditions:

1.

RESET the Simulator to 100% RTP and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

MALF #

TITLE FINAL RAMP ACT.

VALUE RATE TIME mf70014376 Ann Fail

- PCIS INBOARD H202/FPM SYS 00000 OVERRIDE mt70024414 Ann Fail

- PCIS OUTBOARD H202/FPM 00000 SYS OVERRIDE 3.

INSERT the following REMOTE FUNCTIONS:

REM #

DESCRIPTION STATUS rtP33237 H2 02 Analyzer A OFF rfP33238 H2 02 Analyzer B OFF 4.

INSERT the following ORS OVERRIDES:

TAG #

P/E DESCRIPTION STATUS diP33-S 16 P

H2O2 Analyzer Isol LOCA Override BYPASS 00000 diP33-S17 P

H202 Analyzer Isol LOCA Override BYPASS 00000 5.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Perform RC-1, RC-2, and TC-1. Ensure that RWL drops below +3 inches before recovering.

B.

Restore RWL to the normal level band and stabilize the plant.

6.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

7.

ESTIMATED Simulator SETUP TIME:

20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

The Reactor has scrammed.

2.

RWL dropped to approximately -10 inches before the operators restored it to the normal level band.

INITIATING CUES:

Verify Group II isolations.

2013-301 S1M 5 Page 4 of 13 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly LI Mark the JPM as a FAIL FAIL LI Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1.

Operator obtains the procedure needed Operator has obtained procedure to perform the task.

34AB-C71-001-2.

NOTE: It is the intent of the JPM that the operator verifies Group II isolations and determines which valves have failed to isolate. The action to close the unisolated valves is necessary to complete the critical portion of the step.

Steps 2 through 13 may be performed in any order.

NOTE: In the following steps, the parts of the Standard marked with are the critical portions of that step.

(** Indicates critical step)

IS T

  1. EJ 2.

3.

PERFORMANCE STEP Operator confirms or performs the following automatic actions:

2G1 1-F003, CLOSED, 2G1 1-F019, CLOSED, 2E1 1-F040, CLOSED, 2T48-F1 1 8B, CLOSED, 2T48-F309, CLOSED, 2T48-F307, CLOSED.

Operator confirms the following automatic actions:

2T48-F341, CLOSED, 2T48-F339, CLOSED, 2T48-F1 1 8A, CLOSED, 2T48-F3 18, CLOSED, 2T48-F3 19, CLOSED.

STANDARD At panel 2H1 1-P602, the operator has CONFIRMED OR PERFORMED the following:

2G1 1-F003, FLOOR DRAIN VLV, CLOSED, green light illuminated.

2G1 1-F019, EQUIP DRAIN VLV, green light illuminated.

2E1 1-F040, RHR TO RADWASTE VLV, CLOSED, green light illuminated.

2T48-F118B, N2 MAKEUP TO TORUS VLV, CLOSED, green light illuminated.

2T48-F309, TORUS AIR PURGE VLV, CLOSED, green light illuminated.

2T48-F307, DRWL AIR PURGE VLV, CLOSED, green light illuminated.

At panel 2H1 1-P602, the operator has CONFIRMED the following:

2T48-F341, DRWL VENT &

RELIEF VLV, CLOSED, green light illuminated.

2T48-F339, TORUS VENT &

RELIEF VLV, CLOSED, green light illuminated.

2T48-F1 18A, N2 MAKEUP TO DRWL VLV, CLOSED, green light illuminated.

2T48-F318, TORUS VENT VLV, CLOSED, green light illuminated.

2T48-F319, DRWL VENT VLV, CLOSED, green light illuminated.

2013-301 SIM 5 Page 5 of 13 SAT/UNSAT (COMMENTS

(** Indicates critical step)

2013-301 SIM 5 Page 6 of 13 SAT/UNSAT I STEP I

PERFORMANCE STEP STANDARD I

(COMMENTS)

  1. 1 4.

Operator confirms or performs the At panel 2H 11-P601, the operator following automatic actions:

has CONFIRMED OR 2G1 1-F004, CLOSED, PERFORMED the following:

2G1 1-F020, CLOSED, 2G1 1-F004, FLOOR DRAJN 2E1 1-F049, CLOSED, VLV, CLOSED, green light illuminated.

2T48-F324, CLOSED.

2G11-F020, EQUIP DRAIN VLV, CLOSED green light illuminated.

2E1 1-F049, RHR TO RADWASTh VLV, CLOSED, green light illuminated.

2T48-F324, TORUS AIR PURGE VLV, CLOSED, green light illuminated.

(** Indicates critical step)

2013-301 SIM 5 Page 7 of 13 I STEP PERFORMANCE STEP STANDARD I

(COMIENTS) 1 5.

Operator confirms the following At panel 2H1 1-P601, the operator automatic actions:

has CONFIRMED the following:

2T48-F308, CLOSED, 2T48-F308, DRYWELL AIR 2T48-F340, CLOSED, PURGE VLV, CLOSED, green 2T48-F338, CLOSED, light illuminated.

2T48-F104, CLOSED, 2T48-F340, DRWL VENT &

RELIEF VLV, CLOSED, green 2T48F103, CLOSED, light illuminated.

2T48-F326, CLOSED, 2T48-F338, TORUS VENT &

2T48-F320, CLOSED, RELIEF VLV, CLOSED, green 2E1 1-F122B, CLOSED, light illuminated.

2E1 l-F122A, CLOSED.

2T48-F104, NITROGEN MAKEUP VLV, CLOSED, green light illuminated.

2T48-F103, NITROGEN PURGE VLV, CLOSED, green light illuminated.

2T48-F326, TORUS VENT VLV, CLOSED, green light illuminated.

2T48-F320, DRYWELL VENT VLV, CLOSED, green light illuminated.

2E1 1-F122B, TESTABLE CHECK FO5OB BYPASS VLV, CLOSED, green light illuminated.

2E1 l-F122A, TESTABLE CHECK FO5OA BYPASS VLV, CLOSED, green light illuminated.

PROMPT:

IF 2E1 1-FO15A & B are checked, INFORM the operator that the GREEN light is illuminated.

(*

  • Indicates critical step)

2013-301S1M5 Page 8 of 13 SATIUNSAT I STEP I

PERFORMANCE STEP STANDARD I

(COMMENTS)

  1. 1 Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions:

has CONFIRMED the following:

2D 11-F05 1, CLOSED, 2D 11 -F05 1, PRI CNMT FIS PROD MON INBD ISOL, 2D1 1F050, CLOSED, CLOSED, green light 2E41-F122, CLOSED, illuminated.

2B21-F111, CLOSED, 2D11-F050, PRI CNMT FIS 2P70-F002, CLOSED, PROD MON INBD ISOL, CLOSED, green light

    • 2p33..F002, CLOSED, illuminated.
    • 2p33.F004, CLOSED, COOL/CNMT ATMOS SMPLG
    • 2P33.F003, CLOSED, INBD ISOL, CLOSED, green
    • 2p33.F005, CLOSED.

light illuminated.

2B21-F1 11, POST ACC RX COOLICNMT ATMOS SMPLG INBD ISOL, CLOSED, green light illuminated.

2P70-F002, DRWL PNEU INBD SUCTION ISOL, CLOSED, green light illuminated.

    • 2p33..F002, PRI CNMT ATMOS H2O2 ANLY INBD ISOL CH B, switch taken to CLOSE,green light illuminated.
    • 2p33F007, PRI CNMT ATMOS H202 ANLY INBD ISOL CH A switch to CLOSE, green light illuminated.
    • 2P33..F004, PRI CNMT ATMOS H2O2 ANLY A RTN LINE INBD ISOL, switch taken to CLOSE, green light illuminated.

2P33-F003, PRI CNMT ATMOS H2O2 ANLY INBD ISOL CH A, CLOSED, green light illuminated.

    • 2P33..F005, PRI CNMT ATMOS H202 ANLY INBD ISOL CH B RETURN LINE, switch taken to CLOSE green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 9 of 13 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 7.

Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions:

has CONFIRMED OR 2D1 1-F071, CLOSED, PERFORMED the following:

    • 2p334OO6, CLOSED, 2D1 1-F071, PRI CNMT ATMOS 2G5 1-FOil CLOSED FIS PROD MON SAMPLE LINE ISOL, CLOSED, green light 2G51F017, CLOSED, illuminated.

2D1 1-F052, CLOSED, 2P33-F006, PRI CNMT ATMOS 2D1 1-F053, CLOSED, H2O2 ANLY INBD ISOL CH B, 2B2i-Fl 12, CLOSED, CLOSED, green light 2E41-F121, CLOSED.

illuminated.

2G51-F011, TORUS WATER CLEANUP INBD ISOL, CLOSED, green light illuminated.

2G51-F017, TORUS WATER MAKEUP OUTBD ISOL, CLOSED, green light illuminated.

2D1 1-F052, PRI CNMT P15 PROD MON OUTBD ISOL, CLOSED, green light illuminated.

2D1 1-F053, PRI CNMT FIS PROD MON OUTBD ISOL, CLOSED, green light illuminated.

2B2 1-Fl 12, POST ACC RX COOL/CNMT ATMOS SMPLG OUTBD ISOL, CLOSED, green light illuminated.

2E41-F121, POST ACC RX COOL/CNMT ATMOS SMPLG OUTBD ISOL, CLOSED, green light illuminated.

(** Indicates critical step)

2013-301 SilvI 5 Page 10 of 13 I STEP PERFORMANCE STEP STN)A I 1S) 1 Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions:

has CONFIRMED OR

    • 2p33..F015, CLOSED, PERFORMED the following:
    • 2P33..FO1O, CLOSED,
    • 2p33..F015, PR! CNMT 2P70 F 03 CLOSED ATMOS H202 ANLY OUTBD

- 0 ISOL CH A, switch to CLOSE,

  • 2p33FO13, CLOSED, green light illuminated.
    • 2p33..FO11, CLOSED,
    • 2P33..F012, CLOSED ATMOS H2O2 ANLY OUTBD 2P33-F605, CLOSED, ISOL CH B, switch to CLOSE, 2D1 1-F072, CLOSED.

green light illuminated.

2P70-F003, DRWL PNEU OUTBD SUCTION ISOL, CLOSED, green light illuminated.

    • 2p33..F013, PRI CNMT ATMOS H202 ANLY OUTBD ISOL CH B RETURN LINE, switch to CLOSE, green light illuminated.

2P33-F01 1, PRI CNMT ATMOS H2O2 ANLY OUTBD ISOL CH A, CLOSED, green light illuminated.

    • 2p33..F012, H2O2 ANLY CH A RTN LN OUTBD ISOL, switch to CLOSE, green light illuminated.

2P33-F605, 02 Analyzer Isol Valve, CLOSED, green light illuminated 2D11-F072, PRI CNMT ATMOS H202 ANLY FIS PROD MON RTN LN ISOL, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 11 of 13 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 9.

Operator confirms the following At panel 2H1 1-P700, the operator automatic actions:

has CONFIRMED the following:

2P33-F014, CLOSED, 2P33-F014, PRI CNMT ATMOS 2G51-F013, CLOSED, H202 ANLY OUTBD ISOL CH 2G51-F012, CLOSED.

B, CLOSED, green light illuminated.

2G51-F013, TORUS WATER MAKEUP INBD ISOL, CLOSED, green light illuminated.

2G51-F012, TORUS DRN/PURIF TORUS WATER CLEANUP OUTBD ISOL, CLOSED, green light illuminated.

10.

Operator confirms that At panel 2H1 1-P607, the operator 2C51-JOO4A-D are CLOSED has CONFiRMED that 2C51-JOO4A-D, TIP BALL VLVS, CLOSED, green light illuminated.

11.

Operator confirms the following At panel 2H1 1-P657, the operator automatic actions:

has CONFIRMED the following:

2T48-F334A, CLOSED, 2T48-F334A, CAD A 2T48-F335A, CLOSED, DRYWELL VENT ISOL VLV, 2T48-F332A, CLOSED, CLOSED, green light illuminated.

2T48-F333A, CLOSED.

2T48-F335A, CAD A DRYWELL VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F332A, CAD A TORUS VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F333A, CAD A TORUS VENT ISOL VLV, CLOSED, green light illuminated.

(** Indicates critical step)

I STEP 2013-301 SIM 5 Page 12 of 13 SAT/UNSAT (COMMENTS)

PROMPT:

WHEN the operator addresses 2E1 1-FO79AIB and 2E1 1-FO8OAJB on panels 2H2 1 -P018 and 2H2 1 -P021, INFOR1I the operator that another operator has verified these valves are closed. These valves can also be checked using the Isolation Valve Display on 2H1 1-P601.

PERFORMANCE STEP STANDARD I

12.

Operator confirms the following At panel 2H1 1-P657, the operator automatic actions:

has CONFIRMED the following:

2T48-F209, CLOSED, 2T48-F209, DRWL TO TORUS 2T48-F21 1, CLOSED.

DP SYS INBD ISOL, CLOSED, green light illuminated.

2T48-F21 1, DRWL TO TORUS DP SYS INBD ISOL, CLOSED, green light illuminated.

13.

Operator confirms the following At panel 2H1 1-P657, the operator automatic actions:

has CONFIRMED the following:

2T48-F334B, CLOSED, 2T48-F334B, CAD B 2T48-F335B, CLOSED, DRYWELL VENT ISOL VLV, 2T48-F332B, CLOSED, CLOSED, green light illuminated.

2T48-F333B, CLOSED, 2T48-F335B, CAD B 2T48-F210, CLOSED, DRYWELL VENT ISOL VLV, 2T48-F212, CLOSED.

CLOSED, green light illuminated.

2T48-F332B, CAD B TORUS VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F333B, CAD B TORUS VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F210, DRWL TO TORUS DP SYS OUTBD ISOL, CLOSED, green light illuminated.

2T48-F212, DRWL TO TORUS DP SYS OUTBD ISOL, CLOSED, green light illuminated.

( Indicates critical step)

2013-301 SIM 5 Page 13 of 13 I STEP I

PERFORMANCE STEP STANDARD I

(COMMENTS)

PROMPT:

IF the operator addresses resetting the Group Isolation, INFORM the operator that it is NOT desired at this time.

END TIME:________

NOTE:

The terminating cue shall be given to the operator when:

After JPM step #13 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

(*

  • Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT CR/SIM 6 RO & SRO-I TITLE PERFORM A DIESEL GENERATOR MANUAL START SURVEILLANCE (TRIP FAILURE)

AUTHOR MEDIA NUMBER TIME ANTHONY BALLANTHONY 2013-301 SIM 6 15 Minutes BALL RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SKEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2013-301 SIM 6 Authors Supvs Rev.

Date Reason for Revision Initials Initials No.

00 10/18/10 Initial development, removed first 31 steps of LR-JP-25034 to time ELI considerations.

CME 01 Revised to match procedure and retitled to 20 13-301 Sim 6 ARB for ILT-8 NRC Exam. Added Event Triggers to actuate the malfunctions when the DIG kW is increased to 1600 kW.

This JPM will be retitled to LR-JP-25034A after NRC Exam.

2013-301 SIM 6 Page 1 of 6 UNIT1

(

)

UNIT2 (X)

TASK TITLE:

PERFORM A DIESEL GENERATOR MANUAL START SURVEILLANCE (TRIP FAILURE)

JPM NUMBER:

2013-301 SIM6 TASK STANDARD:

The task shall be completed when the Operator has tied the 2A Diesel Generator to the 2E 4160 VAC Bus per 34SV-R43-004-2. Then following a failure to auto trip, shutdown the Diesel Generator.

TASK NUMBER:

028.016 OBJECTIVE NUMBER:

028.016.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.22 SRO 2.93 K/A CATALOG NUMBER: 264000A404 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.70 SRO 3.70 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL REFERENCES Umt 2 34SV-R43-004-2 (current version) 34AR-652-1 11-2 (current version) 34AR-652-129-2 (current version)

REQUIRED MATERIALS:

Unit 2 34SV-R43-004-2 (current version) 34AR-652-1 11-2 (current version) 34AR-652-129-2 (current version)

Stopwatch APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

Key #

MALF #

TITLE FINAL RAMP ACT.

VALUE RATE TIME R43-3 mf6521 1665 Spur Ann LUBE OIL PRESS LOW 9999 R43-3 mf6521 1683 Spur Ann - EMERGENCY ENGINE 9999 SHUTDOWN rfR43294 DG 2A Engine Remote Speed Droop (0 100) 50 4.

ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger #

DESCRIPTION CONDITIONS Expert Command R43-3 Inserts DG 2A oil break alarms aoR43-A_k-WATTanvToPanel >.33 4.

Perform all steps of 34SV-R43-004-2, up to and including step 7.2.3.18.

5.

ESTIMATED Simulator SETUP TIME:

20 Minutes NOTE To monitor Diesel Generator A engine speed, governor setting, frequency, perform the following steps at the instructor station.

1.

Click on any screen, off of any list.

2.

Type ALT-P.

3.

Select TABLES.

4.

Select TABLES (below cancel).

5.

Select TABLE DIESEL GENERATORS.

6.

Select OPEN SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to SNAP 614 OR to IC#113, 100% power.

2.

INSERT the following MALFUNCTIONS:

2013-301 SIM 6 Page 2 of 6 3.

INSERT the following REMOTE FUNCTIONS:

REM #

DESCRIPTION STATUS

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

34SV-R43-004-2, Diesel Generator 2A Semi-Annual Test is in progress.

2.

All steps of 34SV-R43-004-2, up to and including step 7.2.3.18, have been completed.

3.

No other testing or maintenance is in progress.

4.

A SO is in the Diesel Building 5.

The NPO originally performing this task was called away (personal emergency).

INITIATING CUES:

Continue the Diesel Generator 2A Semi-Annual Test, per 34SV-R43-004-2, at step 7.2.3.19.

1ST is NOT being performed.

2013-301 SIM 6 Page 4 of 6 I STEP PERFORMANCE STEP STANDARD I (& 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN i

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation NOTE To Evaluator:

Perform the turn-over for this JPM prior to entering the simulator when possible (i.e. allow the student to review the procedure in the Virtual Simulator or Simulator Assessment Room, etc.), doing this will minimize the time the simulator is NOT being actively used.

START TIME:

1.

Operator identifies the procedure Operator has OBTAINED needed to perform the task.

procedure 34SV-R43-004-2.

2.

Operator identifies the materials that Operator OBTAINS a stopwatch.

are required.

3.

Operator reviews the procedures Operator has REVIEWED the precautions and limitations, precautions and limitations.

PROMPT:

WHEN the Operator addresses obtaining permission from the Shift Supervisor, INFORM the Operator that permission has been granted.

PROMPT:

IF ASKED inform the Operator to assume a Pre-Job brief has been performed.

(*

  • Indicates critical step)

2013-301 SIM 6 Page 5 of 6 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 4.

Observe the voltage on each phase of At panel 2H1 1-P652, the 4160V Bus 2E and record the highest Operator OBSERVES the voltage

voltage, on each phase of 4160V Bus 2E, as indicated on VOLTMETER, 2R43-R904, and RECORDS the highest voltage.

5.

Using Diesel Generator 2A Voltage At panel 2H1 1-P652, the Adjust switch, increase diesel output Operator uses Diesel Generator voltage to match the highest phase 2A VOLTAGE ADJUST switch, voltage on 4160V Bus 2E.

INCREASES diesel output voltage to match the highest phase voltage on 4160V Bus 2E.

6 When the synchroscope indicates 2 At panel 2H1 1-P652, the minutes to 12 and when the Operator, when the synchroscope synchroscope lights are at the dimmest indicates 2 minutes to 12 and point, CLOSE ACB 135530.

when the synchroscope lights are at the dimmest point, CLOSES EMERGENCY SUPPLY ACB 135530, red light illuminated.

NOTE: IF during the performance of the following two steps, the Operator trips the diesel, these steps become critical and the JPM is failed.

7.

Using the Diesel Gen 2A Speed At panel 2H1 1-P652, the Adjust switch, adjust the load on the Operator uses the Diesel Gen 2A diesel to 500 to 1000 kW.

SPEED ADJUST switch, ADJUSTS the load on the diesel to 500 to 1000 kW, as indicated on KILOWAH, 2R43-R615A.

8.

Gradually increase load to between At panel 2H1 1-P652, the 2764 and 2825 kW.

Operator uses the Diesel Gen 2A SPEED ADJUST switch, ADJUSTS the load on the diesel to 2764 and 2825 kW, as indicated on KILOWATU, 2R43-R615A.

(** Indicates critical step)

2013-301 SIM 6 Page 6 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 SIMULATOR OPERATOR: AS the Operator is increasing the diesel loading to 1750 kW, ENSURE EVENT TRIGGER R43-3 ACTIVATES MALFUNCTIONS mf6521 1665, Spur Ann LUBE OIL PRESS LOW.

5 10 seconds later, mf65211683, Spur Ann

EMERGENCY ENGINE SHUThOWN.

PROMPT:

SIMULATOR OPERATOR:

PAGE the Operator as the SO in the Diesel Building and REPORT: An oil line has split and spewing hot oil and I CANNOT get to the diesel controls.

    • 9 Opens the Emergency Supply ACB.

At panel 2H1 1-P652, the Operator, OPENS EMERGENCY SUPPLY ACB 135530, green light illuminated.

    • 1O.

Take the Diesel Gen 2A Start switch At panel 2H1 1-P652, the to the STOP position.

Operator TAKES the Diesel Gen 2A START switch to the STOP position.

PROMPT:

ONCE the Operator has stopped the diesel, INFORM the Operator that another Operator will complete the shutdown, contact Maintenance, and place the diesel into Standby configuration.

ENI)

TIME:

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 10.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

(** Indicates critical step)

Southern Nuclear K I. Hatch Nuclear Plant Operations Training JPM DRAFT CRISIM 7 RO & SRO4 TITLE LOSS OF AIR ACTIONS FOR RX BLDG VENTILATION AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 SIM 7 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2013-301 SIM 7 Rev. No.

Date Reason for Revision Authors Supvs Imtaals Initials 00 05/18/09 Initial development FNF CME 01 Revised to match procedure and retitled to 201 3-30 1 ARB Sim 7 for ILT-8 NRC Exam. This JPM will be retitled_after_NRC_Exam.

2013-301 SilvI 7 Page 1 of 9 UNIT 1

()

UNIT2 (X)

TASK TITLE:

LOSS OF AIR ACTIONS FOR RX BLDG VENTILATION JPM NUMBER:

20 13-301 SIM 7 TASK STANDARD:

The task shall be complete when the operator has completed 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air.

TASK NUMBER:

H-OPRO200.025 OBJECTIVE NUMBER:

200.025.C from SG50273 PLANT HATCH JTA IMPORTANCE RATING:

RO 3.93 SRO 3.61 K/A CATALOG NUMBER: 295019AK2.08 K/A CATALOG JTA IMPORTANCE RATING:

RO 2.8 SRO 2.9 OPERATOR APPLICABILITY:

RO GENERAL

REFERENCES:

Unit 1 & 2 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System REQUIRED MATERIALS:

Unit 1 & 2 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System completed through step 4.13.

APPROXIMATE COMPLETION TIME:

20 Minutes SIMULATOR SETUP:

See the next sheet.

SIMULATOR SETUP 2013-301 SilvI 7 Page 2 of 9 Simulator Initial Conditions:

1.

RESET the Simulator to SNAP 617 OR IC #113 and place in RUN.

2.

INSERT the following MALFUNCTIONS:

MALF #

TITLE FINAL RAMP ACT.

VALUE RATE TIME mfP5l_222A Service Air Compressor 2A Trip mfP5 1_222B Service Air Compressor 2B Trip mfP5l_222C Service Air Compressor 2C Trip mfP52_191 Instrument Air Leakage mfC7L59 Spurious Reactor Scram

3. INSERT the following OVERRIDES:

OVERIDE #

TITLE FINAL VALUE diT46-DOOIA-1 SBGTS A Fan/Filter AUTO diT46-DOO1B-1 SBGTS B Fan/Filter AUTO diP52-F565 Rx Bldg Inst. N2 to Noninter. Ser. Vlv.

OPEN 4.

Create the following EVENT TRIGGERS with the following information:

(NOTE: Use Windows Notepad to create blank *.scn and *.et files with the indicated names below. Copy the ET INFORMATION and SCN INFORMATION into the appropriate files.

Copy the 4 files into the simulators Hatchllnstr/ET directory).

SCN/ET ET INFORMATION SCN INFORMATION NAME T46-1 l.scn

SBGT A in RUN doesnt work, B works DOR diT46-DOO1B-l; T46-l 1.et diT46-DOO1A-l.iivPanel=3 CET T46-12; T46-12.scn
SBGT B in RUN doesnt work, A works DOR diT46-D00lA-i; T46-12.et diT46-D00 1 B-i.iivPanel=3 CET T46-11; 5.

ACTIVATE event triggers T46-11 and T46-12.

6.

Place Rx Mode Switch to Shutdown.

2013-3O1SllvI7 Page 3 of 9 7.

Place RCIC in service, injecting into the vessel, with level slowly rising (this is to prevent the auto start of SBGT).

8.

Mark up 34AB-P51-OO1-2 up to, but NOY including, step 4.14.

9.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

10. ESTIMATED Simulator SETUP TIME:

10 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 has lost all Service Air Compressors and they can NOT be restarted.

2.

Electrical Maintenance and I&C are checking all air system electrical circuits.

3.

The reactor has been scrammed and 34AB-C71-OOl-2, Scram Procedure is being carried out.

4.

34AWP51-OO1-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System has been partially completed.

INITIATING CUES:

Complete procedure 34ABP5lOOl-2 starting at step 4.14.

2013-301 SIM7 Page 5 of 9 STEP PERFORM4NCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critcaI steps (if used) completed correctly FAIL U

Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation PROMPT:

Provide the operator with 34AB-P51-001-2 completed up through Step 4.13.

START TIME:________

1.

The operator starts at the correct step.

Operator refers to 34AB-P51-SAT / UNSAT 001-2 and starts at step 4.14.

2.

Determine if Control Air header On panel 2H1 1-P650, Control Air SAT / UNSAT Pressure is below 45 PSIG AND NOT Pressure, 2P52-R600, the increasing.

operator observes pressure is less then 45 psig and NOY increasing.

NOTES:

If the operator attempts to first start the A SBGT, complete steps 3-11 and skip steps 12-20 If the operator attempts to first start the B SBGT, complete steps 12-20 and skip steps 3-11.

e All A controls are located on 2H1 1-P657.

All B controls are located on 2H22-P654.

SBGT air operated valves F001/2/3 fail in the OPEN position.

3.

OPEN 2T46-FOO3A, Fltr Inlet from The operator places the keylock SAT I UNSAT I NA Refuel Flr.

switch for 2T46-FOO3A, Fltr Inlet from Refuel Fir, to OPEN.

4.

Open 2T46-FOO1A, Fltr Inlet from Rx The operator places the keylock SAT I UNSAT / NA Bldg.

switch for 2T46-FOO1A, Fltr Inlet from Rx Bldg, to OPEN.

5.

PLACE SBGT A in RUN position The operator places the control SAT I UNSAT switch for SBGT A to RUN.

(*

  • Indicates critical step)

2013-301 SIM 7 Page 6 of 9 I

STEP I

PERFORMANCE STEP STANDARD I

(COMMENTS) I NOTE:

The operator should note that SBGT A does NOT start and continue with SBGT B start.

    • 6.

OPEN 2T46-FOO3B, Fltr Inlet from The operator places the keylock SAT / UNSAT / NA Refuel Fir.

switch for 2T46-FOO3B, Fltr Inlet from Refuel Flr, to OPEN.

    • 7 Open 2T46-FOOIB, Fltr Inlet from Rx The operator places the keylock SAT / UNSAT / NA Bldg.

switch for 2T46-FOO1B, Fltr Inlet from Rx Bldg, to OPEN.

    • 8.

PLACE SBGT B in RUN position The operator places the control SAT / UNSAT switch for SBGT B in RUN.

9.

CONFIRM 2T46-FOO2B OPENS.

The operator observes 2T46-SAT I UNSAT.

FOO2B red light ILLUMINATED.

10.

CONFIRM SBGT B HTR Red Light The operator observes SBGT B SAT / UNSAT ILLUMINATES HTR Red Light ILLUMINAThD.

11.

CONFIRM SBGT Flow increases to The operator observes SBGT SAT / UNSAT 1500-4000 SCFM.

flow between 1500-4000 scfm on 2U41 -R600.

NOTES:

If the operator attempts to first start the A SBGT, complete steps 3-11 and skip steps 12-20 e

If the operator attempts to first start the B SBGT, complete steps 12-20 and skip steps 3-11.

All A controls are located on 2H11-P657.

All B controls are located on 2H22-P654.

e SBGT air operated valves F001/2/3 fail in the OPEN position.

12.

OPEN 2T46-FOO3B, Fltr Inlet from The operator places the keylock SAT / UNSAT / NA Refuel Fir.

switch for 2T46-FOO3B, Fltr Inlet from Refuel Flr, to OPEN.

13.

Open 2T46-FOO1B, Fltr Inlet from Rx The operator places the keylock SAT I UNSAT I NA Bldg.

switch for 2T46-FOO1B, Fltr Inlet from Rx Bldg, to OPEN.

14.

PLACE SBOT B in RUN position The operator places the control SAT I UNSAT switch for SBGT B in RUN.

NOTE: The operator should note that SBGT B does NOT start and continue with SBGT A start.

(*

  • Indicates critical step)

2013-301 SIM 7 Page 7 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1

    • 15.

OPEN 2T46-FOO3A, Fltr Inlet from The operator places the keylock SAT! UNSAT! NA Refuel Fir.

switch for 2T46-FOO3A, Fltr Inlet from Refuel Fir, to OPEN.

    • 16 Open 2T46-FOO1A, Fltr Inlet from The operator places the keyiock SAT! UNSAT / NA Rx Bldg.

switch for 2T46-FOO1A, Fltr Inlet from Rx Bldg, to OPEN.

    • 17 PLACE SBGT A in RUN position The operator places the control SAT! UNSAT switch for SBGT A to RUN.

18.

CONFIRM 2T46-FOO2A OPENS.

The operator observes 2T46-SAT! UNSAT FOO2A red light LLUMINATED.

19.

CONFIRM SBGT A HTR Red Light The operator observes SBGT A SAT / UNSAT ILLUMINATES HTR Red Light ILLUMINATED.

20.

CONFIRM SBGT Flow increases to The operator observes SBGT SAT / UNSAT 1500-4000 SCFM.

flow between 1500-4000 scfm on 2T41-R6 18.

NOTE: The operator may NOT check the next step until after all are other steps of this JPM are complete.

21.

Checks the Rx bldg and RF Floor On panel 2H1 1-P700 the operator SAT! UNSAT Diff pressures are negative, checks the RF Floor to Outside Air dp and the Rx Bldg to Outside Air dp on recorders 2T46-R604A and 2T46-R604B.

The dp will be approximately (negative) -0.25 inches.

NOTE: For the fans listed below, if a fan is NOT running and does NOT auto start, then the step is NOT critical. The step is to be marked SAT if, after the operator is done, the fan is NOT running (green light illuminated).

    • 22.

TRW 2U41-COO1A, Turb Bldg Vent On panel 2H1 l-P654 the operator SAT! UNSAT Supply Fan places control switch for 2U41-COO1A, Turb Bldg Vent Supply Fan, to the OFF position, green light illuminated.

    • 23.

TRIP 2U41-COO1B, Turb Bldg Vent On panel 2H1 l-P654 the operator SAT ! UNSAT Supply Fan places control switch for 2U4l-COO1B, Turb Bldg Vent Supply Fan, to the OFF position, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 7 Page 8 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

    • 24.

TRIP 2U41-COO2A, Turb Bldg Vent On panel 2H1 1-P654 the operator SAT I UNSAT Exhaust Fan places control switch for 2U41-COO2A, Turb Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.

    • 25.

TRIP 2U41-COO2B, Turb Bldg Vent On panel 2H1 1-P654 the operator SAT I UNSAT Exhaust Fan places control switch for 2U41-COO2B, Turb Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.

    • 26.

TRIP 2T41-COO1A, Rx Bldg Vent On panel 2H1 1-P657 the operator SAT I UNSAT Supply Fan places control switch for 2T41-COO1A, Rx Bldg Vent Supply Fan, to the OFF position, green light illuminated.

    • 27.

TRIP 2T41-COO1B, Rx Bldg Vent On panel 2H1 1-P657 the operator SAT? UNSAT Supply Fan places control switch for to the OFF position, green light illuminated.

    • 2$.

TRIP 2T41-COO7A, Rx Bldg Vent On panel 2H1 1-P657 the operator SAT / UNSAT Exhaust Fan places control switch for 2T41-COO1B, Rx Bldg Vent Supply Fan, to the OFF position, green light illuminated.

    • 29.

TRIP 2T41-COO7B, Rx Bldg Vent On panel 2H1 1-P657 the operator SAT? UNSAT Exhaust Fan places control switch for 2T41-COO7B, Rx Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.

    • 30.

TRIP 2T41-B017 Fan 1, Rx Bldg On panel 2H1 1-P657 the operator SAT / UNSAT Recirc Fan places control switch for 2T41 -

B017 Fan 1, Rx Bldg Recirc Fan, to the OFF position, green light illuminated.

    • 31.

TRIP 2T41-B017 Fan 2, Rx Bldg On panel 2H1 l-P657 the operator SAT? UNSAT Recirc Fan places control switch for 2T41 -

B017 Fan 2, Rx Bldg Recirc Fan, to the OFF position, green light illuminated.

    • 32.

TRIP 2T41-COO2A, Refuel Fir Vent On panel 2H1 1-P657 the operator SAT? UNSAT Supply Fan places control switch for 2T41-COO2A, Refuel Flr Vent Supply Fan, to the OFF position, green light illuminated.

  • Indicates critical step)

2013-301 SIM 7 Page 9 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1

    • 33*

TRIP 2T41-COO2B, Refuel Fir Vent On panel 2H1 1-P657 the operator SAT! UNSAT Supply Fan places control switch for 2T41-COO2B, Refuel Fir Vent Supply Fan, to the OFF position, green light illuminated.

    • 34 TRiP 2T41-COO5A, Refuel Fir Vent On panel 2H1 1-P657 the operator SAT / UNSAT Exh Fan places control switch for 2T41-COO5A, Refuel Fir Vent Exh Fan, to the OFF position, green light illuminated.
    • 35 TRIP 2T41-COO5B, Refuel Fir Vent On panel 2H1 l-P657 the operator SAT / UNSAT Exh Fan places control switch for 2T41-COO5B, Refuel Flr Vent Exh Fan, to the OFF position, green light illuminated.

36.

Confirm OPEN/OPEN 2N21-F014, The operator sends an SO to SAT I UNSAT Condensate Demineralizer Bypass confirm OPEN/OPEN 2N21-Valve.

F014, Condensate Demineralizer Bypass Valve, at panel 2N21-Pool.

PROMPT:

WhEN the operator sends an SO to confirm the valve is open, INFORM the operator that another operator will complete the remainder of 34AB-P51-00l-2.

END TIME:________

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 36.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator is prompted that another operator will complete 34AB-P5 1-001-2.

Operator states the task is complete.

(** Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT CRISIM 8 ALL SOUTHERN COMPANY TITLE PLACE THE CONTROL ROOM HVAC SYSTEM IN THE ISOLATION MODE (ALT-PATH 1ST FAN FAILURE)

AUTHOR MEDIA NUMBER TIME Anthony BaIl 2013-301 SIM-8 21.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2013-301 SIM 8 Rev. No.

Date Reason for Revision I Authors Supvs Initials Initials 00 Revised to match procedure and retitled to 2013-301 Sim 8 for ILT-8 NRC Exam. Added 1st C012 fan attempted will fail requiring the other fan to be placed into service. This JPM will be retitled after NRC Exam.

ARB

2013-301 SIM-8 Page 1 of 6 UNIT1 (X)

UNIT2

(

)

TASK TITLE:

PLACE THE CONTROL ROOM HVAC SYSTEM IN THE ISOLATION MODE (ALT-PATH 1ST FAN FAILURE)

JPM NUMBER:

2013-301 SIM-8 TASK STANDARD:

The task shall be completed when the Control Room Ventilation System has been placed in the Isolation per 34S0-Z41-001-1.

TASK NUMBER 037 009 OBJECTIVE NUMBER:

037.009.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.21 SRO 2.69 K/A CATALOG NUMBER:

K/A CATALOG JTA IMPORTANCE RATING:

RO SRO OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 34SO-Z41 -001-1 (current version)

_REQUIRED MATERIALS:

Unit 1 34S0-Z41-001-1 (current version)

APPROXIMATE COMPLETION TIME:

21.0 Minutes SIMULATOR SETUP:

N/A

UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 1 is operating at 100% power.

2.

The Main Control Room Ventilation System has been operating in a Normal Ventilation configuration for several days.

3.

Plant Conditions require MCR Ventilation be swapped to Isolation Mode.

INITIATING CUES:

Swap Main Control Room Ventilation to Isolation Mode per 34S0-Z41-001-1, Control Room Ventilation System.

2013-301 SllvI-8 Page 3 of 6 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND L

Mark the JPM as a PASS I

For initial trg all steps completed correctly OR PASS IJ For continuing trg, critical steps (if used) completed correctly FAIL L1 Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation START TIME:

1.

Operator identifies the procedure Operator has identified the correct needed to perform the task.

procedure as 34SO-Z41-001-1.

2.

Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.

3.

Close Roll Filter Bypass, 1Z41-F015.

At MCR Door C70, ROLL FILTER BYPASS, 1Z41-F015 control switch is in CLOSE, green light ONLY illuminated.

    • 4*

Close Outside Air Intake Damper, At panel 1H1 1-P657, FILTER 1Z41-F016.

INLET control switch, 1Z41-F016, is in CLOSE position, green light ONLY illuminated.

5.

Close Filter Inlet, 1Z41-FO13A.

At panel 1H1 1-P657, FILTER INLET control switch, 1Z41-FO13A, is in CLOSE position, green light ONLY illuminated.

(** Indicates critical step)

2013-301 SIM-8 Page 4 of 6 SAT!UNSAT I STEP 1

PERFORMANCE STEP STANDARD I

(COMMENTS)

  1. 1
    • 6.

Close Filter Inlet, 1Z41-FO13B.

At panel lHl 1-P654, FILTER INLET control switch, 1Z41-FO13B, is in CLOSE position, green light ONLY illuminated.

NOTES:

If the operator starts with the A Recirc Fan, CO12A, perform steps 7-9, skip 10-12, AND then continue with step 13.

If the operator starts with the B Recirc Fan, CO12B, skip steps 7-9 and start with step 10.

7.

Start Recirc Fan, 1Z41-CO12A At panel 1H1 1-P657 (P654),

RECIRC FAN, 1Z41-CO12A control switch is in RUN, green light ONLY illuminated.

NOTE:

The operator should note that CO12A does NOT start and continue with CO12B start.

    • 8.

Start Recirc Fan, 1Z41-CO12B At panel 1H1 1-P654, RECIRC FAN, 1Z41-CO12B control switch is in RUN, red light illuminated.

9.

Confirm the following dampers are At panel 1H1 1-P654, the open:

following dampers are OPEN for 1Z41-FOO8A Fan 1Z41-CO12B, red lights 1Z41-FOO8B ONLY illuminated:

1Z41-FOO8C 1Z41-FOO8A, Inlet to UNIT BOO3A 1Z41-FO14B 1Z41-FOO8B, Inlet to UNIT BOO3B 1Z41-FOO8C, Inlet to UNIT BOO3C 1Z41-FO14B, RECIRC INLET 10.

Start Recirc Fan, 1Z41-CO12B At panel 1H1 l-P654, RECIRC FAN, 1Z41-CO12B control switch is in RUN, green light ONLY illuminated.

NOTE:

The operator should note that CO12B does NOT start and continue with CO12A start.

  • Indicates critical step)

2013-301 SIM-8 Page 5 of 6 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

Start Recirc Fan, 1Z41-CO12A At panel 1H1 1-P657, RECIRC FAN, 1Z41-CO12A control switch is in RUN, red light illuminated.

12.

Confirm the following dampers are At panel 1H1 1-P657, the open:

following dampers are OPEN for 1Z41-FOO7A Fan 1Z41-CO12A, red lights 1Z41-FOO7B ONLY illuminated:

1Z41-FOO7C 1Z41-FOO7A, Inlet to UNIT BOO3A 1Z41-FO14A 1Z41-FOO7B, Inlet to UNIT BOO3B 1Z41-FOO7C, Inlet to UNIT BOO3C 1Z41-FO14A, RECIRC INLET Close the following dampers:

At panel 1H1 1-P654, the 1Z41-F012 following dampers are CLOSED, 1Z41-F019 & F020 green lights ONLY illuminated:

1Z41-F012, FILTER BYPASS 1Z41-F019 & F020, MENS &

WOMENS RESTROOM VENT ISOL DMPR

    • 14.

Close Filter Bypass, 1Z41-F01 1.

At panel 1H1 1-P657, FILTER BYPASS damper 1Z41-F01 1 is CLOSED, green light illuminated.

15.

Confirm Mens Restroom Door is In the Control Room, the Mens closed.

Restroom Door is CLOSED.

NOTE:

It is acceptable for the operator to leave the failed CO12AIB in either the Standby, Auto or Off position.

16.

Place control switch for Recirc Fan At panel 1H1 1-P654 (P657),

1Z41-CO12B (CO12A) in Standby.

RECLRC FAN 1Z41-CO12B (CO12A) control switch is in STANDBY, green light illuminated.

  • Indicates critical step)

2013-301 SIM-8 Page 6 of 6 I STEP PERFORMANCE STEP STANDARD I

(COM]vIENTS) 7 NOTE:

The following positions will be dictated by which fan the operator attempted to start first.

17.

Confirm the following dampers are At panel 1H1 1-P654 (P657), the closed:

following dampers are CLOSED 1Z4 1 -FOO8A(FOO7A) for Fan 1Z4 1 -CO 1 2B (CO 1 2A),

1Z4 1 -FOO8B(FOO7B) green lights illuminated:

141 -FOO8C(FOO7C) 1Z4 1 -FOO8A(FOO7A), Inlet to UNIT BOO3A lZ4l-FO14B(FO14A) 1Z41-FOO8B(FOO7B, Inlet to UNIT BOO3B 1Z41-FOO8C(FOO7C), Inlet to UNIT BOO3C 1Z41-FO14B(FO14A), RECIRC INLET 18.

PLACE lZ4l-C009, Cable Spreading At lHl l-P654, PLACE 1Z41-Room Supply Fan, to OFF.

C009, Cable Spreading Room Supply Fan, to the OFF position.

19.

PLACE 1Z41-CO1O, Cable Spreading At 1H1 1-P654, PLACE lZ4l-Room Exhaust Fan, to OFF.

COlO, Cable Spreading Room Exhaust Fan, to the OFF position.

20.

Initiate compensatory action to Initiate compensatory action to confirm twice per shift that the confirm twice per shift that the temperature in the cable spreading temperature in the cable room is less than 105°F.

spreading room is less than 105°F. An Engineering Evaluation is required if the temperature reaches 105°F.

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 20.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

END TIME:________

(*

  • Indicates critical step)

Southern Nuclear Company Operations Training JPM DRAFT PLANT 1 ALL Title VENT THE SCRAM AIR HEADER thor:

Media Number:

Time Anthony Ball 2013-301 PLANT 1 7.0 Minutes Reviewed By:

Date:

Reviewed by Instructional Technologist or designee Date Approved By:

Date:

SOUTHERN COMPANY

Course Number I

Program Name Media Number OPERATIONS TRAINING 2013-301 PLANT 1 Rev. No.

Date

{

Reason for Revisions Authors Sups Initials Initials 12 02/27/02 Include initial operator statement RAB RAB 13 06/01/05 Deleted S from procedure numbers, changed BEB RAB Revision and Rev, numbers to Current Version, RAB revised Initial License statement for successful completion 14 04/06/06 Remove Response Cues RAB RAB 15 09/25/09 Added HU steps.

CLN ALD ADY 15.1 8/11/ 11 Reviewed JPM against current procedure. Added MMG DNM the following prompt, IF the operator addresses Scram Air Header Pressure, INDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

15.2 This JPM was modified to match procedure and ARB renumbered from LR-JP-10.15 for TLT-8 NRC Exam. After this exam it will be re-titled back to original LR JPM number.

2

Line Contributors e following individuals contributed to the development of this lesson plan.

Rev. No.

List of Contributors 3

2013-301 PLANT 1 Page 1 of 7 UNIT 1 (X)

UNIT 2 (X)

TASK TITLE:

Vent the Scram Air Header JPM NUMBER 2013-301 PLANT 1 TASK STANDARD The task shall be completed when the operator has successfully vented the scram air header per 31E0-EOP-103.

TASK NUMBER:

010.015 OBJECTIVE NUMBER 0100150 PLANT HATCH JTA IMPORTANCE RATING:

RO 4.50 SRO 3.65 K/A CATALOG NUMBER: 212000A417 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.10 SRO 4.10 OPERATOR APPLICABILITY:

Systems Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2 31E0-EOP-103-1 3 1EO-EOP-103-2 (current version)

(current version) 31E0-EOP-01 1-1 31E0-EOP-01 1-2 (current version)

(current version)

_REQUIRED MATERIALS:

Unit 1 Unit 2 3 1EO-EOP-103-1 3 1EO-EOP-103-2 (current revision)

(current revision)

Adjustable Wrench Adjustable Wrench APPROXIMATE COMPLETION TIME:

7.0 Minutes SIMULATOR SETUP:

N/A

UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

A Reactor scram signal has been received and all the control rods did NOT insert to Position 02 and Reactor power is greater than 10%.

2.

The blue scram inlet and outlet valve lights are extinguished.

3.

31E0-EOP-01 1-1 (RCA) is in progress.

INITIATING CUES:

Vent the scram air header per 31E0-EOP-103-1.

2013-301 PLANT 1 Page 3 of 7 I STEP PERFORMANCE STEP STANDARD f 1) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly U

Mark the JPM as a FAIL FAIL U

Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

1.

Operator identifies the materials that Operator identifies the required are required. (pliers) materials and where to obtain.

NOTE:

WHEN the Operator closes 1CI 1-F095 valve, the handwheel will be turned in the clockwise direction until it will NOT turn any farther.

    • 2.

Close 1C1 1-F095.

At location 13ORARO3, 1C11-F095, SCRAM AIR HEADER ISOLATION VALVE is CLOSED.

    • 3*

Remove cap if installed from end of At location 13ORARO3, cap is piping downstream of REMOVED from end of piping 1C11-R013-TV1.

downstream of 1C1 l-R013-TV1.

4.

Open or verify open 1C1 1-R013-IV1.

At location 13ORARO3, 1C1l-R013-IV1, PRESSURE INSTRUMENTATION ISOLATION VALVE is OPEN.

(*

  • Indicates critical step)

2013-301 PLANT I Page 4 of 7 I STEP I

PERFORMANCE STEP STANDARD (COMMENTS)

I SAT!UNSAT

  1. 1
    • 5 Open 1C1 1-R013-TV1.

At location 13ORARO3, 1C11-R013-TV1, PRESSURE INSTRUMENTATION VENT VALVE, is OPEN, Scram Air Header pressure decreasing on 1C1 1-PI-R013.

PROMPT:

IF the operator addresses Scram Air Header Pressure, INDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

NOTE:

The terminating cue shall be given to the operator when:

After JPM step #5 is complete.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

END TIME:________

(*

  • Indicates critical step)

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

A Reactor scram signal has been received and all the control rods did NOT insert to Position 02 and Reactor power is greater than 10%.

2.

The blue scram inlet and outlet valve lights are extinguished.

3.

31E0-EOP-O11-2 (RCA) is in progress.

INITIATING CUES:

Vent the scram air header per 31E0-EOP-103-2.

2013-301 PLANT 1 Page 6 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly Li Mark the JPM as a FAIL FAIL LI Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

1.

Operator identifies the materials that Operator identifies the required are required. (pliers) materials and where to obtain.

NOTE:

WHEN the Operator closes 2C1 1-F095 valve, the handwheel will be turned in the clockwise direction until it will NOT turn any farther.

    • 2.

Close 2C1 1-F095.

At location 130RAR22, 2C1 1-F095, SCRAM AIR HEADER ISOLATION VALVE is CLOSED.

    • 3*

Remove cap if installed from end of At location 1 30RAR22, cap is piping downstream of REMOVED from end of piping 2C1 1-R013-TV1.

downstream of 2C1 1-R013-TV1.

4.

Open or verify open 2C1 1-R013-IV1.

At location 130RAR22, 2C11-R013-IV1, PRESSURE INSTRUMENTATION ISOLATION VALVE is OPEN.

(** Indicates critical step)

2013-301 PLANT 1 Page 7 of 7 SAT/UNSAT I STEP 1

PERFORMANCE STEP STANDARD I

(COMMENTS)

  1. 1
    • 5*

Open 2C11-R013-TV1.

At location 130RAR22, 2C1 1-R013-TV1, PRESSURE INSTRUMENTATION VENT VALVE, is OPEN, Scram Air Header pressure decreasing on 2C1 1-PI-R013.

PROMPT:

IF the operator addresses Scram Air Header Pressure, INDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

NOTE:

The terminating cue shall be given to the operator when:

END TIME:________

When the operator completes step 5.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

(** Indicates critical step)

Southern Nuclear Company Operations Training JPM DRAFT PLANT 2 RO & SRO-I Title FROM THE REMOTE SHUTDOWN PANEL, START RHR IN TORUS COOLING ithor:

Media Number:

Time Anthony Ball 2013-301 PLANT 2 22.0 Minutes Reviewed By:

Date:

Reviewed by Instructional Technologist or designee Date Approved By:

Date:

SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 PLANT 2 Authors Sups Rev. No.

Date Reason for Revisions Initials Initials 11 10/31/00 Include objective number RAB DHG 12 02/26/02 Include initial operator statement RAB RAB 13 03/17/05 Deleted S from procedure numbers, changed Revision and BEB DHG Rev, numbers to Current Version, changed Reactor Operator to Nuclear Plant Operator, and changed IC #107 for Simulator Setup.

14 05/31/05 Revised Initial License statement for successful completion RAB RAB 15 04/06/06 Remove Response Cues RAB RAB 16 08/07/08 Corrected to match procedure step for confirming open GHC BKW 2E1 1-FOO3B.

16.1 8/11/11 Reviewed JPM against current procedure. Added pass! fail MMG DNM criteria.

16.2 This JPM was modified to match procedure and ARB renumbered from LR-JP-07.20 for ILT-8 NRC Exam. After this exam it will be re-titled back to original LR JPM number.

2

Line Contributors 1

e following individuals contributed to the development of this lesson plan.

Rev. No.

List of Contributors 3

2013-301 PLANT 2 Page 1 of 6 UNIT 1 (X)

UNIT 2 (X)

TASK TITLE:

FROM THE REMOTE SHUTDOWN PANEL, START RHR IN TORUS COOLING JPM NUMBER:

2013-301 PLANT 2 TASK STANDARD:

The task shall be completed when the operator has successfully placed the B loop of RHR into Torus Cooling from the Remote Shutdown Panel per 31RS-OPS-001.

TASK NUMBER:

007.020 OBJECTIVE NUMBER:

007.020.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.40 SRO 3.80 K/A CATALOG NUMBER: 295016G006 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.10 SRO 4.10 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 3 1RS-OPS-001-1 31RS-OPS-001-2 (current version)

(current version) 31 RS-OPS-001 -1 (current version)

Key for Remote Shutdown Panel 31 RS-OPS-001-2 (current version)

Key for Remote Shutdown Panel (if performed in 1ant)

SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE REQUIRED MATERIALS:

Unit 1 Unit 2 APPROXIMATE COMPLETION TIME:

22.0 Minutes

2013-301 PLANT 2 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to SNAP 622 OR IC#107 (7%, Xfer to Run) and leave in FREEZE.

2.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Place the Mode Switch to SHUTDOWN.

B.

Perform RC-1, RC-2, TC-1, and reset the scram.

C.

Maintain RWL between 32 to 42 inches.

D.

Place ALL the Remote Shutdown Panel Transfer switches to EMERG.

E.

Place RHRSW Pump 2B in operation at <4400 gpm as indicated on 2H2 1-P173 indicator, 2E 11 -R07 1.

3.

PLACE the Simulator in FREEZE until the crew assumes the shift.

4.

ESTIMATED Simulator SETUP TINE:

20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

An event has occurred which required the control room to be evacuated.

2.

RHR is in Standby.

3.

Normal AC power is available.

4.

RHRSW Pump 2B is running at <4400 gpm.

5.

31RS-OPS-001-2 is in progress.

INITIATING CUES:

Place RHR Loop 2B, in Torus Cooling at the Remote Shutdown Panel per 31RS-OPS-0O1-2.

2013-301 PLANT 2 Page 4 of 6 SATIUNSAT (COMNlENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Li Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:

1.

Operator identifies the materials that Operator identifies the required are required.

materials and where to obtain them.

PROMPT:

WHEN the operator addresses transfer switch positions, INDICATE for the operator that ALL transfer switches are in the EMERG position.

PROMPT:

IF the operator addresses RHRSW operation, as the Shift Supervisor, INFORM the operator that RHRSW Pump 2B is running with 4400 gpm flow.

PROMPT:

IF the operator addresses Torus temperature, INDICATE for the operator that Torus temperature is <100°F.

2.

Close valve 2E1 1-F047B.

At panel 2C82-P001, the following valve is CLOSED, green light ONLY illuminated:

HX INLET VLV, 2E1 1-F047B 3.

Confirm 2E1 1-FOO3B is open.

At panel 2C82-P001, HX OUTLET VLV, 2E1 l-FOO3B is OPEN, red light ONLY illuminated:

I STEP PERFORMANCE STEP STANDARD

(*

  • Indicates critical step)

2013-301 PLANT 2 Page 5 of 6 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 4.

Confirm 2E1 l-F048B is open.

At panel 2C82-P00l, FIX BYPASS VLV, 2El l-F048B, is OPEN, red light ONLY illuminated.

    • 5 Open valve 2E1 1-F028B.

At panel 2C82-P001, RHR TORUS SPRAY OR TEST VLV, 2E1 1-F028B, is OPEN, red light ONLY illuminated.

6.

Confirm that 2E1 1-FOO7B is open.

At panel 2C82-P001, MIN FLOW VLV, 2E1 l-FOO7B, is OPEN, red light ONLY illuminated.

    • 7*

Start RHR Pump 2E11-COO2B.

At panel 2C82-P001, RHR PUMP, 2E1 1-COO2B, is RUNNING, red light illuminated.

    • 8.

Throttle open 2E1 1-F024B and At panel 2C82-P001, the establish flow rate of less than or following has been performed:

equal to 7700 gpm.

FULL FLOW TEST LINE VLV, 2E1 l-F024B, is ThROHLED OPEN, red and green lights illuminated.

RHR FLOW, 2C82-R004, indicates 7700 gpm. (accept 6700-7700 gpm) 9.

Confirm valve 2E11-FOO7B closes.

At panel 2C82-P001, MIN FLOW VLV, 2E1 1-FOO7B, is CLOSED, green light ONLY illuminated.

    • 1O.

Confirm Open/Open valves At panel 2C82-P001, the 2E1 1-F047B and 2E1 1-FOO3B.

following valves are OPEN, red light ONLY illuminated:

FIX INLET VLV, 2E11-F047B HX OUTLET VLV, 2El 1-FOO3B

  • *11.

Close valve 2E1 1-F048B.

At panel 2C82-P001, FIX BYPASS VLV, 2E1 1-F048B, is CLOSED, green light ONLY illuminated.

PROMPT:

IF the operator addresses RHRSW to RHR dP, as a System Operator, INFORM the operator that RHRSW to RHR dP is >20 psid.

(*

  • Indicates critical step)

2013-301 PLANT 2 Page 6 of 6 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 PROMPT:

IF the operator addresses Torus Spray, as the Shift Supervisor, INFORM the operator that Torus Spray is NOT required at this time.

PROMPT:

IF the operator addresses securing Torus Cooling, as the Shift Supervisor, INFORM the operator that this is NOT desired at this time.

EN])

TIME:________

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 11.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

(** Indicates critical step)

Southern Nuclear Company Operations Training JPM DRAFT PLANT 3 ALL Title CROSSTIE INSTRUMENT BUS B TO INSTRUMENT BUS A Author:

Media Number:

Time einthony Ball 2013-301 PLANT 3 15.0 Minutes Reviewed By: N/A Date:

Reviewed by Instructional Technologist or designee Date Approved By:

Date:

SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 PLANT 3 Authors Sups Rev. No.

Date Reason for Revisions Imtials Initials 01 08/16/93 General revision RAJ3 RSG 02 08/05/96 Format change RAB DHG 3

Format modification, change title, change time allowance RAB DR 0

03/09/00 based on running average, remove prompt dealing with LPCI G

load center 04 11/03/00 Include objective number RAB DRG 05 03/19/02 Include initial operator statement RAB RAB 06 06/21/05 Revised Initial License statement for successful completion RAE RAE 07 05/05/06 Remove Response Cues RAE RAB 07.1 10/17/11 Reviewed JPM against current procedure. Added pass / fail MMG ALS criteria. Added Fundamental question to new Attachment 1.

Deleted student indentifies correct procedure, as this was given information.

7.2 This JPM was modified to match procedure and ARB renumbered from LR-JP-20019 for ILT-8 NRC Exam. After this exam it will be re-titled back to original LR JPM number.

2

Line Contributors 1e following individuals contributed to the development of this lesson plan.

Rev. No.

List of Contributors 3

2013-301 PLANT 3 Page 1 of 4 UNIT 1

()

UNIT 2 (X)

TASK TITLE:

CROSSTIE INSTRUMENT BUS B TO INSTRUMENT BUS A JPM NUMBER:

2013-301 PLANT 3 TASK STANDARD:

The task shall be completed when Instrument Bus B is crosstied to Instrument Bus A per 34AB-R25-002.

TASK NUMBER:

200.019 OBJECTIVE NUMBER:

200.0 19.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.00 SRO 3.64 K/A CATALOG NUMBER: 262001A207 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.00 SRO 3.20 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34AB-R25-002-2 (current version)

REQUIRED MATERIALS:

Unit 1 Unit 2 34AB-R25-002-2 (current version)

Key to Unit 2 RPS MG Set Room CAT 60 key APPROXIMATE COMPLETION TIME:

15.0 Minutes SIMULATOR SETUP:

N/A

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is operating at 60% power.

2.

Essential Cabinet 2B, 2R25-S037, is de-energized.

3.

Instrument Bus 2B, 2R25-S065, is de-energized due to the loss of Essential Cabinet 2B, 2R25S037.

4.

34AB-R24-00l-2, Loss of Essential AC Distribution Buses, is in progress.

5.

Essential Cabinet 2B, 2R25-S037, cannot be energized due to a faulted Feeder Breaker from 600 VAC Bus 2D, 2R23-S004.

6.

34AB-R25-002-2, Loss of Instrument Buses, is in progress.

INITIATING CUES:

Energize Instrument Bus 2B, 2R25-S065, from Instrument Bus 2A, 2R25-S064, per 34AB-R25-002-2.

2013-301 PLANT 3 Page 3 of 4 ESTEP PERFORMANCE STEP STANDARD I

(COMMENTS)

I For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:

    • 1.

At Essential Cabinet 2B, At Essential Cabinet 2B, 2R25-S037, OPEN Breaker 28.

2R25-S037, Breaker 28, 120/208V CAB 2C INSTR BUS 2B, is OPEN. Breaker switch is in the OFF position.

    • 2.

In the Unit 2 RPS M/G Set Room, at At Instrument Bus 2B, Instrument Bus 2B, 2R25-S065, 2R25-S065, Breaker 40, CLOSE Breaker 40.

CROSSTIE TO INSTR BUS 2A, is CLOSED. Breaker switch is in the ON position.

    • 3 At Tnstrument Bus 2A, 2R25-S064, At Instrument Bus 2A, CLOSE Breaker 39.

2R25-S064, Breaker 39, CROSSTIE TO INSTR BUS 2B, is CLOSED. Breaker is in the ON position.

    • 4 At Essential Cabinet 2B, OPEN At Essential Cabinet 2B, switch switch 2R26-M004 and REMOVE 2R26-M004 is OPEN and both both keys.

keys are removed.

  • Indicates critical step)

2013-301 PLANT 3 Page 4 of 4 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

CLOSE the switch.

    • 6.

In the Unit 2 RPS MG Set Room, In the Unit 2 RPS MG Set Room, INSERT one key in 2R26-M005 and 2R26-M005 is CLOSED.

CLOSE the switch.

PROMPT:

IF the operator addresses restoring any of the loads of the Instrument Bus, as the Shift Supervisor, INFORM the operator that another operator will perform the load restoration.

NOTE:

The terminating cue shall be given to the operator when:

When the operator completes step 6.

With NO reasonable pogress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

END TIME:________

(*