Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT ADMIN 1 (ALL)
SOUTHERN COMPANY TITLE Heat Stress Stay Time - Work In Steam Tunnel AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 ADMIN-1 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2013-301 ADMIN-1 Authors Supvs Rev.
Date Reason for Revision initials initials No.
oO Modified from HLT-6 NRC Exam Admin 1. After ILT-8 NRC Exam is given, this JPM will be incorporated into the ILT program with a new Media Number.
2013-301 ADMIN-1 Page 1 of 7 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
Heat Stress Stay Time - Work In Steam Tunnel JPM NUMBER:
2013-301 ADMIN-1 TASK STANDARD:
The task shall be completed when the estimated Adjusted Wet Bulb Globe Temperature has been determined and the acceptability of the stay time to complete the job JAW NMP FLS-002.
TASK NUMBER:
None OBJECTIVE NUMBER:
None K/A CATALOG JTA IMPORTANCE RATING:
K/A CATALOG NUMBER: G2.1.26 RO 3.4 SRO 3.6 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 & 2 NMP-FLS-002 (current version)
REQUIRED MATERIALS:
Unit 1 & 2 NMP-FLS-002 (current version)
APPROXIMATE COMPLETION TIME:
20 Minutes SIMULATOR SETUP:
N/A
EVALUATOR COPY UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
You are a member of a team scheduled to perform work in the Unit 2 Steam Tunnel.
2.
The work will be in close proximity to Main Steam Lines which are pressurized with 700 psig steam.
3.
Steam Tunnel Temperature is 98°F.
4.
Steam Tunnel Humidity is 100%.
5.
Worker Clothing: OREX coveralls over Personal modesty garments.
6.
The work that is being performed is HEAVY WORK LEVEL.
7.
The work will take 28 minutes to complete.
INITIATING CUES:
Use NMP-FLS-002, Heat Stress and the information provided to determine BOTH:
The estimated Adjusted Wet Bulb Globe Temperature (AWBGT)
AND If the STAY TIME for the team members is acceptable to complete the work.
2013-301 ADMIN-1 Page 3 of 7 I STEP PERFORMANCE STEP STANDARD j
(COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN 1
Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.
Reference:
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
START TIME:________
NOTE: The candidate may review the Precautions & Limitations and various sections of the procedure prior to determining the AWBGT and stay time.
NOTE: If the candidate does NOT use the Attachment 1 flowchart for this JPM; but the AWBGT and Stay Times are CORRECTLY determined, then the task will be considered PASSED with comments explaining that Hatch Procedure Use expectations were NOT met.
1.
Step 6.5 direction: Follow decision The candidate enters the decision making flowchart contained in making flowchart contained in..
PROMPT:
IF ASKED whether a WBGT meter is available to be used, INFORM the candidate that the task of estimating stay time will NOT be performed using a WBGT meter.
(*
- Indicates critical step)
2013-301 ADMIN-1 Page 4 of 7 I STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 1 2.
Determine WBGT using one of the The candidate selects Estimate following methods.
WBGT using table provided in Appendix B if air temperature and relative humidity are known or measured.
The candidate evaluates Appendix B and DETERMINES that at 98°F with 100% humidity, the WBGT= 98°F, then adds
+3°F for radiant heat present and WBGT= 101°F.
3.
Determine the clothing ensemble to be The candidate determines the worn during the work Worker Clothing ensemble to be OREX coveralls over Personal modesty garments.
PROMPT:
IF ASKED about clothing to be worn during the work activities, INFORM the candidate to refer to the Initial Conditions.
- 4*
Calculate AWBGT (per 6.2.3) by The candidate determines the incorporating Clothing Adjustment CAF to be +3°F.
Factor (CAF) obtained from Appendix A The candidate adds 101°F (WBGT) + 3°F (CAF) to obtain AWBGT = 104°F.
5.
Estimate Work Level category (See The candidate determines the definitions) work level is HEAVY (information was provided in Initial Conditions)
(*
- Indicates critical step)
2013-301 ADMIN-1 Page 5 of 7 STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 6.
Is AWBGT?: 89°F for Light Work The candidate selects YES Level, 84°F for Moderate Work (AWBGT 104°F with HEAVY Level, OR?: 82°F for Heavy Work?
work).
PROMPT:
IF ASKED about supervisors encouraging employees to report medical conditions, INFORM the candidate that supervisors have encouraged and provided an opportunity to employees to report any medical conditions they may have to Medical Representatives (Per 5.2)
AND Employees have identified to the Medical Representative any personal health problem or medication (prescription or over the counter being taken that may adversely affect their health in high temperature environments (Per 5.5) 7.
Is AWBGT?: 103°F?
The candidate selects YES (AWBGT 104°F)
Is AWBGT? 103°F but
< 108°F?
9.
Per 6.1.2.1, must use Engineering The candidate DETERMINES control and/or Administrative that Engineering control and/or controls.
Administrative controls are required to be used.
PROMPT:
WHEN ASKED about Engineering Controls or Admin Controls, INFORM the candidate that Admin Controls lAW step 6.3.1.2 are in place:
o Work is being done in the cool of the morning o Power tools are being used o Cool fluids available to drink etc.).
8.
The candidate selects YES (AWBGT 104°F)
- Indicates critical step)
2013-301 ADMIN-1 Page 6 of 7 I STEP PROMPT:
IF ASKED about calculating Recovery time, INFORM the candidate Recovery Time will be calculated at a later time.
SAT/UNSAT (COMMENTS)
END TIME:
NOTE:
The terminating cue shall be given to the Operator when:
After JPM step #12 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
We will stop here.
EVALUATOR PICK UP the Initiating Cue sheet.
PERFORMANCE STEP I
STANDARD PROMPT:
IF ASKED about Heat Stress PPE, INFORM the candidate Heat Stress PPE is NOT being used.
- 1O.
Estimate stay time per 6.3.1.5.
The candidate uses Appendix C to determine the maximum stay time of 15 minutes (accept +/- 5 minutes)
PROMPT:
IF Operator does NOT state if stay time is acceptable, ASK the Operator if the stay time is acceptable for this job.
11.
Is stay time acceptable?
The candidate determines that the Estimated Stay Time is NOT acceptable (28 minute job with a 15 minute stay time).
12.
Work job/task The candidate determines that the Calculate Recovery time per 6.3.2.1 task may NOT be worked.
(*
- Indicates critical step)
UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
You are a member of a team scheduled to perform work in the Unit 2 Steam Tunnel.
2.
The work will be in close proximity to Main Steam Lines which are pressurized with 700 psig steam.
3.
Steam Tunnel Temperature is 98°F.
4.
Steam Tunnel Humidity is 100%.
5.
Worker Clothing: OREX coveralls over Personal modesty garments.
6.
The work that is being performed is HEAVY WORK LEVEL.
7.
The work will take 28 minutes to complete.
INITIATING CUES:
Use NMP-FLS-002, Heat Stress and the information provided to determine BOTH:
The estimated Adjusted Wet Bulb Globe Temperature (AWBGT)
AND If the STAY TIME for the team members is acceptable to complete the work.
Page 7 of 7
Southern Nuclear E0 I, Hatch Nuclear Plant Operations Training JPM DRAFT ADMIN 2 ALL SOUTHERN A
COMPANY TITLE CONDUCT OF OPERATIONS, 34SV-SUV-019-2 SURVEILLANCE AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 ADMIN 2 15 Minutes RECOMMENDED BY APPROVED BY DATE N/R
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2013-301 ADMIN 2 Rev. No.
Date j
Reason for Revision Authors Supvs Initials Initials i
Initial development for use on ILT-8 NRC Exam.
ARB Once exam is complete will be renumbered for use in LOCT & ILT programs.
2013-301 ADMIN 2 Page 1 of 11 UNIT 1 (X)
UNIT 2 0
TASK TITLE:
CONDUCT OF OPERATIONS, 34SV-SUV-019-2 SURVEILLANCE JPM NUMBER:
2013-301 ADMIN 2 TASK STANDARD:
This task will be satisfactorily met when the student has completeted section 7.4 of 34SV-SUV-019-2, SURVEILLANCE CHECKS, and informed the evaluator that Unit 2 Torus Cooling is required to be placed in service.
TASK NUMBER:
OBJECTIVE NUMBER:
JTA IMPORTANCE RATING:
K/A CATALOG NUMBER: G2.1.7 RO 4.40 SRO 4.70 OPERATOR APPLICABILITY:
Reactor Operator (RO)
GENERAL
REFERENCES:
Unit 1 34SV-SUV-019-2
_REQUIRED MATERIALS:
Unit 1 34SV-SUV-019-2.
Calculators APPROXIMATE COMPLETION TIME:
15 Minutes SIMULATOR SETUP:
NOT applicable
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 2 is operating at 100 % power.
2.
2T48-N303A, Torus Temperature, is out of service and inoperable.
3.
2T48-N308A, Torus Temperature, is out of service and inoperable.
4.
2T48-R647, Torus Bulk Average Temperature, on 2141 l-P689 panel is indicating 95.0°F.
5.
The Shift Supervisor has directed this surveillance to be completed as a paper version.
INITIATING CUES:
Complete section 7.4 of 34SV-SUV-019-2, SURVEILLANCE CHECKS, which evaluates Torus temperatures, AND Determine & Inform the evaluator of Bullc Average Torus Temperature AND Any actions (if any) that needs to be taken as a result of Bulk Average Torus Temperature.
2013-301 ADMIN 2 Page 3 of 11 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN Human performance tools, safety, PPE met (1), AND U
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly FAIL U
Above standards not met ci Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.
Reference:
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
PROMPT:
GIVE the operator an entire copy of 34SV-SUV-019-2.
START TiME:
NOTE: When the operator addresses the need for Temperature recorders & SPDS readings provide Attachment 1.
1.
Performs step 7.4.1 of From the R6271R627 recorder 34SV-SUV-019-2.
provided, the operator lists the temperature readings on the surveillance sheet with NO errors for; 2T47-R626, Pt 1, 2T48-NOO9A 92.5°F Pt 2, 2T48-NOO9C 92.5°F 2T47-R627, Pt 1, 2T48-NOO9B 94°F Pt 2, 2T48-NOO9D 93°F
2013-301 ADMIN 2 Page 4 of 11 STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 2.
Performs step 7.4.2 of The operator evaluates the 34SV-SUV-019-2.
temperatures from step 7.4.1 and determines the temperatute difference to be <3°F AND enters a
- 3 Performs step 7.4.3 of The operator calculates the 34SV-SUV-019-2.
readings in step 7.4.1 and determines the NOO9A-D average temperature is 93.0°F.
4.
Performs step 7.4.4 of From the SPDS screen provided, 34SV-SUV-019-2.
the operator records N009 Average temperature reading of 94.0°F.
5.
Performs step 7.4.5 of The operator compares the 34SV-SUV-019-2.
average temperature reading in step 7.4.3 to the 7.4.4 SPDS N009 reading and concludes the temperatures do NOT differ by more than 2°F AND enters a OR a SAT per NOTE B.
6.
Performs step 7.4.6 of From the SPDS screen provided, 34SV-SUV-019-2.
the operator lists the temperature readings on the surveillance sheet with NO errors for; 2T48-N3O1A 98°F 2T48-N302A 98°F 2T48-N303A INOP 2T48-N304B 100°F 2T48-N305A 98°F 2T48-N306A 100°F 2T48-N307A 98°F 2T48-N308A INOP 2T48-N309A 98°F 2T48-N31OA 101°F 2T48-N31IA 101°F
2013-301 ADMIN 2 Page 5 of 11
[STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 1 7.
Performs step 7.4.7 of The operator evaluates the 34SV-SUV-019-2.
temperatures from step 7.4.6 &
step 7.4.3 and determines the temperatute difference to be
<10°F AND enters a V OR a SAT per NOTE B.
- 8.
Performs step 7.4.8 of The operator calculates the 34SV-SUV-019-2.
readings in step 7.4.6 and determines the N30 1 -N3 11 average is 99.1°F.
9.
Performs step 7.4.9 of From the 2T48-R647 recorder 34SV-SUV-019-2.
provided, the operator lists the 2T48-R647 Torus water temperature reading of 95°F.
NOTE:
The operator may determine 2T48-R647 recorder is inoperable and record Unsat, mop or may still record the temperature of 95.0°F and then notify the Shift Supervisor. (EITHER is acceptable) 10.
Performs step 7.4.10 of From the SPDS screen provided, 34SV-SUV-019-2.
the operator records SPDS Average Torus water temperature reading of 98°F.
11.
Performs step 7.4.11 of The operator evaluates the 345V-SUV-019-2.
temperatures from step 7.4.8 &
step 7.4.9 and determines the temperatute difference to be >2°F AND enters an UNSAT per NOTE B.
NOTE: The operator may inform the Shift Supervisor of the UNSAT item at this time or may continue with completing Section 7.4 and then notify the Shift Supervisor. (EITHER is acceptable)
- 12.
Performs step 7.4.12 of The operator calculates the Bulk 34SV-SUV-01 9-2.
Average Torus temperature using the bottom formula (since 2T48-R647 is mop) to be 96.05°F.
(Accept +/-1°F due to rounding errors)
2013-301 ADMIN 2 Page 6 of 11 TS1 PERFORMANCE STEP STANDARD (CO 4
J 4
JS)_J NOTE: If the operator uses the top formula (R647 operable) then Torus Bulk Average temperature will be calculated (INCORRECTLY) to be 94.0°F.
13.
Performs step 7.4.13 of The operator evaluates the 34SV-SUV-0 19-2.
temperature difference from steps 7.4.10 & 7.4.12 and determines it to be <2°F AND enters a V OR a SAT per NOTE B.
- 14.
Addresses any additional actions that The operator determines that are required as a result of the Torus 34AB-T23-003-2, TORUS Bulk average temperature reading.
TEMPERATURE ABOVE 95.0°F, IS procedurally required to entered.
NOTE: At this time, the operator may inform the Shift Supervisor (if NOT previously performed) of the following items:
1.
Step 7.4.9, 2T48-R647 is mop, (due to2T48-N303A & N308A mop
& out of service) 2.
Step 7.4.8 (average of N301 N3 11 temps) NOT within 2°F of step 7.4.9 (2T48-R647, Torus Bulk Avg Temp) 3.
Step 7.4.12, Torus Temp is above 95.0°F, entry into 34AB-T23-003-2, TORUS TEMPERATURE ABOVE 95.0°F, IS procedurally required.
END TIME:________
NOTE:
The terminating cue shall be given to the operator when:
When the operator completes step 14.
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
We will stop here.
SOUTHERN NUCLEAR PLANT E. I. HATCH DOCUMENT TITLE:
SURVEILLANCE CHECKS SPDS Torus Temperature Diagnostic 2T48-N301A 2T48-N302A 2T48-N303A 2T48-N304B 2T48-N305A 2T48-N306A 2T48-N307A 2T48-N308A 2T48-N309A 2T48-N3 10A 2T48-N31 1A Answer Key 98 98 mop 100 98 100 98 mop 98 101 101 SAT or V 98.0 DOCUMENT NUMBER:
34SV-SUV-O 19-2 PAGE 29 OF 78 NOTE:
IF any of the step 7.4 instruments are inoperable, refer to Attachment 2, Torus Temperature Monitoring.
VERSION NO:
37.5 OPER T/S OR 7.4 PANEL
- INSTRUMENT / TECH SPEC.
NOTE FREQ NIGHT DAY COND OPER LIM 7.4.1 2H1 1-P657
- 2T47-R626, Pt 1, Torus Water Temp 2T48-NOO9A
- 2T47-R626, Pt 2, Torus Water Temp 2T48-N009C
-P650
- 2T47-R627, Pt 1, Torus Water Temp 2T48-NOO9B
- 2T47-R627, Pt 2, Torus Water Temp 2T48-NOO9D (SR 3.6.2.1.1)
M U
V 1,2,3 C
95°F (T.S.
100°F) 742 Conflrmtemperaturesin7.4.1 within 3°F B
123 C
(SR 3.3.3.1.1 for 3.3.3.1-1(9.))
M 7.4.3 Calculate the average of operable points in 7.4.1.
M 1,2,3 C
7.4.4 2T48-N009 Average from SPDS M
1,2,3 C
7,4.5 Confirm temperature in 7.4.3 within 2°F of 7.4.4.
B,M 1,2,3 C
92.5 92.5 94.0 93.0 SAT or 93 94 SAT or V l6 M
V 1,2,3 C
747 Confirmtempemturesin7.4.6thin10°Fof7.4.3.
B,M,lI 1,2,3 C
(SR_3,3.3.1,1_for 3.3.3.1-1(9.))
7,4.8 Calculate the average of operable points in 7.4.6.
M 1,2,3 C
2H1 1-P689
- 2T48-R647, Torus Avg Bulk Temp M
1,2,3 C
All items in 7.4.6 (SR 3.6.2.1.1)
U must be operable 7,4.10 SPDS Average Torus Water Temperature M
1,2,3 C
At least nine of 7.4.6 must be operable 7.4,1 Confirm temperature in 7.4.8 within 2°F of 749 2T48-R647 must (SR3,3.3.1.lfor3.3.3.1-1(9.))
B,M 1,2,3 C
bewithin2°Ftobe operable Calculate the Torus bulk average temperature 7.4.3 & 7.4.9 2
M 1,2,3 C
95°F 7,4,12 QE 7,4.3 & 7.4.8 if 2T48-R647 is inoperable (T.S, S 100°F) 2 (SR_3.6.2.1.1) 7.4.13 Confirm temperature in 7.4.12 within 2°F of 7.4.10.
B,M 1,2,3 C
I Initials Calculations verified Time
OPERATOR COPY UNIT 2 READ AND GIVE A COPY TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 2 is operating at 100 % power.
2.
2T48-N303A, Torus Temperature, is out of service and inoperable.
3.
2T48N308A, Torus Temperature, is out of service and inoperable.
4.
2T48-R647, Torus Bulk Average Temperature, on 2H1 1-P689 panel is indicating 95.0°F.
5.
The Shift Supervisor has directed this surveillance to be completed as a paper version.
INITIATING CUES:
Complete section 7.4 of 34SV-SUV-019-2, SURVEILLANCE CHECKS, which evaluates Torus temperatures, AND Determine & Inform the evaluator of Bulk Average Torus Temperature AND Any actions (if any) that needs to be taken as a result of Bulk Average Torus Temperature.
fl n
Aft.
Aenti 1
Jnit7 SPDS
Fm Attachu I (Cont.)
n 92.5 TORUS AIR TEMP I
n Fm Attachr I (Cont.)
7Tâ7 fl 94.0 93.0
- 4. TORUS AIR 93.2 0.0
.*CL.G 10 AMO VESSEt ji:
CVTY AT 900 183.2 112.1 112.2 183.1 110.2 I
112.5
- 4. AMBIENT OW SHIELD QAVITY 164.9 134.9
Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT ADMIN 3 SRO4 & SRO-U TITLE Review a Required Action Sheet (RAS) for an inoperable Tech Spec component AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 ADMIN 3 30.0 Minutes RECOMMENDED BY APPROVED BY DATE SOUTHERNA COMPANY
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2013-301 ADMIN 3 Authors Supvs Rev. No.
1 Date
[
Reason for Revision Initials Initials 00 Initial development for ILT-8 NRC Exam. After NRC exam is complete, this JPM will be incorporated into the ILT program with a new Media Number.
2013-301 ADMIN 3 Page lofl7 UNIT1
()
UNIT2 (X)
TASK TITLE:
Review a Required Action Sheet (RAS) for an inoperable Tech Spec component JPM NUMBER:
2013-301 ADMIN 3 TASK STANDARD:
The task shall be completed when the operator has completed review of the highlighted Sections 1 thru 4 of Required Action Sheet, Form 1349; identified the incorrect items and any recommendations for the incorrect items.
TASK NUMBER:
OPSR300.027 OBJECTIVE NUMBER:
H-0P300.027A PLANT HATCH JTA IMPORTANCE RATING:
RO N/A SRO N/A K/A CATALOG NUMBER: G 2.2.23 K/A CATALOG JTA IMPORTANCE RATING:
RO NA SRO 4.6 OPERATOR APPLICABILITY:
Senior Reactor Operator (SRO)
GENERAL
REFERENCES:
Unit 2 3 1GO-OPS-006, Conditions, Required Actions and Completion Times OPS-1349 TECH SPECS UNIT 1 REQUIRED MATERIALS:
Unit 2 UNiT 1 TECH SPECS A completed form OPS-1349 3 1GO-OPS-006-0 Conditions, Required Actions and Completion Times mop Status Indicator Picture 2013 Calendar APPROXIMATE COMPLETION TIME:
30.0 Minutes SIMULATOR SETUP:
NOT Applicable
EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 1 is operating at 100% power.
2.
At 0600 on 8/1/13, Plant Service Water (PSW) pump 1B, 1P41-COO1B, is declared inoperable due to failing 34SV-P41001-1.
3.
Required Action Sheet form, OPS-1349, has been prepared and is ready for review.
4.
All other equipment is operable.
5.
Albert R. Bradford is the Shift Supervisor 6.
Protected Equipment signs have been posted lAW NMP-.OS-010, Protected Train/Division and Protected Equipment Program INITIATING CUES:
Verify the correctness of ONLY the HIGHLIGHTED portions of Sections 1 thru 4 of Required Action Sheet, form OPS-1349, for Unit 1 1P41-COO1B, PSW pump lB.
AND Inform the Shift Supervisor of your results and any recommendations
2013-301 ADMIN 3 Page 3 of 17 SAT/UNSAT (COMMENTS)
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:________
PROMPT:
PROVIDE the following to the operator:, Attached OPS-1349 Form 31G0-OPS-006-O, Conditions, Required Actions, And Completion Times
- , Calendar 1.
Operator obtains the procedure needed Operator has obtained 31G0-SAT / UNSAT to perform the task.
OPS-006-0, Conditions, Required I
Actions, And Completion Times J________________________________ & Unit 1 Tech Specs.
PROMPT:
WHEN the Operator indicates looking in the Required Action Tracking Log to confirm the RAS number, INFORM that the RAS number has been confirmed.
2.
Evaluates whether RAS number from The operator determines that RAS SAT / UNSAT the Required Action Tracking Log, is
- 1-13-067 is CORRECTLY correct.
written for step 7.1.1.1.
STEP PERFORMANCE STEP i
STANDARD I
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL
(** Indicates critical step)
2013-301 ADMIN 3 Page 4 of 17 STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 1 3.
Locates the appropriate Tech Spec Addresses Unit 1 Tech Spec SAT / UNSAT section.
section 3.7.2 Action A.
1P41-COO1B is CORRECTLY written for step 7.1.1.2.
5.
Evaluates RAS form section 1 The operator determines that the SAT / UNSAT Description block.
Description block is CORRECTLY written for step 7.1.1.2.
- 6.
Evaluates RAS form section 1 The operator determines the SAT / UNSAT Inoperable time/date block Inoperable Time/Date block is CORRECTLY written for step 7.1.1.3.
7.
Evaluates the RAS section 1 Return The operator detennines the SAT / UNSAT to Oper Time/Date block.
Return to Oper Time/Date block is CORRECTLY written and is left blank. (Blank) 8.
Evaluates the RAS section 1 mit The operator determines the SAT I UNSAT block.
mit block is CORRECTLY written and is left blank. (Blank)
Evaluates the RAS section 2 The operator determines the SAT / UNSAT Initiation Time/Date block.
Initiation Time/Date block of section 2 is CORRECTLY written for step 7.1.1.6. (0600 &
8/01/13)
(** Indicates critical step)
2013-301 ADMIN 3 Page 5 of 17 I
SAT!UNSAT 7 STEP I
PERFORMANCE STEP STANDARD I
(COMMENTS)
I I
- 10.
Evaluates the RAS section 2 Req The operator determines the Req SAT I UNSAT Restoration Time/Date block.
Restoration block is NOT CORRECTLY written for step 7.1.1.7.
The operator is expected to recommend to the SS the Req Restoration block should be 0600 & 8/31/13.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that the Req Restoration block is NOT CORRECTLY written. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the Shift Supervisors attention.
PROMPT:
IF the operator addresses the incorrect item(s), DIRECT the operator to finish the review.
11.
Evaluates the RAS section 2 The operator determines the SAT / UNSAT Modified Completion Time/Date.
Modified Completion block is CORRECTLY written for step 7.1.1.8. (N/A or Blank is acceptable) 12.
Evaluates the RAS section 2 The operator determines the SAT I UNSAT Extended Completion Extended Completion Time/Date/mit block.
Time/Date/mit block in section 2 is CORRECTLY written for step 7.1.1.8. (N/A or Blank is acceptable) 13.
Evaluates the RAS section 2 SFDP The operator determines the SAT I UNSAT Entered block.
SFDP Entered block in section 2 is CORRECTLY written for step 7.1.1.9. (N/A)
- Indicates critical step)
2013-301 ADMIN 3 Page 6 of 17 I STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
NOTE: If operator asks to see the Status Indication, hand the operator a picture of the status indicators (Attachment 3).
14.
Evaluates the RAS section 2 INOP The operator determines the SAT I UNSAT Status Indication block.
INOP Status Indication Lit Block is CORRECTLY written for step 7.1.1.10. (Light On)
PROMPT:
IF asked the status of protected equipment per NMP-OS-010, INFORM the operator the required signs have been posted for protected equipment.
Applicability block of section 2 is CORRECTLY written for step
- 7. 1.1.12. (Modes 1,2, and 3) 16.
Evaluates the RAS section 2 The operator determines the SAT I UNSAT Reference Document block.
Reference Document block of section 2 is CORRECTLY written for step 7.1.1.13. (Ui TS 3.7..2.A or similar wording 17.
Evaluates the RAS section 2 The operator determines the SAT / UNSAT Revision/Amendment block.
Revision/Amendment block of section 2 is CORRECThY written for step 7.1.1.14. (246)
- 18.
Evaluates the RAS section 2, The operator determines the SAT I UNSAT Required Action If block.
Required Action If block of section 2 is NOT CORRECTLY written for step 7.1.1.15.
The operator is expected to recommend to the SS the Required Action If block should be BE IN MODE 3 IN 12 fIRS AND BE IN MODE 4 IN 36 HOURS).
(*
- Indicates critical step)
2013-301 ADMIN 3 Page 7 of 17 I STEP PERFORMANCE STEP STANDARD (IFS)
NOTE: At this time, the operator may elect to inform the Shift Supervisor that the Required Action If block is NOT CORRECTLY written. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the Shift Supervisors attention.
PROMPT:
IF the operator addresses the incorrect item(s), DIRECT the operator to finish the review.
19.
Evaluates the RAS section 3 1 The operator determines the 1 Hour Actions block.
Hour Actions block in section 3 is CORRECTLY written for step 7.1.2. (N/A)
- *20.
Evaluates the RAS section 4, FIRST The operator determines the line for the Reference Document FIRST line for theReference block.
Document block in section 4 is NOT CORRECTLY written for step 7.1.3.1.
The operator is expected to recommend to the SS the Reference Document block should be TS 3.7.2.A.1 or similar wording.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that the FIRST line for the Reference Document block is NOT CORRECTLY written. This action IS acceptable.
ft IS also acceptable for the operator to complete the review before bringing this to the Shift Supervisors attention.
PROMPT:
IF the operator addresses the incorrect item(s), DIRECT the operator to finish the review.
(** Indicates critical step)
2013-301 ADMIN 3 Page 8 of 17 STEP
(
PERFORMANCE STEP STANDARD I
(COMMENTS) 1 21.
Evaluates the RAS section 4, FIRST The operator determines the SAT I UNSAT line for the Required Action block.
FIRST line for the Required Action block in section 4 is CORRECTLY written for step 7.1.3.2. (Restore PSW pump to OPERABLE status) 22.
Evaluates the RAS section 4, FIRST The operator determines the SAT I UNSAT line for the Req Comp Time of Freq FIRST line for the Req Comp block.
Time of Freq block in section 4 is CORRECTLY written per step 7.1.3.3. (30 days) 23.
Evaluates the RAS section 4, FIRST The operator determines the SAT / UNSAT line for the Seq No. block.
FIRST line for the Seq No.block in section 4 is CORRECTLY written per step 7.1.3.3. (N/A or Blank) 24.
Evaluates the RAS section 4, The operator determines the SAT / UNSAT SECOND line for the Reference SECOND line for the Reference Document block.
Document block in section 4 is CORRECTLY written for step 7.1.3.1. (TS 3.7.2.F.1) 25.
Evaluates the RAS section 4, The operator determines the SAT / UNSAT SECOND line for the Required SECOND line for the Required Action block.
Action block in section 4 is CORRECTLY written for step 7.1.3.2. (BE IN MODE 3)
- 26.
Evaluates the RAS section 4, The operator determines the SAT / UNSAT SECOND line for the Req Comp SECOND line for the Req Comp Time of Freq block.
Time of Freq block in section 4 is NOT CORRECTLY written per step 7.1.3.3.
The operator is expected to recommend to the SS the SECOND line for theReq Comp Time of Freq block should be 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(** Indicates critical step)
2013-301 ADMIN 3 Page 9 of 17 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
NOTE: At this time, the operator may elect to inform the Shift Supervisor that the Req Comp Time of Freq block is NOT CORRECTLY written. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the Shift Supervisors attention.
PROMPT:
IF the operator addresses the incorrect item(s), DIRECT the operator to finish the review.
27.
Evaluates the RAS section 4, The operator determines the SAT I UNSAT SECOND line for the Seq No.
SECOND line for the Seq block.
No.block in section 4 is CORRECT per step 7.1.3.3.
(N/A or Blank) 28.
Evaluates the RAS section 4, The operator determines the SECOND line, Logical Connector, for Logical Connector, for the the Required Action block.
Required Action block in section 4 is CORRECTLY written per step 7.1.3.5. (AND).
- 29.
Evaluates the RAS section 4, THIRD The operator determines the SAT I UNSAT line for the Reference Document THIRD line for the Reference block.
Document block in section 4 is NOT CORRECTLY written for step 7.1.3.1.
The operator is expected to recommend to the SS the THIRD line for the Reference Document block should be TS 3.7.2.F.2.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that the THIRD line for the Reference Document block is NOT CORRECTLY written. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the Shift Supervisors attention.
PROMPT:
IF the operator addresses the incorrect item(s), DIRECT the operator to finish the review.
- Indicates critical step)
2013-301 ADMIN 3 Page 10 of 17 STEP j PERFORMANCE STEP STNDARD I
(COMMENTS) 30.
Evaluates the RAS section 4, THIRD The operator determines the SAT / UNSAT line for the Required Action block.
Required Action block in section 4 is CORRECTLY written for step 7.1.3.2.
(Be in MODE 4) 31.
Evaluates the RAS section 4, THIRD The operator determines the Req SAT / UNSAT line for the Req Comp Time of Freq Comp Time of Freq block in block.
section 4 is CORRECTLY per step 7.1.3.3. (36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />)
NOTE: At this time, the operator may inform the Shift Supervisor (if NOT previously performed) that the following items are incorrect:
1.
Required Restoration Time/Date of Section 2 (should be 0600 / 08-31-13) 2.
Required Action IF Comp Time Exceeded of Section 2 (should be be in Mode 3 in 12 hrs and be in Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />) 3.
FIRST line for the Reference Document of Section 4 (should be TS 3.7.2.A.1) 4.
SECOND line for the Req Comp Time of Freq of Section 4 (should be 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) 5.
THIRD line for the Reference Document block should be (TS 3.7.2.F.2)
NOTE:
The terminating cue shall be given to the Operator when:
When the operator completes step 31.
END TIME:________
With NO reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
That completes this JPM.
(*
- Indicates critical step)
ATTACHMENT 1 SOUTHERN NUCI PLANT El. HATC FORM TITLE:
REQUIRED ACTION SHEET NUMBER 1
13 067 PAGE 1 0F2 SECTION 1 INITIATING CONDITIONS SS SIGN / TSA TERMINATED SM SIGN
- KEY **
DO NOT give this to operator MPL ESCRI ION INOPERABLE RETURNTOOPER I
D PT TIME/DATE TIME/DATE NIT 1P41COO1B 1B PSW Pump INOP 0600 08/01/13 Failed 34SV-P41-001-1 due to low discharge pressure SECTION 2 REQUIRED ACTION SHEET ACTIVATION INITIATION TIME/DATE:
REQ. RESTORATION MODIFIED COMPLETION TIME/DATE:
TIME/DATE:
0600 I 08-01-13 0600 I 08-31-13 N/A or Blank EXTENDED SFDP ENTERED INOP STATUS INDIC PROTECTED EQUIP COMPLETION LIT POSTED TIME/DATE/INIT EIYES EN/A EYES LJ N/A EYES EN/A N/A or Blank
(
LICABILITY MODES 1,2, and 3 REQ. ACTION IF COMP TIME BE IN MODE 3 IN 12 HRS AND BE IN MODE 4 IN 36 HOURS EXCEEDED REFERENCE 2 A REVISION/AMENDMENT DOCUMENT T.S.
246 SS SIGN / TSA ACTIVE SM SIGN SECTION 5 REQUIRED ACTION SHEET TERMINATION INDICATE COMPLETE(D) ACTIONS:
11 PROCEDURES:
OTHER:
MWO FT INOP STATUS INDIC EQUIP POSTINGS REQUIRED ACTION COMPLETE OFF REMOVED TERMINATED EIYES EN/A TIME/DATE:
EYES EN/A EYES EN/A i
OPS-1349 Ver 3.0 Gi 6.030 31 GO-OPS-006-0
SOUTHERN NUCLI PLANT E.I. HATCI FORM TITLE:
ATTACHMENT 1
- KEY **
DO NOT give this to operator SECTION 3 PAGE 2 OF 2 1 HOUR ACTIONS I
REFERENCE PERFORMED REQUIRED ACTION REQ. COMP TIME INIT DOCUMENT TIME/DATE N/A N/A N/A N/A N/A I
I SECTION 4
>1 HOUR ACTIONS REFERENCE REQ. COMP TIME SEQ.
COMPLETE COMP.
REQUIRED ACTION DOCUMENT OR FREQ.
NO.
TIME/DATE INITIAL Restore PSW pump to OPERABLE status N/A
- ADMIN CONTROL APC #
RAS LOCKED OR DOCUMENT FOR TAGOUT #
LI REFERENCED ON SIGNED ON REQUIRED ACTION REPTASK#
LI ADMIN CONTROL AS HOLDER OR COMP ACTIONS OTHER LI DOCUMENT FOR eSOMS if FOR IDOs if required REQU RED ACTION TRACKING required SHEET, OPS-1350, LI INIT INIT OPS-1349 Ver 3.0 G16.030 31 GO-OPS-006-0
SOUTHERN NUCLEAR PLANT E.I. HATCH ATTACHMENT 2 PROVIDE TO OPERATOR PAGE 1 0F2 FORM TITLE:
REQUIRED ACTION SHEET REQUIRED ACTION SHEET NUMBER 1
13 067 SECTION 1 INITIATING CONDITIONS SS SIGN/TSA TERMINATED SM SIGN INOPERABLE RETURN TO OPER MPL DESCRIPTION TIME/DATE TIME/DATE NIT 1P41COO1B 1B PSW Pump INOP 0600 08101/13 Failed 34SV-P41-001-1 due to low discharge pressure SECTION 2 REQUIRED ACTION SHEET ACTIVATION INITIATION TIME/DATE:
REQ. RESTORATION MODIFIED COMPLETION TIME/DATE:
TIME/DATE:
0600 I 08-01-13 0600 / 08-30-13 N/A EXTENDED SFDP ENTERED INOP STATUS INDIC LIT PROTECTED EQUIP POSTED COMPLETION TIME/DATE/INIT EJYES NIA EYES EJ N/A EYES SIN/A N/A
\\PPLICABILITY MODES 1,2, and 3 REQ. ACTION IF COMP TIME RESTORE PSW PUMP TO OPERABLE STATUS IN 30 DAYS EXCEEDED REFERENCE T S 72 A REVISION/AMENDMENT DOCUMENT 246 SS SIGN / TSA ACTIVE SM SIGN SECTION 5 REQUIRED ACTION SHEET TERMINATION INDICATE COMPLETE(D) ACTIONS:
EEl PROCEDURES:
OTHER:
MWO FT INOP STATUS INDIC EQUIP POSTINGS REQUIRED ACTION COMPLETE OFF REMOVED TERMINATED EJYES EEIN/A TIME/DATE:
)ElYES IEIN/A IElYES IElN/A i
OPS-1349 Ver 3.0 Gi 6.030 31 GO-OPS-006-0
ATTACHMENT 2 PROVIDE TO OPERATOR REQUIRED ACTION SHEET I
SOUTHERN NUCLEAR PLANT E.l. HATCH FORM TITLE:
PAGE 2 OF 2 SECTION 3 1 HOUR ACTIONS REFERENCE PERFORMED REQUIRED ACTION REQ. COMP TIME INIT DOCUMENT TIME/DATE N/A N/A N/A N/A N/A I
I SECTION 4
>1 HOUR ACTIONS REFERENCE REQ. COMP TIME SEQ.
COMPLETE COMP.
DOCUMENT RL...QUIRL.LI OR FREQ.
NO.
TIME/DATE INITIAL
,., 7, Q.
Restore PSW pump to
/
I
&I.
I OPERABLE status 1
ays I
I I
TS 3.7.2.F.1 Be in MODE 3 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> N/A I
AND I
I I
Be in MODE 4 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> N/A I
I I
/
I I
(
/
I I
I
/*y I
I I
- ADMIN CONTROL APC #
RAS LOCKED OR DOCUMENT FOR TAGOUT #
LI REFERENCED ON SIGNED ON REQUIRED ACTION REP TASK #
LI ADMIN CONTROL AS HOLDER OR COMP ACTIONS OTHER LI DOCUMENT FOR eSOMS if FOR IDOs if required REQURED ACTION TRACKING required SHEET, OPS-1350, LI INIT INIT OPS-1349 Ver 3.0 Gi 6.030 31 GO-OPS-006-0
ATT MENT 3 PROVIDE - J OPERATOR CORE SPRAY HYDROGEN CONTROL CORE SPRAY II MAIN STEAM LINE SEAL PLANT SERV WATER DIVISION I STBY GAS TREATMENT HPCI PLANT SERY WATER DIVISION II RCIC STBY GAS TREATMENT II AUTOMATIC DEPRESSURE DIESEL GEN lB DIESEL GEN IC fl fl RHR RHR II DIESEL GEN IA
N)
..h IT]
C
C H
Cc.
N)
N)
(QN)Cii (z
C)
N)
(0 N)
C.)
N)
I *;
N)
CD N) or:I C
(.1)
N)
-)
-- 4 J c U.
N)
(Or\\)
Ii LA4)
-J c C..*.)
N)
Co
_*%j C
(QN)Cii Cl)
_-.J I__l._)
C N)
N)
-H (ON)
Cii CO C.k)N)
D cr N)_h._..
OPERATOR COPY UNIT 1 READ ANT) GIVE A COPY TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 1 is operating at 100% power.
2.
At 0600 on 8/1/13, Plant Service Water (PSW) pump lB is declared inoperable due to failing 34SV-P4 1-001-1.
3.
Required Action Sheet form, OPS-1349, has been prepared and is ready for review.
4.
All other equipment is operable.
5.
Albert R. Bradford is the Shift Supervisor 6.
Protected Equipment signs have been posted JAW NMP-OS-010, Protected Train/Division and Protected Equipment Program INITIATING CUES:
Verify the correctness of ONLY the HIGHLIGHTED portions of Sections 1 thru 4 of Required Action Sheet, form OPS-1349, for Unit 1 1P41-COO1B, PSW pump lB.
AND Inform the Shift Supervisor of your results and any recommendations.
Southern Nuclear E, I. Hatch Nuclear Plant Operations Training JPM DRAFT ADMIN 4 RO ONLY SOUTHERN COMPANY TITLE DETERMINE THE EVACUATION ROUTE DURING AN EMERGENCY AUTHOR MEDIA NUMBER TIME R. A. BELCHER 2013-301 ADMIN 4 N/R RECOMMENDED BY APPROVED BY DATE 9.0 Minutes
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2013-301 ADMIN 4 Rev Authors Sunvs Date Reason for Revision No.
Initials Initials 00 Revised JPM LR-JP-20059 to match procedure, renamed ARB for ILT-8 NRC Exam. Modified wind direction to change evacuation route. After exam will be renumbered and placed_into_the_LOCT/ILT_database.
2013-301 ADMIN 4 Page 1 of 9 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
DETERMINE THE EVACUATION ROUTE DURING AN EMERGENCY JPM NUMBER:
2013-301 ADMIN 4 TASK STANDARD:
The task shall be completed when the wind direction has been checked and an evacuation route has been determined per 73EP-EIP-005-0 & TRN-0144.
TASK NUMBER:
200.059 OBJECTIVE NUMBER:
200.059.A PLANT HATCH JTA IMPORTANCE RATING:
RO 3.86 SRO 3.96 K/A CATALOG NUMBER: 295038EA 102 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.00 SRO 3.80 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO)
GENERAL REFERENCES Unit 1 & 2 73EP-ETP-005-0 (current version)
NMP-EP-1 10 (current version)
NMP-EP-110-GLO2 (current version)
NMP-EP-l 11 (current version)
NMP-EP-1 11-002 (current version)
REQUIRED MATERIALS:
Unit 1 & 2 NMP-EP-1 11 (current version)
NMP-EP-1 11-002 (current version)
APPROXIMATE COMPLETION TIME:
9.0 Minutes SIMULATOR SETUP:
N/A
UNIT1&2 READ TO THE APPLICANT INITIAL CONDITIONS:
1.
A Reactor scram has occurred.
2.
Plant conditions have resulted in an Elevated Radioactive release.
3.
A Prompt Off-Site Dose Assessment calculation has been performed and an Offsite Release has been verified to be in progress.
4.
Peak calculated TEDE is 100 mRemlhr.
5.
The Emergency Director (ED) has declared a Site Area Emergency.
6.
The ED has directed a PA announcement to be performed in accordance with NMP-EP-111.
7.
SPDS is available.
INITIATING CUES:
Your task is to fill out the appropriate form required to make the PA announcement for this emergency JAW NMP-EP-1 11-002, EMERGENCY NOTIFICATION NETWORK COMMUNICATOR INSTRUCTIONS - HATCH.
NOTE: Another operator will make the actual page announcement JAW NMP-EP-1 11 Checklist 1 Page Announcements.
2013-301 ADMIN 4 Page 3 of 9 I STEP PERFORMANCE STEP STANDARD I
(COMMENTS)l For INITIAL Operator Programs:
For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN U
Human performance tools, safety, PPE met (1), AND U
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly FAIL U
Above standards not met U
Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:________
NOTE: The applicant may review NMP-EP-1 11 Checklist 1 Page Announcements.
PROMPT:
AT THIS TIME PROVIDE the applicant with the following:
o NMP-EP-1 11-002, EMERGENCY NOTIFICATION NETWORK COMMUNICATOR INSTRUCTIONS
- HATCH.
AND o Also PROVIDE the attached SPDS Attachments.
1.
Select correct section of The applicant uses NMP-EP-111-NMP-EP-1 11-002.
002, Table of Contents and determines that Instruction 5 Emergency Page Announcement Selection Guidance is the required section.
(*
- Indicates critical step)
2013-301 ADMIN 4 Page 4 of 9 STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 1
- 2.
Select the correct form to use for a The applicant uses NMP-EP-1 11-Site-Area Emergency announcement.
002, Instruction 5 to determine that IV. Standard Announcement For Notification Of Site-Area Or General Emergency (see page
- 14) is the required form NOTE: The applicant may review the NOTES at the top of NMP-EP-1 11-002, IV. Standard Announcement For Notification Of SAE Or GE 3.
IV. a. Refer to Selection Guidance The applicant determines that information on page 11 to determine wind direction is required in order the applicable rally point, exit route to select the correct evacuation and evacuation route. Record the route.
applicable information.
NOTE: Only one indication must be checked to satisfactorily complete Step 4.
PROMPT:
IF the Applicant addresses wind direction at panel 1H1 1-P689, Y33-S/ZR R604 (WIND SPEED/DIRECTION 23 METER ELEVATION),
INDICATE for the Applicant that this recorder is INOPERABLE.
- 4 Check wind direction.
At panel 1H1 1-P690, wind direction checked on one of the following:
SPDS MIDAS screen OR SPDS MET Data screen
(** Indicates critical step)
2013-301 ADMIN 4 Page 5 of 9 I STEP PERFORMANCE STEP STANDARD I
(COMMENTS) 1 Determine the applicable rally point, The applicant uses Selection exit route and evacuation route.
Guidance information on page Record the applicable information.
11 to determine:
Rally point: PESB Exit Route: Main Access Road Evacuation Route:
U.S. Highway 1
- South to Appling Co. High School! Baxley The applicant then RECORDS the information in appropriate section of IV. Standard Announcement For Notification Of Site-Area Or General Emergency.
NOTE: If the operator uses the 10 Meter wind direction, the evacuation route will (INCORRECTLY) state Either direction on U.S. Highway 1 to Toombs Co. High School!Lyons or Appling Co. High SchoollBaxley.
NOTE: The applicant may select DRILL for item 1. This is ACCEPTABLE practice for the purpose of training evaluations at Hatch.
PROMPT:
IF the Applicant addresses contacting Security to activate the PA system in the Simulator and Skills Buildings INFORM the Applicant that Security has been directed to activate the PA system in the Simulator and Skills Buildings PROMPT:
IF the Applicant addresses NMP-EP-1 11 Checklist 1 Page Announcements, as the Shift Supervisor, INFORM the Applicant that this will performed by another Operator.
END TIME:________
NOTE:
The terminating cue shall be given to the Applicant when:
When the operator completes step 5.
With no reasonable progress, the Applicant exceeds double the allotted time.
Applicant states the task is complete.
TERMINATING CUE:
We will stop here.
(*
- Indicates critical step)
EVALUATOR ANSWER KEY IV.
STANDARD ANNOUNCEMENT INSTRUCTIONS FOR SITE-AREA OR GENERAL EMERGENCY NOTES:
The appropriate emergency tone and announcement must be made as soon as possible, but not to exceed 15 minutes after the initial emergency declaration The person making this announcement is expected to announce all applicable information.
a.
Refer to Selection Guidance information on page 11 to determine the applicable rally point, exit route and evacuation route.
Record the applicable information below needed for this announcement.
b.
Contact Security to direct activation of the Public Address system in the Simulator and Skills Buildings PRIOR to beginning the announcement.
c.
Perform JAW NMP-EP-1 11 Checklist 1 Page Announcements.
(Select one) I1 Site-Area Emergency or D General Emergency
- 1. ATTENTION ALL PERSONNEL. THIS (E]IS / D IS NOT) A DRILL. A/AN Site-Area Emergency HAS BEEN DECLARED.
2.
(Select one): A RADIOLOGICAL RELEASE (I1IS / D IS[) IN PROGRESS.
- 3. ALL EMERGENCY RESPONSE PERSONNEL ARE TO REPORT TO YOUR EMERGENCY RESPONSE FACILITY AND IMTIATE EMERGENCY IMPLEMENTING PROCEDURES.
NOTE:
Announcement of items 4 or 5 may be discontinued upon verification that non essential personnel have left the plant site 4.
Use if a radiological release is not in progress ALL NON-ESSENTIAL PERSONNEL ARE TO EXIT THE PLANT SITE USING THE MAIN ACCESS ROAD. THE EVACUATION ROUTE IS EITHER DIRECTION ON U. S.
HIGHWAY 1.
5.
Use if a radiological release j in progress ALL NON-ESSENTIAL PERSONNEL ARE TO EXIT THE PLANT SITE USING (select one):
I1THE MAIN ACCESS ROAD, D THE ROAD BEHIND THE LOW LEVEL RADWASTE BUILDING, D OTHER (specify another exit route)
AND THE EVACUATION ROUTE IS (Select one):
IE EITHER DIRECTION ON U.S. HIGHWAY 1. REPORT TO THE STATE RECEPTION CENTER AT EITHER TOOMBS CO. HIGH SCHOOL IN LYONS OR APPLING CO. HIGH SCHOOL IN BAXLEY.
D SOUTH ON U. S. HIGHWAY 1. REPORT TO THE STATE RECEPTION CENTER AT APPLING CO. HIGH SCHOOL IN BAXLEY.
D NORTH ON U. S. HIGHWAY 1. REPORT TO THE STATE RECEPTION CENTER AT TOOMES CO. HIGH SCHOOL IN LYONS.
Page 6 of 9
EVALUATOR ANSWER KEY SELECTION GUIDANCE FOR STANDARD ANNOUNCEMENT RALLY POINT/SITE EXIT ROUTE/ EVACUATION ROUTE Is a radiological release in progress?
Yes D No a.
A radiological release Is Not in progress:
THEN
- b. The following rally point, site exit route, and evacuation route will be used:
Rally Point Plant Entry & Security Building (PESB)
Site Exit Route Main Access Road Evacuation Route Either direction on U. S. Hwy 1.
IF c.
A radiological release in progress:
THEN Use the chart below to determine the rally point, site exit route, evacuation route and State Reception Center, based on wind direction.
Consult with Security to determine alternative(s) j designated rally point and/or site exit route cannot be used. The use of an alternate rally point requires notifying Security and HP prior to making the announcement.
NOTE:
The 15 minute average wind direction information should be read using the meteorological instrumentation that corresponds to the primary release point.
Wind Site Exit Route:
Direction Rally Point:
Evacuation Route/State Reception From:
Center 340°
- 60° Gate 17 Main Access Road U.S. Highway 1
- North to Toombs Co. High School/Lyons 61°
- 1100 PESB Road behind Low U.S. Highway 1
- South to Appling Level Radwaste Co. High School! Baxley Building 1110 - 225° PESB Main Access Road U.S. Highway 1
- South to Appling Co. High School! Baxley 226° - 3390 PESB Main Access Road Either direction on U.S. Highway 1 to Toombs Co. High School/Lyons or Appling Co. High School/Baxley Page 7 of 9
MIDAS iNFORMATION METEOROLOGICAL 1CM WIND SPD lOOM WIND SPD 1 OM WIND DIR 10CM WIND DIR 1Y33-R601 1Y33R603 1Y33R6O1 1Y33-R603 5.0 4.0 190 250 AMBIENT TEMP DELTA T DELTA T RAINFALL (F)1OM 60-10 100-10 15M1N.AVG 55
-0.5
-1.0
.000 RADIOLOGICAL MAIN STACK Ui RX. BLDG. VENT U2 RX, BLDG VENT NORMAL RANGE KAMAN NORMAL RANGE KAMAN NORMAL RANGE KAMAN 1D11-KoocA 1[11-R631 1D11-KO19A JD11-R631 2D11-K636A 2D11-R631 2.OOE 01 5O2E-03 6.70E 01 5.04E-03 1 02E 06 5O0E-02 1D11-K600B 1DI1-K619B 2D11-K636B 1.96E01
&67E01 1.04E06 STABILITh CLASS D
METEROLOGICAL DATA TEMPERATURE 15-MIN AVERAGE 10 M ELEVATION AMBIENT 10 M ELEVATION AMBIENT
- BACKUP 10 M DEWPOINT 60M-IOM DELTATEMP.
100 M-1OM DELTATEMP.
45 M
- 10 M DELTA TEMP.
- BACKUP
-30 DEG F 74DEG F 73DEG F
-10 DEG F
-10 DEG F 1.5 DEGF (DIRECTION 15-MIN.
15-MIN.
WIND FROM)
AVERAGE STD-DEV SPEED AVERAGE 10 MELEVATION 19ODEG 189DEG 12DEG 1MPH 0MPH 60 M ELEVATION 230 DEG 220 DEG 6 DEG 2 MPH 2 MPH 100 M ELEVATION 250 DEG 248 DEG 4 DEG 4 MPH 4 MPH 23 M ELEVATION
- BACKUP 250 DEG 252 DEG 4 DEG 2 MPH 2 MPH FLOW*
FLOW FLOW FLOW FLOW
-4.1 DEG F
-2.4DEG F 2.4 DEG F PERCI PITATION
.00 INCHES SINCE MIDNIGHT
Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT Admin 5-ALL TITLE EVALUATE AN RWP AND SURVEY MAP AUTHOR MEDIA NUMBER TIME R. A. BELCHER 2013-301 ADMIN 5 10.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2013-301 ADMIN 5 Rev. No.
Date Reason for Revision Authors Supvs Initials Initials 00 Modified 2009-302 NRC Exam & renumbered for ARB ILT-8 NRC Exam. After exam will be renumbered and placed into the LOCT & ILT bank.
2013-301 ADMIN 5 Page 1 of 5 UNIT1
()
UNIT2 (x)
TASK TITLE:
Comply with radiation work permit requirements during normal or abnormal conditions.
JPM NUMBER:
2013-301 ADMIN 5 TASK STANDARD:
The task shall be completed when the operator has determined:
the correct survey map, Maximum stay time before dosimetry alarm occurs, and the actions if an alarm occurs on dose accumulated.
TASK NUMBER:
N/A OBJECTIVE NUMBER:
N/A TYPE N/A PLANT HATCH JTA IMPORTANCE RATING:
RO N/A SRO N/A K/A CATALOG NUMBER: G2.3.7 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.5 SRO 3.6 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 RWP 13-0004 for Operations HP surveys N.E. Diagonal (Ui & U2)
HP surveys S.E. Diagonal (Ui & U2) 6OAC-HPX-004-0, Radiation & Contamination Control 6OAC-HPX-002, Personnel Dosimetry 34S0-E1 1-010-2, Attachment 3 REQUIRED MATERIALS:
Unit 2 RWP 13-0004 for Operations HP surveys N.E. Diagonal (Ui & U2)
HP surveys S.E. Diagonal (Ui & U2) 6OAC-HPX-004-O, Radiation & Contamination Control 6OAC-HPX-002, Personnel Dosimetry 34S0-El 1-010-2, Attachment 3 APPROXIMATE COMPLETION TIME:
1.0 Minutes SIMULATOR SETUP:
N/A
UNIT 2 READ AND GIVE A COPY TO THE OPERATOR INITIAL CONDITIONS:
1 Unit 2 is at 100% power with NO significant problems.
2.
34SV-El 1-001-2, Residual Heat Removal Pump Operability, is to be performed this shift on A Loop RHR pumps.
3.
The current OPS RWP is 13-0004.
4.
The RWP and HP Survey Maps are available.
INITIATING CUES:
You are assigned to locally perform the pre-start checks for 34SV-Eli-001-2, Residual Heat Removal Pump Operability, A loop RHR and are to:
Determine the correct survey map for A loop RHR.
Calculate the maximum stay time before the DAD alarms on dose accumulated, assuming you:
remain near the RHR pumps and are at the highest current General Area Dose Rate State your required actions if the DAD alarms on dose accumulated.
2013-301 ADMIN 5 Page 3 of 5 SATIUNSAT I STEP I
PERFORMANCE STEP STANDARD I
(COMMENT
- 1 For Initial Operator Programs:
For OJT/OJE; All procedure steps must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN J
Human performance tools, safety, PPE met (1), AND L1 Mark the JPM as a PASS For initial trg all steps completed correctly OR PASS L1 For continuing trg, critical steps (if used) completed correctly Mark the JPM as a FAIL FAIL Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:
PROMPT:
AT this time, give the operator the RWP and HP Survey Maps.
Determine the appropriate survey Operator determines that survey SAT / UNSAT map.
map 94797; U2 N.E. Diag. 87 is the correct map.
NOTE:
If operator selects the incorrect map, Critical Step #2 will be INCORRECTLY calculated.
- 2.
Determine the maximum stay time Operator determines the max stay SAT / UNSAT before the DAD alarms on dose time is minutes.
accumulated.
NOTE:
Per RWP, DAD set at mr for rounds. Per Survey Map, the max general area dose rate is mr/hr.
- 3 Determine required actions if the Operator determines that SAT / UNSAT DAD alarms on dose accumulated.
immediate exit and HP notification is required.
2013-301 ADMIN 5 Page 4 of 5 9 I PERFORMANCE STEP STANDARI)
I (COMMENTS)
EN])
TIME:________
NOTE:
The terminating cue shall be given to the Applicant when:
After JPM step #3 is complete.
With NO reasonable progress, the Applicant exceeds double the allotted time.
Applicant states the task is complete.
TERMINATING CUE:
That completes this JPM.
12/31/2012 Suspended by JOREAGIN DAD Alarms Dose (mr)
Rate (mr/h) 25 250 10 50 Radiation Vork Permit Plant Hatch 13-0004 ACTIVE Unit Rev 0
Job Operations Inspection, Surveillance and Fire Watch
- THIS RWP NOT FOR ENTRIES INTO LOCKED HIGH RAD OR Description VERY HIGH RAD AREAS j Location GENERAL PLANT LOCATION HP Coverage Authorization Briefing Start Date 12/31/2012 End Date 12/31/2013 INThRMITTENT WORK GROUP CONDITIONAL Job Supv. SOS Ext. 5959 Tasks Radiological Conditions Refer to current survey of work area.
Dosimetry DIGITAL ALARMING DOSIMETER (DAD)
WHOLE BODY TLD
[
Protective Clothing Requirements ER TO WORKERJSPECIAL INSTRUCTIONS Description OPS Rounds, Clearances, Surveil.
OPS Control Room Activities Supervision I Observation JPMs ITraining Activities 20 10 100 80 Respirators PAPR RESP Usage is Conditional per HP Instructions DADs must be accessible for visual monitoring. Monitor DAD periodically while in the RCA.
Lab Coats, Booties & Gloves allowed for inspections, surveillances per procedure NMP-HP-207.
Lab Coat & Latex gloves are minimum dress requirements for outside person pulling drums.
Unless otherwise specified by HP, full dress is required for contaminated area entry.
Use Cameras in lieu of entry, when possible, to reduce exposure.
Entries into Locked High Rad or Very High Rad areas are not permitted on this RWP.
Personnel performing Inside Rounds training should get on the Operations Rounds task.
Training being performed in High Radiation areas SHALL be on the Operations/Rounds task.
Briefing required prior to entering a High Radiation Area Dosimetry worn in FME areas must be secured in addition to being placed on a lanyard (e.g. bagging and taping). Lanyards have a breakaway feature; therefore additional securing of dosimetry is needed to prevent lose of the equipment.
Prepared Health Physics Staff C
Approved Terminated
Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM DRAFT ADMIN 6 SRO-I & SRO-U
Title:
EVALUATE THE NEED FOR/RECOMMEND OFFSITE PROTECTIVE TIONS Author:
Media Number:
Time Anthony Ball 2013-301 ADMIN 6 13.0 Minutes Reviewed By:
Date:
Reviewed by Instructional Technologist or designee Date Approved By Date SOUTHERN COMPANY
Course Number Pro2ram Name Media Number OPERATIONS TRAINING 2013-301 ADMIN 6 Authors Suns Rev. No.
Date Reason for Revisions Initials Initials 01 09/24/92 General revision and format change WMM SMC 02 General revision, word processor change, incorporate change B
08/05/94 to MIDAS, adjust format RA MMG 03 08/2 1/96 Format change RAB DHG 04 07/03/97 Revised initiating cue and added MIDAS screen.
SCB DHG 05 03/21/00 Format modification, change time allowance based on RAB DHG running average, change MIDAS form due to revision 06 11/06/00 Include objective number RAB DHG 07 03/25/02 Include initial operator statement RAB RAB 08 03/17/04 Rev to 73EP-EIP-054-0 DNM DHG 09 06/27/05 Revised Initial License statement for successful completion RAB RAB Updated to include latest Midas and ENN form, removed 0
03/21/06 Response Cues RAB RAB 11 12/04/06 Updated for NMP-EP-109.
DHG DHG 12 3/30/11 Updated for reference to NMP-EP-1 12. Added Human JSC/
BKW Performance Tools Added where to obtain wind direction MMG from control room indications or ENN form.
12.1 3/7/12 Revised handout with new version of EN form SDH 12.2 Revised to match procedure and retitled JPM to ARB 2013-301 ADMIN 6 for use on ILT-8 NRC Exam.
Once NRC Exam is complete it will return to original title.
2
Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 3
2013-301 ADMIN 6 Page 1 of 8 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
EVALUATE THE NEED FOR/RECOMMEND OFFSITE PROTECTIVE ACTIONS JPM NUMBER:
2013-301 ADMIN 6 TASK STANDARD:
The task shall be completed when the Protective Action Recommendation has been made per NMP-EP-1 12.
TASK NUMBER:
201.105 (EPOO1.088)
OBJECTIVE NUMBER:
200.105.A PLANT HATCH JTA IMPORTANCE RATING:
RO 3.00 SRO 3.00 K/A CATALOG NUMBER: 295038EA201 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.30 SRO 4.30 OPERATOR APPLICABILITY:
Senior Reactor Operator (SRO)
GENERAL
REFERENCES:
Unit 1 & 2 NMP-EP-1 12 (current version)
REQUIRED MATERIALS:
Unit 1 & 2 NMP-EP-1 12 (current version)
APPROXIMATE COMPLETION TIME:
13.0 Minutes SIMULATOR SETUP:
N/A
UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
The Prompt Offsite Dose Assessment has just been completed. The EN form has been printed and is available. The MIDAS screen is available.
2.
The Dose Assessment Staff is NOT available yet.
3.
The Shift Manager has declared a General Emergency due to the release.
4.
The release is ongoing and duration is currently unknown.
4.
The Shift Manager is performing the functions of the Emergency Director.
5.
SPDS is NOT available.
6.
No adverse weather conditions exist.
7.
No manmade threats, i.e. terrorist threats, exist INITIATING CUES:
Determine the Protective Action Recommendations for the EPZ only, per NMP-EP-1 12.
2013-301 ADMIN 6 Page 3 of 8 I STEPj PERFORMANCE STEP STAN])ARI)
I (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN Li Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:_______
PROMPT:
AT this time, GIVE the operator the Emergency Notification Form, and the MIDAS Screen.
1.
Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
- 2.
Initiate Attachment 1 section A of The student addresses step A. 1 of NMP-EP-112 and starts the PAR and begins the flow flow chart chart section of Attachment 1, answering the first decision step of has a general emergency been declared? as YES of NMP-EP 112.
(** Indicates critical step)
2Ol330l ADMIN 6 Page 4 of 8 I
SAT!UNSAT I
I STEP I
PERFORMANCE STEP STANDARD I
(COMMENTS)
I
- 1
exceeds the definition of a PUFF release. The student refers to the definition section of NMP-EP 112 for what constitutes a PUFF release as needed.
- 4 Addresses the decision block of Is a The student should answer NO known Site or Plant Event Underway based on the initial conditions making Evacuation Dangerous.
number.
- 5 Addresses the decision block do The student should answer NO known offsite conditions make to this question based on the evacuation dangerous initial conditions.
- 6.
Addresses the decision block have From the projected dose on the doses at or beyond the site boundary ENN form the student should been projected to exceed PAGs.
answer this question YES and determines that PAR 3 is the required PAR.
- 8.
Determines the wind direction and At panel 1H1 1-P690, the operator records it on Attachment 5 PAR 3.
has DETERMINED wind direction to be from 25°, using one of the following recorders:
1Y33-R601 (10 meter) 1Y33-R602 (60 meter) 1Y33-R603 (100 meter)
OR At panel 1111 l-P689, the operator has determined wind direction to be from 25°, using recorder 1Y33-R604 (23 meter).
OR The Emergency Notification Form.
(** Indicates critical step)
2013-301 ADMIN 6 Page 5 of 8 I
SATIUNSAT I
I STEP I
PERFORMANCE STEP STANDARD I
(COMMENTS)
I
- 1
- 9 Determines the affected zones from Determines the affected zones to the Hatch Attachment and records be evacuated are A, B5, C5, D5, them on Attachment 5.
ES, D10, ElO, and FlO.
- 1O.
Provide the information to the ED.
Gives the completed Attachment 5 to the ED.
PROMPT:
IF the student asks about supplemental PARs INFORM them that supplemental PARs are NOT desired at this time.
PROMPT:
IF the operator addresses notifications, as the Shift Manager, INFORM the operator that another operator will make the State and Local notifications.
END TIME:________
NOTE:
The terminating cue shall be given to the operator when:
After JPM step #10 is complete.
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
We will stop here.
(*
- Indicates critical step)
2013-301 ADMIN 6 Page 6 of 8 I STEP PERFORMANCE STEP STANDARD (COMMENTS) 1
- INSTRUCTOR COPY NOT FOR STUDENT***
Figure 1 PAR WORKSHEET INSTRUCTIONS:
1.
Check the box for the applicable PAR (1, 2, 3, or 4).
2.
Record the 15 minute average wind direction from for the selected PAR.
Use met instrumentation corresponding to primary release point(s) (BWR) Q ground level release (PWR).
3.
Use the applicable Site Specific PAR table (Table 1 or 2) to determine the affected zones.
I CAUTION:
I PAR Revisions must include previous PARs.
I On the ENN Form for the selected PAR:
Select block 5.B and record the Evacuate zones OR select block 5.C and record the Shelter zones Select block 5.D IF PAR 4 is selected, THEN additionally select block 5.E Other and provide Affected Sectors and To Miles Wind direction from ENN Line 5 [C]
Shelter Zones PAR 1 Advise remainder of EPZ to Monitor Local Radio/TV Stations ENN Line 5 [D]
[Tone Alert Radios. Consider the use of KI (Potassium Iodide) in accordance with State Plans and Policy Wind direction from ENN Line 5 [B]
Evacuate Zones PAR 2 Advise remainder of EPZ to Monitor Local Radio/TV Stations ENN Line 5 [D]
[lone Alert Radios. Consider the use of Kl (Potassium Iodide) in accordance with State Plans and Policy Wind direction from 25° NNE N/i ENN Line 5 [B]
A, B5, C5, D5, E5, D1O, ElO, FlO
[/\\J Evacuate Zones PAR 3 Advise remainder of EPZ to Monitor Local Radio/TV Stations ENN Line 5 [D]
[Tone Alert Radios. Consider the use of Kl (Potassium Iodide) in accordance with State Plans and Policy Wind direction from ENN Line 5 [B]
Evacuate Zones I
Advise remainder of EPZ to Monitor Local Radio/TV Stations!
ENN Line 5 [D]
Tone Alert Radios. Consider the use of KI (Potassium Iodide) in PAR 4 accordance with State Plans and Policy ENN Line 5 [E]
Evacuate Affected Sectors to OTHER miles Approval:
Emergency Director Date/Time
(** Indicates critical step)
NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM I. (s) A DRILL 0 B.ACTUOLEEI1T I,Iessage#I 2 (1.AINlTIL 0 8.FOLLOL-UP NOTIFICTIOFJ: TItlE DATE
.UTHENTlCTIO[I#
Iatctt Confirmation Phone 1.O12-307-22OiY IERr EN CY 1.
0 UNUSUAL EENT GB. uLERT CC. SITE REET,IERGEI1CY 1 0. GENERLEIIERGENCY CL-&IFI11N BSEDO[iEL4 RG1V ELDESCRIPTIOt1:
Offcne Coca R&suo op from an Actual or lmrnmneno Reease of Geneous Radcactty Exceede I 000 mR A.
TEDE OR 0000 mRThyro4 ODE fortheActu& o Procc:ed Duration of the Roaaa U&ng Actua IIe:ccrcgv.
V.
- 5. PROTECTIVE ACTION RECOMMENDATIONS A hONE B.EJACUATE AJ 8-051 8-101 C-sot C-ioJ o-oo{
0-101 E-ost E-lOl F-oSJ F-lOI 0-lot H-lot 1-101 J-10I K-lot L-lOt C. SHELTER u
B-05 8-101 C-sEt C-lot D-aE(
0-lot E-OEt E-l0(
F-aol F-lot G-iot H-lOj i-lot J-loj K-lot L-lOj
- 0. Adise Remainder of EPZto Monitor Local Radio,TJ StafionsTone Je Radios forAdditional Informafion and Censiderfine use of KI potassium iodide in accordance wiTh State plans and policl.
E.OTHER
- 6. EMERGENCY RELEASE 0 A [lane 0 8. Is Occurring 0 C. Has Occurred
- 7. RELESE Sc-C,FiCLJ1CE: C A. lot apr cede 0. mYh normm-a, oporaung is (t C. Above norma operating Inns 0 0. Under evaliaton
- 0. EVEIITPROGIIOSS:
0 A. provmg 0 6. Stee 0 c. Degradng
- 0. METEOROLOGICAL DATA:
lUnd Dhecdon frorn 25 degrees tYnd Speed 5
mph 0
- r not bs cvailcbls too 011131 floflficntions Preonnaton-nCn Stuony Cans 0 0l Oct (d) 010 El OFlO 0
- 10. (tI A. OECLARATOII 0 S.TERIAMATmOO Two dn:nmm Deja ddtY 1l.FFEOTEDU1liflS: Ci 2
OAr
- 12. UI IT SrAUS:
1 1C Pc r
u o
i a Ca
- 0. U2 10 Power Snutdown atTirne 00:15 Date O2C!12 R4S; 275 charactars oft FOLLOW-UP INFORMATION (LINES 14 through 16 Not Required for Initial NotNications EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.
14, RELEASE Ch&RACTERT.0il:
TVPE:
) A, Eevared 0. Iroed C) C. Ground LNTS:QACI 0 B.Cgaec C) C.uClsec 11ob Gases. 0.7E01 oxes,*1.2E0C Partja:eo: D.cEDO Othev:
FORM: () A0-nrccrna StanTrme: hron-m 0e:snnmwddi
StcxTinre:hhww Date:mwdd
() 0. Lqud Startwe: ht:mvnm Date: n-nddd j
Stop The: hbwnm j
Date:rnqJdd IS. PROJEClOIl M5IERS:
Prcecton cer:od:
Hours Estrneted ReaseDuratcn Hours Proec:cn oerfcrmec:
Thanhwrl Oa:ennnddyy Acctien:Tvpo:
V
- 10. PROJECTED DOSE:
DSTkI1CE TE0Emniram THYROID ODE (nmrenm Staboundary 1.1003 2.OEO3 2.1cc 1.0503 Y.7E03 3.0502 3:E02 IC MIen
&.EoI 0
1ED 8
it; 0
c0og0,bCV OI1I0Ti Dat 3 C LTO0t l1OT1FE0
ECEIED E V
5Y L__...._.._____...__.
0ale
[ Valate ]
tEnt I Approval j I:oar CHi
n End Run 3.1 mi Ingestion Pathway 1.OE+02 +
5.OE+01 -1.OE+02 1.OE+O1 -5.OE+O1 5.UE+OO
. 1.OE+O1 1.OE+O0
- 5.OE÷0O 1.OE-O1 -1.OE+0O 1.OE lIJE-Ol 1.OE 1.OE-02 1.0E1J4
- 1IJE-1J3 1.IJE-05
- 1.06-04 1.OE-OS-1.06-05 1.OE-07
- 1.IJE-06 13 Mile:
Site:
Title:
Time:
PLANTCH3i563.11N82 20 39.6W Ve;sion:1.5.10 081805 W PLANT HATCH Unit NT TOTAL EFFECTIVE DOSE EUUIVALENT (TEDE) RATE At 1125 Hour Projection 0
03/15/06 09:08 03/15/06 Oft53 03/15/06 09:08 Menu:
A Quick Dose Projection Model:
Projected Plume Segment Current Time:
03/15/06 03:05 Run Time:
03/15/06 09:04 Manual Entry of Met Data Current Met:W5 (mph): 5.0 WD (from): 25 ST: D End Date of 15 Minute Rate Computation:
Start of Release:
End of Release:
Manual Entry of Monitor data Current Release Rate (Cl/see):
9.8E+O1 LTotalCi: N:8.7E+O4 l:1.1E--03 P:O.OE+0O Peak values Peak TEDE (mrem/hr):
2.5E+02 Dir (to): 55W Dist [miles):
1.0 Peak THY CDE (mrem/hr):
- 3. 3E +02 Dir(to):
55W Dist [miles):
1.1 TEDE/EDE at Peak TEDE:
1.OE+Q0 Contour Dose Rate Legend (mrem/hr)
I1_
2 3
4 6F 7: