Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 819 December 2013License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Power Uprate
ML13297A30717 December 2013Issuance of an Amendment Regarding Changing Technical Specification Table 3.3-4 for Degraded Voltage Time Delay ValuesSafe Shutdown
Anticipated operational occurrence
Incorporated by reference
IR 05000400/20134045 December 2013Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
ML13330B63927 November 2013Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year IntervalNon-Destructive Examination
HNP-13-114, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns26 November 2013Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
HNP-13-122, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting Calculations25 November 2013Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting CalculationsBoric Acid
Non-Destructive Examination
Hydrostatic
Finite Element Analysis
Stress corrosion cracking
Exclusive Use
Affidavit
ML13329A45725 November 2013Accepted for Review Shearon Harris--Acceptance Review for Relief Request I3R-13 Reactor Vessel Closure Head Nozzle 37
HNP-13-116, Cycle 19 Core Operating Limits Report, Revision 024 November 2013Cycle 19 Core Operating Limits Report, Revision 0Shutdown Margin
TAC:MF310422 November 2013
HNP-13-119, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval22 November 2013Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year IntervalNondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML13325A85521 November 2013301 Initial Exam Draft Administrative DocumentsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Squib
Downpower
Unidentified leakage
Manual Operator Action
ML13324B08120 November 2013E-mail Re. Acceptance Review for Relief Request I3R-12 Repair of Accumulator Fill Valve Piping Weld
ML13280A48219 November 2013Interim Staff Evaluation and Request for RAI Re. the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13325A94818 November 2013301 Initial Exam Draft Sim IN-Plant JPMs
ML13325A92118 November 2013301 Initial Exam Draft RO Written Exam
ML13325A95118 November 2013301 Initial Exam Draft Administrative JPMsSafe Shutdown
Job Performance Measure
ML13325A93618 November 2013301 Initial Exam Draft SRO Written ExamShutdown Margin
Grab sample
Unidentified leakage
ML13325A95318 November 2013301 Initial Exam Final Administrative DocumentsSafe Shutdown
Boric Acid
Shutdown Margin
Post Accident Monitoring
Squib
Job Performance Measure
Operability Determination
Grace period
Unidentified leakage
Overspeed trip
ML13325A95718 November 2013301 Initial Exam Final Simulator Scenarios
ML13325A95918 November 2013301 Initial Exam Final Sim IN-Plant JPMsSquib
Job Performance Measure
Coast down
ML13325A93918 November 2013301 Initial Exam Draft Simulator ScenariosBoric Acid
Shutdown Margin
Grab sample
Post Accident Monitoring
Downpower
Manual Operator Action
Operational leakage
ML13325A96018 November 2013301 Initial Exam Final Administrative JPMsSafe Shutdown
Job Performance Measure
ML13312A89415 November 2013Branch Chief Reassignment for Plant Licensing Branch II-2
ML13312A9888 November 2013Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications
TAC:MF30597 November 2013
HNP-13-108, Relief Request Accumulator Fill Valve Piping Weld, Lnservice Inspection Program- Third Ten-Year Interval7 November 2013Relief Request Accumulator Fill Valve Piping Weld, Lnservice Inspection Program- Third Ten-Year IntervalBoric Acid
Time of Discovery
Stress corrosion cracking
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results6 November 201310 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing ResultsFitness for Duty
IR 05000400/20130044 November 2013IR 05000400-13-004: on 07/01/2013 & 09/30/2013; Shearon Harris Nuclear Power Plant, Unit 1; Fire ProtectionSafe Shutdown
Fire Barrier
Temporary Modification
Significance Determination Process
Fire Protection Program
Hourly Fire Watch
Downpower
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13305B04731 October 2013IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover LetterAffidavit
IR 05000400/201340631 October 2013IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover LetterAffidavit
IR 05000400/201330130 October 2013Er 05000400-13-301; Operating Test September 9 - 18, 2013, & Written Exam September 25, 2013; Shearon Harris Nuclear Plant; Operator License ExaminationsPressure boundary leak
ML13302A20228 October 2013Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
IR 05000400/201300923 October 2013Errata Shearon Harris Nuclear Power Plant, Unit 1, NRC Evaluation of Changes, Tests, and Experiments and Permanent Plant Modifications Baseline Inspection Follow-Up Report 05000400/2013009
ML13295A30622 October 2013Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC
ML13267A29321 October 2013Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466)Safe Shutdown
Cyber Security
Safeguards Contingency Plan
License Renewal
Offsite Circuit
Fire Protection Program
Power Uprate
ML13295A40817 October 2013301 Initial Exam Final RO Written ExamSafe Shutdown
Boric Acid
High Radiation Area
Downpower
HNP-13-101, 301 Initial Exam Post Exam Comments17 October 2013301 Initial Exam Post Exam CommentsBoric Acid
ML13295A41617 October 2013301 Initial Exam Final SRO Written ExamSafe Shutdown
Unanalyzed Condition
Boric Acid
Time of Discovery
Fitness for Duty
Health Physics Network
Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Process Control Program
Safeguards Contingency Plan
Earthquake
Offsite Circuit
Grace period
Downpower
Fatality
Siren
Overexposure
Blind Performance Test
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask8 October 2013Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask
ML13218B36927 September 20137/30/2013 - Summary of Meeting with Duke Energy Regarding a Change to the Emergency Response Facility Activation Timeliness and Criteria
ML13204A26727 September 201307/09/13 Summary of Meeting with Duke Energy Regarding a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request
IR 05000400/201300720 September 2013IR 05000400-13-007; 08/05/2013 - 08/23/2013; Shearon Harris Nuclear Power Plant, Unit 1; Biennial Inspection of Problem Identification and Resolution Program
ML13262A07416 September 2013Operator Licensing Written Examination Approval 05000400-13-301
ML13238A15413 September 2013Relief Request I3R-11 for Reactor Vessel Closure Head Penetration Nozzles Repair Inservice Inspection Program - Third 10-Year IntervalNon-Destructive Examination
Weld Overlay
Incorporated by reference
Stress corrosion cracking
Liquid penetrant
RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site11 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SiteSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13232A1614 September 2013Branch Chief Reassignment for Plant Licensing Branch
ML13252A0074 September 2013Crystal, Unit 3, Shearon Harris, Unit 1, McGuire, Unit 1 & 2, Oconee, Units 1, 2 & 3 and H.B. Robinson - Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML13246A0663 September 2013Mid Cycle Assessment Letter