RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 | 19 December 2013 | License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program Power Uprate |
ML13297A307 | 17 December 2013 | Issuance of an Amendment Regarding Changing Technical Specification Table 3.3-4 for Degraded Voltage Time Delay Values | Safe Shutdown Anticipated operational occurrence Incorporated by reference |
IR 05000400/2013404 | 5 December 2013 | Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404 | |
ML13330B639 | 27 November 2013 | Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year Interval | Non-Destructive Examination |
HNP-13-114, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 26 November 2013 | Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
HNP-13-122, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting Calculations | 25 November 2013 | Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Lnservice Inspection Program- Third Ten-Year Interval Supporting Calculations | Boric Acid Non-Destructive Examination Hydrostatic Finite Element Analysis Stress corrosion cracking Exclusive Use Affidavit |
ML13329A457 | 25 November 2013 | Accepted for Review Shearon Harris--Acceptance Review for Relief Request I3R-13 Reactor Vessel Closure Head Nozzle 37 | |
HNP-13-116, Cycle 19 Core Operating Limits Report, Revision 0 | 24 November 2013 | Cycle 19 Core Operating Limits Report, Revision 0 | Shutdown Margin |
TAC:MF3104 | 22 November 2013 | ||
HNP-13-119, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval | 22 November 2013 | Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval | Nondestructive Examination Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML13325A855 | 21 November 2013 | 301 Initial Exam Draft Administrative Documents | Safe Shutdown Boric Acid Shutdown Margin Grab sample Squib Downpower Unidentified leakage Manual Operator Action |
ML13324B081 | 20 November 2013 | E-mail Re. Acceptance Review for Relief Request I3R-12 Repair of Accumulator Fill Valve Piping Weld | |
ML13280A482 | 19 November 2013 | Interim Staff Evaluation and Request for RAI Re. the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
ML13325A948 | 18 November 2013 | 301 Initial Exam Draft Sim IN-Plant JPMs | |
ML13325A921 | 18 November 2013 | 301 Initial Exam Draft RO Written Exam | |
ML13325A951 | 18 November 2013 | 301 Initial Exam Draft Administrative JPMs | Safe Shutdown Job Performance Measure |
ML13325A936 | 18 November 2013 | 301 Initial Exam Draft SRO Written Exam | Shutdown Margin Grab sample Unidentified leakage |
ML13325A953 | 18 November 2013 | 301 Initial Exam Final Administrative Documents | Safe Shutdown Boric Acid Shutdown Margin Post Accident Monitoring Squib Job Performance Measure Operability Determination Grace period Unidentified leakage Overspeed trip |
ML13325A957 | 18 November 2013 | 301 Initial Exam Final Simulator Scenarios | |
ML13325A959 | 18 November 2013 | 301 Initial Exam Final Sim IN-Plant JPMs | Squib Job Performance Measure Coast down |
ML13325A939 | 18 November 2013 | 301 Initial Exam Draft Simulator Scenarios | Boric Acid Shutdown Margin Grab sample Post Accident Monitoring Downpower Manual Operator Action Operational leakage |
ML13325A960 | 18 November 2013 | 301 Initial Exam Final Administrative JPMs | Safe Shutdown Job Performance Measure |
ML13312A894 | 15 November 2013 | Branch Chief Reassignment for Plant Licensing Branch II-2 | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
TAC:MF3059 | 7 November 2013 | ||
HNP-13-108, Relief Request Accumulator Fill Valve Piping Weld, Lnservice Inspection Program- Third Ten-Year Interval | 7 November 2013 | Relief Request Accumulator Fill Valve Piping Weld, Lnservice Inspection Program- Third Ten-Year Interval | Boric Acid Time of Discovery Stress corrosion cracking |
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | 6 November 2013 | 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | Fitness for Duty |
IR 05000400/2013004 | 4 November 2013 | IR 05000400-13-004: on 07/01/2013 & 09/30/2013; Shearon Harris Nuclear Power Plant, Unit 1; Fire Protection | Safe Shutdown Fire Barrier Temporary Modification Significance Determination Process Fire Protection Program Hourly Fire Watch Downpower |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13305B047 | 31 October 2013 | IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover Letter | Affidavit |
IR 05000400/2013406 | 31 October 2013 | IR 0500400-13-404, 10/3/2013, Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report - Cover Letter | Affidavit |
IR 05000400/2013301 | 30 October 2013 | Er 05000400-13-301; Operating Test September 9 - 18, 2013, & Written Exam September 25, 2013; Shearon Harris Nuclear Plant; Operator License Examinations | Pressure boundary leak |
ML13302A202 | 28 October 2013 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination |
IR 05000400/2013009 | 23 October 2013 | Errata Shearon Harris Nuclear Power Plant, Unit 1, NRC Evaluation of Changes, Tests, and Experiments and Permanent Plant Modifications Baseline Inspection Follow-Up Report 05000400/2013009 | |
ML13295A306 | 22 October 2013 | Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC | |
ML13267A293 | 21 October 2013 | Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466) | Safe Shutdown Cyber Security Safeguards Contingency Plan License Renewal Offsite Circuit Fire Protection Program Power Uprate |
ML13295A408 | 17 October 2013 | 301 Initial Exam Final RO Written Exam | Safe Shutdown Boric Acid High Radiation Area Downpower |
HNP-13-101, 301 Initial Exam Post Exam Comments | 17 October 2013 | 301 Initial Exam Post Exam Comments | Boric Acid |
ML13295A416 | 17 October 2013 | 301 Initial Exam Final SRO Written Exam | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Fitness for Duty Health Physics Network Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Process Control Program Safeguards Contingency Plan Earthquake Offsite Circuit Grace period Downpower Fatality Siren Overexposure Blind Performance Test |
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | 8 October 2013 | Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | |
ML13218B369 | 27 September 2013 | 7/30/2013 - Summary of Meeting with Duke Energy Regarding a Change to the Emergency Response Facility Activation Timeliness and Criteria | |
ML13204A267 | 27 September 2013 | 07/09/13 Summary of Meeting with Duke Energy Regarding a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request | |
IR 05000400/2013007 | 20 September 2013 | IR 05000400-13-007; 08/05/2013 - 08/23/2013; Shearon Harris Nuclear Power Plant, Unit 1; Biennial Inspection of Problem Identification and Resolution Program | |
ML13262A074 | 16 September 2013 | Operator Licensing Written Examination Approval 05000400-13-301 | |
ML13238A154 | 13 September 2013 | Relief Request I3R-11 for Reactor Vessel Closure Head Penetration Nozzles Repair Inservice Inspection Program - Third 10-Year Interval | Non-Destructive Examination Weld Overlay Incorporated by reference Stress corrosion cracking Liquid penetrant |
RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site | 11 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13232A161 | 4 September 2013 | Branch Chief Reassignment for Plant Licensing Branch | |
ML13252A007 | 4 September 2013 | Crystal, Unit 3, Shearon Harris, Unit 1, McGuire, Unit 1 & 2, Oconee, Units 1, 2 & 3 and H.B. Robinson - Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML13246A066 | 3 September 2013 | Mid Cycle Assessment Letter |