 Issue dateTitleTopic
IR 05000331/201300931 December 2013IR 05000331-13-009; on 11/4/13 - 11/22/13; Duane Arnold Energy Center; Post-Approval Site Inspection for License RenewalFire Barrier
Hydrostatic
Coatings
VT-2
Incorporated by reference
Aging Management
License Renewal
Maintenance Rule Program
EVT-1
Liquid penetrant
Fire Protection Program
Grace period
Power Uprate
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
L-2013-334, Duane Arnold Energy Ctr., and Point Beach, Units 1 & 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums20 December 2013Duane Arnold Energy Ctr., and Point Beach, Units 1 & 2, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
NG-13-0455, Additional Information to Support Regulatory Conference (EA-13-223)19 December 2013Additional Information to Support Regulatory Conference (EA-13-223)Significance Determination Process
Preliminary White Finding
ML13358A39619 December 2013Enclosuadditional Information to Support Regulatory Conference (EA-13-223)Past operability
IR 05000331/201301118 December 2013EA-13-182, Duane Arnold Energy Center, Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC Inspection Report No. 05000331-13-011Mission time
Probabilistic Risk Assessment
Significance Determination Process
Preliminary White Finding
ML13351A50917 December 2013Regulatory ConferencePreliminary White Finding
ML13353A18517 December 20131/7/2014 - Notice of Meeting with NextEra Energy Duane Arnold, LLC
ML13347B05113 December 2013EN-13-043, Issuance of Final Significance Determination and Notice of Violation to NextEra Energy Duane Arnold, LLC (EA-13-182)Significance Determination Process
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
IR 05000331/20130085 December 2013IR 05000331-13-008; 09/03/2013 - 10/31/2013; Duane Arnold Energy Center (Daec); Evaluations of Changes, Tests, and Experiments and Permanent Plant ModificationsCondition Adverse to Quality
Aging Management
Significance Determination Process
Operability Determination
License Renewal
ML13343A1843 December 2013NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold RR VR-03 - MF3076
ML13301A70527 November 2013Issuance of Amendment Adopting TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.Shutdown Margin
Anticipated operational occurrence
Fire Protection Program
ML13323B44326 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
NG-13-0441, Request for Regulatory Conference25 November 2013Request for Regulatory Conference
NG-13-0407, NextEra Enerqy Duane Arnold, Llc'S Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns22 November 2013NextEra Enerqy Duane Arnold, Llc'S Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsUnanalyzed Condition
Fukushima Dai-Ichi
ML13326A06621 November 201311/5/2013 - Summary of Public Meeting with NextEra Energy Duane Arnold, LLC
ML13325A95619 November 2013EP Exercise Participation DRS
ML13310A52318 November 2013Project Manager Assignment
IR 05000331/201300414 November 2013IR 05000331-13-004, 07/01/2013 - 09/30/2013; Duane Arnold Energy Center; Maintenance Effectiveness, and Operability Determinations and Functionality AssessmentsHigh Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Internal Flooding
Past operability
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Preliminary White Finding
Fire Protection Program
Downpower
ML13322A46114 November 2013ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Earl HallHardened vent
ML13316C06112 November 2013NRR E-mail Capture - Acceptance Review for Duane Arnold Energy Center, LAR (TSCR-145): Application for TS Change Battery Terminal, Charger Voltage, Amperage Section Affected: 3.8.4
ML13308A9055 November 2013Regulatory Conference PresentationPast operability
ML13308A7984 November 2013Regulatory Conference Presentation EDG Timeline
ML13322A4174 November 2013Submittal of Amendments 286 and 287 to Duane Arnold Energy Center Technical SpecificationsCyber Security
Safeguards Contingency Plan
License Renewal
Fire Protection Program
ML13305A09631 October 2013DAEC Notification of NRC Inspection (Rkw)
L-2013-310, Florida Power and Light Co. - Official Service List Changes30 October 2013Florida Power and Light Co. - Official Service List Changes
ML13308A31629 October 2013Additional Information to Support Regulatory Conference (EA-13-182)Significance Determination Process
Preliminary White Finding
ML13308A31729 October 2013DAEC-SDP-2013-001 - PRA Risk Assessment, 'A' EDG Lube Oil Cooler LeakMission time
Past operability
Significance Determination Process
ML13302C16829 October 2013November 5, 2013, Duane Arnold Energy Center - Regulatory ConferencePreliminary White Finding
NG-13-0401, Relief Request for Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety28 October 2013Relief Request for Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or SafetyGrace period
TAC:MF307628 October 2013
Press Release-III-13-038, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Duane Arnold Nuclear Station25 October 2013Press Release-III-13-038: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Duane Arnold Nuclear Station
ML13296A53623 October 2013Notice of Category 1 Meeting with NextEra Energy Duane Arnold, LLC, to Discuss the Significance Associated with an Apparent Violation of 10 CFR Part 50, Appendix B, Criterion V
NG-13-0389, Response to Request for Additional Information Regarding Overall Integrated Plan in Response to Order EA-12-05110 October 2013Response to Request for Additional Information Regarding Overall Integrated Plan in Response to Order EA-12-051High Radiation Area
Spent Fuel Pool Instrumentation
NG-13-0391, Request for Regulatory Conference (EA-13-182)9 October 2013Request for Regulatory Conference (EA-13-182)
ML13192A4237 October 2013Issuance of Amendment to Change Renewed Facility Operating License Condition C.12Aging Management
Fire Protection Program
ML13277A4143 October 2013NRR E-mail Capture - DAEC NTTF Recommendation 2.3 (Seismic Walkdown)- Delayed Items
NG-13-0408, Additional Information to Support Regulatory Conference2 October 2013Additional Information to Support Regulatory Conference
NG-13-0377, Response to Request for Revised Operating License Pages for the License Amendment Request to Change to Renewed Operating License Condition C.121 October 2013Response to Request for Revised Operating License Pages for the License Amendment Request to Change to Renewed Operating License Condition C.12Fire Protection Program
NG-13-0382, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for the Duane Arnold Energy Center30 September 201310 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for the Duane Arnold Energy Center
IR 05000331/201301030 September 2013Preliminary White Choice Letter and Inspection Report 05000331-13-010Safe Shutdown
Mission time
Past operability
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Earthquake
Preliminary White Finding
ML13274A65130 September 2013Inspection Report (IR) 05000331-13-010, 04/08/2013 - 09/05/2013; Duane Arnold Energy Center, Maintenance Effectiveness (Cover Letter)Past operability
Significance Determination Process
Preliminary White Finding
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13255A19816 September 2013Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Spent Fuel Pool Instrumentation
ML13261A14416 September 2013Official Service List Distribution for Safeguards Information
NG-13-0368, NextEra Energy Duane Arnold, LLC - Revision to Seismic Walk Down Report13 September 2013NextEra Energy Duane Arnold, LLC - Revision to Seismic Walk Down ReportFukushima Dai-Ichi
TAC:MF012113 September 2013
IR 05000331/201340512 September 2013IR 05000331-13-405; 07/29/2013 - 08/02/2013; Duane Arnold Energy Center; Routine Security Baseline Inspection (Cover Letter Only)Affidavit