Category:Letter
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML20219A0882020-08-0707 August 2020 Correction Letter for Amendment No. 312 Removal of License Condition 2.C.(3), Fire Protection Program ML20184A0032020-07-30030 July 2020 Issuance of Amendment No. 312 Removal of License Condition 2.C.(3), Fire Protection Program ML20134J1042020-07-10010 July 2020 Issuance of Amendment No. 311 to Revise Operating License and Technical Specifications for Permanently Defueled Conditions ML20083G0082020-04-29029 April 2020 Issuance of Amendment No. 310 Changes to the Post-Shutdown Emergency Plan for Duane Arnold Energy Center ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements ML18292A5662018-11-30030 November 2018 Issuance of Amendment 308 to Upgrade Emergency Action Level Scheme for Duane Arnold Energy Center (DAEC) ML18241A3832018-10-31031 October 2018 Issuance of Amendment 307 to Revise Technical Specifications to Adopt TSTF-551, Revision 3 ML18179A1842018-08-16016 August 2018 Issuance of Amendment 306 to Revise Technical Specification 3.5.1, ECCS-Operating ML18081A0742018-05-0707 May 2018 Correction of Error to Implementation Date Associated with License Amendment No 303 ML18016A6272018-03-0909 March 2018 Issuance of License Amendment No. 304 Revision to Technical Specification 3.1.2, Reactor Anomalies ML18011A0592018-03-0707 March 2018 Issuance of License Amendment No. 303 Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation ML18032A4832018-03-0101 March 2018 Correction of Errors in Safety Evaluation Associated with License Amendment No. 301 ML17212A6462017-10-18018 October 2017 Issuance of Amendment to Modify the Plume Exposure Pathway Emergency Planning Zone Boundary ML17220A0262017-09-21021 September 2017 Issuance of Amendment 301 to Revise Emergency Plan ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17072A2322017-03-30030 March 2017 Issuance of Amendment to Revise Technical Specifications Fuel Storage Requirements ML16263A2452016-10-17017 October 2016 Issuance of Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program ML16211A5142016-09-12012 September 2016 Issuance of Amendment to Revise Technical Specifications 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16210A0082016-08-30030 August 2016 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16153A0912016-08-18018 August 2016 Issuance of Amendment to Revise the Value of Reactor Steam Dome Pressure ML16180A0862016-07-25025 July 2016 Issuance of Amendment to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report ML16174A2812016-07-13013 July 2016 Issuance of Amendment (TSCR-154) to Correct Examples in Technical Specifications Section 1.4, Frequency ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) ML13301A7052013-11-27027 November 2013 Issuance of Amendment Adopting TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML13192A4232013-10-0707 October 2013 Issuance of Amendment to Change Renewed Facility Operating License Condition C.12 ML13210A4492013-09-10010 September 2013 Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML13189A0712013-07-25025 July 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522 ML12321A2662012-11-28028 November 2012 Issuance of Amendment Revised Cyber Security Plan Implementation Schedule Milestone 6 ML12249A3172012-09-27027 September 2012 Issuance of Amendment One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown ML1219803602012-08-27027 August 2012 Issuance of Amendment Technical Specification Changes Regarding Alternative Testing of Safety/Relief Valves ML12125A3152012-06-0101 June 2012 Issuance of Amendment Concerning Approval of Upgrade of Emergency Action Level Scheme ML1201102822012-02-24024 February 2012 Issuance of Amendment Adoption of Technical Specifications Task Force Traveler (TSTF-425) to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML1115202312011-09-0808 September 2011 Issuance of Amendment Pertaining to Deletion of Decommissioning Funding Parent Guarantee License Condition ML1119402242011-07-29029 July 2011 Issuance of Amendment Pertaining to Cyber Security Plan (TAC No. 4287) ML1104104552011-02-28028 February 2011 Issuance of Amendment Pertaining to Technical Specification Changes to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) ML1029305862010-12-16016 December 2010 Nextera Energy Duane Arnold, LLC Central Iowa Power Cooperative Corn Belt Power Cooperative, Duane Arnold Energy Center Renewed Facility Operating License ML0530503092010-12-16016 December 2010 Current Facility Operating License DPR-49, Tech Specs, Revised 03/17/2018 ML1029305242010-12-16016 December 2010 Issuance of Renewed Facility Operating License No. DPR-49 for Duane Arnold Energy ML1006211692010-03-31031 March 2010 License Amendment, Issuance of Amendment Pertaining to Changes to Technical Specifications 5.5.12 (Primary Containment Leakage Rate Testing Program) & 3.6.1.3 (Primary Containment Isolation Values), Associated with Main .. ML0930301132009-11-13013 November 2009 Issuance of Amendment Pertaining to Name Chance of Licensee and Co-Owner ML0919003812009-09-18018 September 2009 Issuance of Amendment Pertaining to Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26. ML0912605512009-05-15015 May 2009 License Amendment, Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value ML0831901082008-12-0303 December 2008 License Amendment, Issuance of Amendment to Change Surveillance Requirements of the Cedar River Depth to Assure Ultimate Heat Sink Operability ML0826908352008-11-0606 November 2008 Issuance of License Amendment Regarding Control Rod Notch Testing Frequency and Clarification of a Frequency Example ML0822601162008-09-0909 September 2008 Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing 2022-05-20
[Table view] Category:Safety Evaluation
MONTHYEARML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22089A0492022-05-12012 May 2022 Sfmp Review Letter ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML21098A1662021-04-28028 April 2021 PDEP and EAL License Amendment Approval ML21097A1412021-04-13013 April 2021 EP Exemption Issuance Letter and SE ML20225A0002020-08-27027 August 2020 Approval of Quality Assurance Topical Report (FPL-3), Revision 0 (EPID-L-2020-LLQ-0002) ML20184A0032020-07-30030 July 2020 Issuance of Amendment No. 312 Removal of License Condition 2.C.(3), Fire Protection Program ML20134J1042020-07-10010 July 2020 Issuance of Amendment No. 311 to Revise Operating License and Technical Specifications for Permanently Defueled Conditions ML20083G0082020-04-29029 April 2020 Issuance of Amendment No. 310 Changes to the Post-Shutdown Emergency Plan for Duane Arnold Energy Center ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements ML19204A2872019-08-28028 August 2019 Approval of a Certified Fuel Handler Training and Retraining Program ML19198A0102019-07-23023 July 2019 Approval of Change in the BWRVIP Integrated Surveillance Program Capsule Test Schedule to Accommodate Early Closure ML19168A1302019-06-21021 June 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4391; EPID No. L-2014-JLD-0039) ML18292A5662018-11-30030 November 2018 Issuance of Amendment 308 to Upgrade Emergency Action Level Scheme for Duane Arnold Energy Center (DAEC) ML18241A3832018-10-31031 October 2018 Issuance of Amendment 307 to Revise Technical Specifications to Adopt TSTF-551, Revision 3 ML18179A1842018-08-16016 August 2018 Issuance of Amendment 306 to Revise Technical Specification 3.5.1, ECCS-Operating ML18192C1832018-07-24024 July 2018 Fifth 10-Year Inservice Relief Request RR-05 ML18145A1942018-06-15015 June 2018 Relief Request No. NDE R017 Fourth Inservice Inspection Interval Duane Arnold Energycenter (EPID-L-2017-LLR-0135) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18053A2092018-04-16016 April 2018 Request for Relief No. 03 Proposed Use of Alternative Requirements for Nozzle Inner Radius and Nozzle-to-Shell Weld Inspection for Fifth Inservice Inspection Interval (CAC No. MF9374; EPID L-2017-LLR-0110) ML18016A6272018-03-0909 March 2018 Issuance of License Amendment No. 304 Revision to Technical Specification 3.1.2, Reactor Anomalies ML18011A0592018-03-0707 March 2018 Issuance of License Amendment No. 303 Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation ML17353A6822018-01-19019 January 2018 Request for Relief No. RR 01, Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML17347A1112018-01-17017 January 2018 Safety Evaluation for Request for Relief from Seal Weld Procedure Qualification, Relief Request No. RR-04 ML17272A0182017-12-19019 December 2017 Relief Request No. RR-02- Proposed Alternative to ASME Code Examination Requirements for Buried Piping Related to Fifth Inservice Inspection Interval Program Plan ML17212A6462017-10-18018 October 2017 Issuance of Amendment to Modify the Plume Exposure Pathway Emergency Planning Zone Boundary ML17220A0262017-09-21021 September 2017 Issuance of Amendment 301 to Revise Emergency Plan ML17129A0372017-05-26026 May 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrument Related to Orders EA-12-049 and EA-12-051 ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17072A2322017-03-30030 March 2017 Issuance of Amendment to Revise Technical Specifications Fuel Storage Requirements ML16313A4752016-11-30030 November 2016 Correction of Errors in Safety Evaluation Associated with License Amendment No. 298 ML16263A2452016-10-17017 October 2016 Issuance of Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program ML16211A5142016-09-12012 September 2016 Issuance of Amendment to Revise Technical Specifications 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16210A0082016-08-30030 August 2016 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16153A0912016-08-18018 August 2016 Issuance of Amendment to Revise the Value of Reactor Steam Dome Pressure ML16180A0862016-07-25025 July 2016 Issuance of Amendment to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report ML16174A2812016-07-13013 July 2016 Issuance of Amendment (TSCR-154) to Correct Examples in Technical Specifications Section 1.4, Frequency ML16053A4262016-04-29029 April 2016 Correction of Typographical Errors in Safety Evaluation Associated with License Amendment No. 292 ML16008A0862016-01-21021 January 2016 Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) ML14144A0022014-06-0909 June 2014 Relief Request No. VR-03 Related to the Inservice Testing Program for the Fourth 10-Year Interval ML14099A3352014-04-29029 April 2014 Relief for 2nd Period Limited Weld Examinations ML13301A7052013-11-27027 November 2013 Issuance of Amendment Adopting TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML13323B4432013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13192A4232013-10-0707 October 2013 Issuance of Amendment to Change Renewed Facility Operating License Condition C.12 2022-05-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 7, 2013 Mr. Richard L. Anderson Vice President NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, lA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER- ISSUANCE OF AMENDMENT TO CHANGE RENEWED FACILITY OPERATING LICENSE CONDITION C.12
{TAC NO. MF0075)
Dear Mr. Anderson:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 287 to Renewed Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC).
The amendment consists of changes to the Technical Specifications {TS) in response to your application dated November 13, 2012 (Agency Documents Access and Management System (ADAMS) Accession No. ML12318A286), as supplemented by letters dated May 28, 2013 (ADAMS Accession No. ML13148A282) and letter dated October 151 , 2013 (ADAMS Accession*
No. ML13276A023).
The amendment revises the DAEC renewed facility operating license condition (RFOLC) C.12 to: (1) clarify that the updated final safety analysis report (UFSAR) supplement had been supplemented by Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 201 0," (2) replace "future activities to be completed prior to and/or during" with "programs to be implemented and activities to be completed before," (3) included the requirement to implement new programs and enhancements to existing programs no later than February 21, 2014, (4) include the requirement to complete activities no later than February 21, 2014, and (5) include the requirement to notify the NRC within 30 days of having completed the activities.
A copy of the Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
R. Anderson Please contact Carolyn Faria at (301) 415-4050, if you have any questions.
Sincerely, Karl D. Feintuch, Prpject Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosures:
- 1. Amendment No. 287 to License No. DPR-49
- 2. Safety Evaluation cc w/encls: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NEXTERA ENERGY DUANE ARNOLD, LLC DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 287 License No. DPR-49
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by NextEra Energy Duane Arnold, LLC dated November 13, 2012, as supplemented by letter dated May 28, 2013 and letter dated October 15 \ 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-49 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 287, are hereby incorporated in the license. NextEra Energy Duane Arnold, LLC, shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Robert D. Carlson, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: October 7, 2013
ATTACHMENT TO LICENSE AMENDMENT NO. 287 RENEWED FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50.:331 Replace the following page of Renewed Facility Operating License DPR-49 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT License Page 3 License Page 3 License Page 7 License Page 7
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: -
(1) Maximum Power Level NextEra Energy Duane Arnold, LLC is authorized to operate the Duane Arnold Energy Center at steady state reactor core power levels not in excess of 1912 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 287, are hereby incorporated in the license. NextEra Energy Duane Arnold, LLC shall operate the facility in accordance with the Technical Specifications.
(a) For Surveillance Requirements (SRs) whose acceptance criteria are modified, either directly or indirectly, by the increase in authorized maximum power level in 2.C.(1) above, in accordance with Amendment No. 243 to Facility Operating License DPR-49, those SRs are not required to be performed until their next scheduled performance, which is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment No. 243.
(b) Deleted.
(3) Fire Protection Program NextEra Energy Duane Arnold, LLC shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48( c), as specified in the licensee\ a~endment request dated August 5, 2011 (and supplements dated October 14, 2011, Apnl 23, 2012, May 23, 2012, July 9, 2012, October 15,2012, January 11,2013, February 12,2013, March 6, 2013, May 1, 2013, May 29, 2013, two supplements dated July 2, 2013, and supplements dated August 5, 2013 and August 28, 2013) and as approved in the safety evaluation report dated September 10, 2013. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
Renewed License No. DPR-49 Amendment No. 287
(11) The information in the UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be incorporated into the UFSAR no later than the next scheduled update required by 10 CFR 50.71(e) following the issuance of this renewed operating license. Until this update is complete, the licensee may not make changes to the information in the supplement. Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59.
(12) The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21(d), and as supplemented by Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 2010, describes certain programs to be implemented and activities to be completed before the period of extended operation.
- a. NextEra Energy Duane Arnold, LLC shall implement those new programs and enhancements to existing programs no later than February 21, 2014.
- b. NextEra Energy Duane Arnold, LLC shall complete those activities no later than February 21 , 2014.
The licensee shall notify the NRC in writing within 30 days after having accomplished item (a) above and include the status of those activities that have been or remain to be completed in item (b) above.
(13) The licensee shall implement the most recent staff-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) as the method to demonstrate compliance with the requirements of 10 CFR Part 50, Appendix H. Any changes to the BWRVIP ISP capsule withdrawal schedule must be submitted for staff review an.d approval. Any changes to the BWRVIP ISP capsule withdrawal schedule which affects the time of withdrawal of any surveillance capsules must be incorporated into the licensing basis. If any surveillance capsules are removed without the intent to test them, these capsules must be stored in a manner which maintains them in a condition which would support re-insertion into the reactor pressure vessel if necessary.
D. This license is effective as of the date of issuance and shall expire at midnight February 21, 2034.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Eric J. Leeds Eric J. Leeds, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Appendix A Technical Specifications
- 2. , Appendix B Additional Conditions Date of Issuance: December 16, 2010 Renewed License No. DPR-49 Amendment No. 287
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NEXTERA ENERGY DUANE ARNOLD, LLC DUANE ARNOLD ENERGY CENTER DOCKET NO. 50-331
1.0 INTRODUCTION
By application sent to the U.S. Nuclear Regulatory Commission (NRC or the Commission) dated November 13, 2012 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML12318A286), as supplemented by letters dated May 28, 2013 (ADAMS Accession No. ML13148A282) and October 151 , 2013 (ADAMS Accession No. ML13276A023),
NextEra Energy Duane Arnold, LLC, (the licensee), requested changes to the Technical Specifications (TSs) for Duane Arnold Energy Center (DAEC). The supplemental letter dated May 28, 2013, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on April 16, 2013 (78 FR 22571 ). .
The proposed changes in the November 13, 2012 request would modify the DAEC renewed facility operating license condition (LC) C.12 to: (1) remove "and/or during," (2) remove "in accordance with Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 201 0," (3) incorporate the requirement to complete certain activities no later than the period of extended operation (PEO) date of February 21, 2014, and (4) clarify that changes to the programs and activities described in the updated final safety analysis report (UFSAR) supplement may be governed by Title 10 of the Code of Federal Regulations (10 CFR) 50.59 criteria.
The supplemental letter dated May 28, 2013, revised wording for license condition C.12 that:
(1) clarified that the updated final safety analysis report (UFSAR) supplement had been supplemented by Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 201 0," (2) replaced "future activities to be completed prior to and/or during" with "programs to be implemented and activities to be completed before," (3) included the requirement to implement new programs and enhancements to existing programs no later than the PEO, (4) included the requirement to complete activities no later than the PEO, (5) included the requirement to notify the NRC within 30 days of having completed the activities; and (6) deleted the proposed language from LC C.12 stating that licensee can make changes to the UFSAR using 10 CFR 50.59 criteria.
2.0 REGULATORY EVALUATION
\
By application dated September 30, 2008 (ADAMS Accession No. ML082980480), NextEra Energy Duane Arnold, LLC (the licensee) requested renewal of the operating license in accordance with 10 CFR Part 54 for DAEC for a period of 20 years beyond the February 21, 2014, expiration date.
The NRC's safety review of the license renewal application (LRA) is contained in NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center,"
dated November 2010 (ADAMS Accession No. ML103070013). Appendix A of NUREG-1955 contains a Jist of 54 commitments made by the applicant as part of the license renewal review.
These commitments are related to completing license renewal-related inspections and implementing, modifying or enhancing aging management programs (AMPs) that manage the aging effects of systems, structures, and components (SSCs) prior to and during the period of extended operation (PEO). During a telephone conference on November 16, 2010, the staff requested additional information regarding implementation of the One-Time Inspection Program, Selective Leaching Program, Structures Monitoring Program, and environmentally assisted fatigue analyses. By letter dated November 23, 2010 (ADAMS Accession No. ML103430256),
four new commitments for license renewal were made by the licensee in response to the request for additional information (RAJ). The NRC issued the renewed operating license for DAEC on December 16, 2010 (ADAMS Accession No. ML053050309). As required by the ~
renewed license, there are certain activities which the licensee is required to meet before the start of the PEO.
By letter dated May 28, 2013 (ADAMS Accession No. ML13148A282), the licensee proposed to clarify that the UFSAR supplement had been supplemented by Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center,"
dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 2010. By letter dated May 31, 2011 (ADAMS Accession No. ML11158A048), the licensee sub,mitted Revision 21 of the UFSAR which included the list of commitments from Appendix A of NUREG-1955 in the UFSAR supplement.
The requested license amendment more-precisely states which activities in the UFSAR must be done, when they must be done, and what sort of notification to the NRC must be provided.
Specifically, in DAEC's license amendment request dated November 13, 2012, the licensee proposed that LC C.12 be limited to the period prior to extended operation (by removal of the phrase "and/or during"). The licensee also proposed to remove the phrase "in accordance with Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 201 0" to be replaced with "no later than February 21, 2014."
By letter dated May 28, 2013, the licensee submitted revised language for LC C.12 to supersede its original request. The revised language for LC C.12: clarified that the UFSAR supplement had been supplemented with Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 2010, as supplemented by letter from the licensee to the NRC dated November 23, 201 0." The licensee believed the change was needed to avoid the implication that certain commitments could not be changed without prior NRC approval. The licensee also proposed to replace the
clause "future activities to be completed prior to and/or during" with "programs to be implemented and activities to be completed before." In addition, the licensee proposed to include the requirement to implement new programs and enhancements to existing programs no later than the start of the PEO, February 21, 2014, and to notify the NRC within 30 days of having completed the activities. Last, the licensee withdrew the portion of the request which added statements about making changes to the UFSAR through the use of 10 CFR 50.59.
Thus, the final LC C.12 desired by DAEC states:
The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21(d),
and as supplemented by Appendix A of NUREG-1955, "Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center," dated November 201 0; as supplemented by letter from the licensee to the NRC dated November 23, 2010, describes certain programs to be implemented and activities to be completed before the period of extended operation.
- a. NextEra Energy Duane Arnold, LLC shall implement those new programs and enhancements to existing programs no later than February 21, 2014.
- b. NextEra Energy Duane Arnold, LLC shall complete those activities no later than February 21, 2014.
The licensee shall notify the NRC in writing within 30 days after having accomplished item (a) above and include the status of those activities that have been or remain to be completed in item (b) above.
In considering the amendment request, the Staff was guided by the considerations for issuance of the renewed license, and the original form of the LC.
3.0 TECHNICAL EVALUATION
The licensee proposed to replace "describes certain future activities to be completed prior to and/or during the PEO" with "describes programs to be implemented and activities to be completed before the PEO" in the revisions to the LC. The proposed language is more precise, and clarifies that the activities listed in UFSAR supplement involve both the implementation of programs and the completion of inspection and testing activities. Additionally, removal of the phrase "and/or during" from LC C.12 better states when programs must be complete.
The licensee proposed to include the requirement to implement new programs and enhancements to existing programs no later than February 21, 2014, which is the start of PEO, and to notify the NRC within 30 days of having completed the activities. The commitments listed in Appendix A of NUREG-1955 are reviewed by regional inspectors on a sampling basis.
This inspection occurs prior to the PEO using inspection procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal" (ADAMS Accession No. ML12258A160). The purpose of this inspection is to verify that aging management programs and activities are adequately implemented and/or completed before the licensee enters the PEO. The inspectors will also review any modifications to such activities as the Appendix A list of commitments that were incorporated in the UFSAR to ensure changes were made in accordance with applicable NRC requirements. Consistent with Revision 2 of the SRP-LR, the intent of LC C.12 was to ensure that: (1) the license renewal programs and activities that were scheduled to be implemented
and/or completed prior to the PEO were implemented and/or completed, (2) the NRC receives notification so NRC staff could verify implementation of activities through inspection, and (3)
NRC approval was obtained to change the implementation schedule for commitments that will not be completed prior to the PEO. This intent will be met with the addition of the requirement in ,
LC C.12 to complete certain activities no later than the PEO date.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Iowa State official was on notified July 10, 2013, of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
S Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). The amendment changes recordkeeping, reporting, or administrative procedures or requirements and changes the format of the license or otherwise makes editorial, corrective or other minor revisions. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (78 FR 22571) on April 16, 2013. Pursuant to 10 CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will 11ot be* inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: H. Jones, NRRIDLR!RSRG Date of issuance: October 7, 2013
- .. ML13192A423 *concurrence via SEdated 06/17/2013 OFFICE LPL3-1/PM LPL3-1/PM LPL3-1/LA NRR/RSRG/BC OGC NAME CFaria KFeintuch SRohrer BPham* D. Roth DATE 07/10/13 07/18/13 07/15/13 06/17/13 09/30/13 OFFICE LPL3-1/BC LPL3-1/PM NAME RCa rison KFeintuch DATE 10/07/13 10/07/13