10/10/2012 3/6/2013 11/1/2012 12/1/2012 1/1/2013 2/1/2013 3/1/2013 10/10/2012 1E053A2 Head to shell gaskets installed.
10/18/2012 Maint. Run 3hrs 19min 10/19/2012 STP 3.8.1-06 Fast Start Run 3hrs 34min EDG Operable 11/22/2012 STP 3.8.1-07 LOOP/LOCA run 3hrs 14min 11/28/2012 STP 3.8.1-04 Slow start 3hrs 38min 12/25/2012 STP 3.8.1-05 Slow start 3hrs 23min 1/20/2013 STP 3.8.1-04 Slow start 3hrs 26min 2/16/2013 STP 3.8.1-04 Slow start 3hrs 13min 11/26/2012 RFO23 complete 3/6/2013 3/10/2013 3/7/2013 3/8/2013 3/9/2013 3/10/2013 3/6/2013 Start conduit inspections 0812 hrs.
EDG Inop but Available.
Ambient Temps:
24F Low/High 3/7/2013 Continue additional conduit inspections.
0730 EDG Inoperable.
3/8/2013 Conduit Inspections Complete.
EDG Available.
0249 3/8/2013 EDG Maint. Run Complete.
0401 60dpm oil leak at 1E053A2 head to shell joint.
3/8/2013 EDG Maint. Run to investigate leak.
EDG tripped due to gross oil leakage at 1208.
3/8/2013 1E053A2 head/shell torque verified no less than 22 ft-lbs with EDG at standby conditions.
3/8/2013 EDG Maint. Run Started 0215.
3/9/2013 EDG Maint. Run 2148-2354 3/10/2013 EDG available 0049.
3/10/2013 STP 3.8.1-04 Slow start 0452-0820.
3/9/2013 WO 40220934-02 Complete. Approx. 1830.
3/6/2013 Approx. 1230.
Conduit 1K111/112 Inspections Complete Denotes timeframe with exhaust dampers failed open Denotes timeframe with oil heater de-energized.
11/17/2012 Maint. Run 4hrs 16min