Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML14015A022 | 31 December 2013 | WCAP-17675-NP, Supplement 1, Rev. 0, Ameren Missouri Callaway Energy Center Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Earthquake Maintenance Rule Program Scaffolding |
ML14115A324 | 31 December 2013 | Annual Report to the United States Nuclear Regulatory Commission Radiation Environmental Operating Report | Grab sample Met Tower Annual Radiological Environmental Operating Report Deep Dose Equivalent |
ULNRC-06068, Foreign Ownership Control or Influence (FOCI) | 30 December 2013 | Foreign Ownership Control or Influence (FOCI) | |
ML21195A310 | 30 December 2013 | Revision OL-25 to Final Safety Analysis Report, EA-13-237 Re Implementation of Additional Security Meassures and Fingerprinting for Unescorted Access | Exemption Request |
ML14002A197 | 30 December 2013 | Callaway Plant - Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats; Inspection Report Number 05000483-2013405 | |
ML13358A030 | 24 December 2013 | Request for Additional Information, Relief Request I3R-15 Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection Interval | |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
ULNRC-06057, Enclosure 2 to ULNRC-06057 - Amendment 28 LRA Change for LRA Annual Update and RAI Set 28 | 20 December 2013 | Enclosure 2 to ULNRC-06057 - Amendment 28 LRA Change for LRA Annual Update and RAI Set 28 | Boric Acid Ultimate heat sink Fire Barrier Hydrostatic Coatings Nondestructive Examination Aging Management Biofouling EVT-1 Fire Protection Program |
ML13354B816 | 20 December 2013 | NRR E-mail Capture - Question for TS 3.7.9 UHS LAR | |
ML13360A302 | 20 December 2013 | Enclosure 1 to ULNRC-06066, License Renewal Application, Request for Additional Information (RAI) Set #15 Responses Supplement to RAI B2.1.7-5A | Functionality Assessment |
ULNRC-06066, Supplement to RAI B2.1-7-5a | 20 December 2013 | Supplement to RAI B2.1-7-5a | |
ML13360A272 | 20 December 2013 | Annual Update to the Callaway License Renewal Application and Response to RAI Set #28 | Coatings |
ML13360A273 | 20 December 2013 | Enclosure 1 to ULNRC-06057, License Renewal Application - Request for Additional Information (RAI) Set #28 Responses | Ultimate heat sink Coatings Aging Management Moisture barrier Biofouling |
ML13357A748 | 19 December 2013 | Enclosure 1 to ULNRC-06060 - Request for Additional Information Set #5 Response | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Locked High Radiation Area Thermoset Large early release frequency Time Critical Operator Action Earthquake Maintenance Rule Program Fire Protection Program |
ML13224A195 | 19 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Severe Accident Management Guideline Frazil ice Battery sizing Earthquake |
ML13351A102 | 17 December 2013 | Notification of Generic Fundamentals Examinations for 2014 | Generic Fundamentals Examination |
ULNRC-06064, Physical Security Plan, Revision 11 | 16 December 2013 | Physical Security Plan, Revision 11 | |
ML13345A038 | 11 December 2013 | NRR E-mail Capture - Acceptance Review | |
TAC:MF2806 | 11 December 2013 | ||
ML13319A668 | 11 December 2013 | Relaxation of the Schedular Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events | Fukushima Dai-Ichi |
ML13338A644 | 9 December 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Callaway Plant, Unit 1, (TAC No. MF00772) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Severe Accident Management Guideline Frazil ice Battery sizing Earthquake |
TAC:MF3202 | 6 December 2013 | ||
ULNRC-06043, Application for Amendment to Facility Operating License Npf -30 (LDCN 13-0016) Revision to FSAR Standard Plant Section 3.6 for Hdpe Crack Exclusion | 6 December 2013 | Application for Amendment to Facility Operating License Npf -30 (LDCN 13-0016) Revision to FSAR Standard Plant Section 3.6 for Hdpe Crack Exclusion | Safe Shutdown Shutdown Margin Ultimate heat sink Internal Flooding Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Earthquake Through-Wall Leak |
ML13330A689 | 2 December 2013 | Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 29 | Aging Management |
IR 05000483/2013201 | 29 November 2013 | IR 05000483-13-201; October 22 - 24, 2013, Callaway Plant; Target Set Inspection - Cover Letter | Affidavit |
ULNRC-06052, Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | 26 November 2013 | Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | Fukushima Dai-Ichi |
TAC:MF0103 | 26 November 2013 | ||
ULNRC-06038, CFR 50.59 Summary Report | 26 November 2013 | CFR 50.59 Summary Report | |
ULNRC-06038, Callaway, Unit 1, 10 CFR 50.59 Summary Report | 26 November 2013 | Callaway, Unit 1, 10 CFR 50.59 Summary Report | |
ML13323A111 | 25 November 2013 | Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | High Radiation Area Safe Shutdown Earthquake Cyber Security Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Battery sizing Earthquake Fire Protection Program |
TAC:MF2970 | 21 November 2013 | ||
ULNRC-06056, Cycle 19 Commitment Change Summary Report | 21 November 2013 | Cycle 19 Commitment Change Summary Report | Biofouling |
ML13318A122 | 14 November 2013 | NRR E-mail Capture - FW: Callaway NFPA 805 LAR, Fpe RAI 20 | |
ULNRC-06054, Facility Operating License NPF-30, Fitness for Duty Reports for Ameren Missouri Callaway Energy Center for 2013 | 8 November 2013 | Facility Operating License NPF-30, Fitness for Duty Reports for Ameren Missouri Callaway Energy Center for 2013 | Fitness for Duty |
IR 05000483/2013004 | 7 November 2013 | IR 05000483-13-004; 07/01/2013 - 09/27/2013; Callaway Plant, Integrated Resident and Regional Report; Licensed Operator Requalification Program and Licensed Operator Performance | Boric Acid Ultimate heat sink Water Inventory Control Time to boil Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Earthquake Biofouling Offsite Circuit Fire Protection Program Power change |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13246A350 | 31 October 2013 | NFPA-805 LAR F&O Table | Safe Shutdown Multiple Spurious Operation |
ULNRC-06045, Response to Request for Additional Information Closure of Option 2 to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage | 31 October 2013 | Response to Request for Additional Information Closure of Option 2 to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage | Severe Accident Management Guideline |
ULNRC-06051, Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 30 | 29 October 2013 | Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 30 | |
ULNRC-06051, Operating Quality Assurance Manual (Oqam) Revision 30 | 29 October 2013 | Operating Quality Assurance Manual (Oqam) Revision 30 | |
ML13303B688 | 28 October 2013 | Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
ULNRC-06051, Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 | 28 October 2013 | Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
ML13298A132 | 25 October 2013 | NRR E-mail Capture - Acceptance Review | |
ML13296A530 | 23 October 2013 | NRR E-mail Capture - Callaway - Request for NFPA 805 License Amendment Factual Accuracy Review | Hot Short Safe Shutdown Boric Acid Ultimate heat sink Mission time Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Large early release frequency Hemyc Earthquake Continuous fire watch Fire Protection Program |
ML13291A041 | 17 October 2013 | CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves | Boric Acid Hydrostatic VT-2 |
ULNRC-06048, Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves | 17 October 2013 | Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves | Boric Acid Hydrostatic VT-2 |
ULNRC-06048, Attachment 2 to ULNRC-06048, Piping and Instrumentation Drawings (P&Ids) | 17 October 2013 | Attachment 2 to ULNRC-06048, Piping and Instrumentation Drawings (P&Ids) | |
TAC:MF2921 | 17 October 2013 | ||
ML13290A519 | 17 October 2013 | Notice of the Secretary Lifting Suspension of Adjudicatory Activity in the Matter of Callaway, Unit 1 | |
ML13283A126 | 10 October 2013 | Notice of the Secretary Regarding Agency Shutdown in the Matter of Callaway, Unit 1 |