Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14015A02231 December 2013WCAP-17675-NP, Supplement 1, Rev. 0, Ameren Missouri Callaway Energy Center Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report.Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
Maintenance Rule Program
Scaffolding
ML14115A32431 December 2013Annual Report to the United States Nuclear Regulatory Commission Radiation Environmental Operating ReportGrab sample
Met Tower
Annual Radiological Environmental Operating Report
Deep Dose Equivalent
ULNRC-06068, Foreign Ownership Control or Influence (FOCI)30 December 2013Foreign Ownership Control or Influence (FOCI)
ML21195A31030 December 2013Revision OL-25 to Final Safety Analysis Report, EA-13-237 Re Implementation of Additional Security Meassures and Fingerprinting for Unescorted AccessExemption Request
ML14002A19730 December 2013Callaway Plant - Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats; Inspection Report Number 05000483-2013405
ML13358A03024 December 2013Request for Additional Information, Relief Request I3R-15 Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection Interval
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
ULNRC-06057, Enclosure 2 to ULNRC-06057 - Amendment 28 LRA Change for LRA Annual Update and RAI Set 2820 December 2013Enclosure 2 to ULNRC-06057 - Amendment 28 LRA Change for LRA Annual Update and RAI Set 28Boric Acid
Ultimate heat sink
Fire Barrier
Hydrostatic
Coatings
Nondestructive Examination
Aging Management
Biofouling
EVT-1
Fire Protection Program
ML13354B81620 December 2013NRR E-mail Capture - Question for TS 3.7.9 UHS LAR
ML13360A30220 December 2013Enclosure 1 to ULNRC-06066, License Renewal Application, Request for Additional Information (RAI) Set #15 Responses Supplement to RAI B2.1.7-5AFunctionality Assessment
ULNRC-06066, Supplement to RAI B2.1-7-5a20 December 2013Supplement to RAI B2.1-7-5a
ML13360A27220 December 2013Annual Update to the Callaway License Renewal Application and Response to RAI Set #28Coatings
ML13360A27320 December 2013Enclosure 1 to ULNRC-06057, License Renewal Application - Request for Additional Information (RAI) Set #28 ResponsesUltimate heat sink
Coatings
Aging Management
Moisture barrier
Biofouling
ML13357A74819 December 2013Enclosure 1 to ULNRC-06060 - Request for Additional Information Set #5 ResponseHot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Locked High Radiation Area
Thermoset
Large early release frequency
Time Critical Operator Action
Earthquake
Maintenance Rule Program
Fire Protection Program
ML13224A19519 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Severe Accident Management Guideline
Frazil ice
Battery sizing
Earthquake
ML13351A10217 December 2013Notification of Generic Fundamentals Examinations for 2014Generic Fundamentals Examination
ULNRC-06064, Physical Security Plan, Revision 1116 December 2013Physical Security Plan, Revision 11
ML13345A03811 December 2013NRR E-mail Capture - Acceptance Review
TAC:MF280611 December 2013
ML13319A66811 December 2013Relaxation of the Schedular Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External EventsFukushima Dai-Ichi
ML13338A6449 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Callaway Plant, Unit 1, (TAC No. MF00772)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Severe Accident Management Guideline
Frazil ice
Battery sizing
Earthquake
TAC:MF32026 December 2013
ULNRC-06043, Application for Amendment to Facility Operating License Npf -30 (LDCN 13-0016) Revision to FSAR Standard Plant Section 3.6 for Hdpe Crack Exclusion6 December 2013Application for Amendment to Facility Operating License Npf -30 (LDCN 13-0016) Revision to FSAR Standard Plant Section 3.6 for Hdpe Crack ExclusionSafe Shutdown
Shutdown Margin
Ultimate heat sink
Internal Flooding
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Earthquake
Through-Wall Leak
ML13330A6892 December 2013Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 29Aging Management
IR 05000483/201320129 November 2013IR 05000483-13-201; October 22 - 24, 2013, Callaway Plant; Target Set Inspection - Cover LetterAffidavit
ULNRC-06052, Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements26 November 2013Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic RequirementsFukushima Dai-Ichi
TAC:MF010326 November 2013
ULNRC-06038, CFR 50.59 Summary Report26 November 2013CFR 50.59 Summary Report
ULNRC-06038, Callaway, Unit 1, 10 CFR 50.59 Summary Report26 November 2013Callaway, Unit 1, 10 CFR 50.59 Summary Report
ML13323A11125 November 2013Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
Cyber Security
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
Fire Protection Program
TAC:MF297021 November 2013
ULNRC-06056, Cycle 19 Commitment Change Summary Report21 November 2013Cycle 19 Commitment Change Summary ReportBiofouling
ML13318A12214 November 2013NRR E-mail Capture - FW: Callaway NFPA 805 LAR, Fpe RAI 20
ULNRC-06054, Facility Operating License NPF-30, Fitness for Duty Reports for Ameren Missouri Callaway Energy Center for 20138 November 2013Facility Operating License NPF-30, Fitness for Duty Reports for Ameren Missouri Callaway Energy Center for 2013Fitness for Duty
IR 05000483/20130047 November 2013IR 05000483-13-004; 07/01/2013 - 09/27/2013; Callaway Plant, Integrated Resident and Regional Report; Licensed Operator Requalification Program and Licensed Operator PerformanceBoric Acid
Ultimate heat sink
Water Inventory Control
Time to boil
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Earthquake
Biofouling
Offsite Circuit
Fire Protection Program
Power change
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13246A35031 October 2013NFPA-805 LAR F&O TableSafe Shutdown
Multiple Spurious Operation
ULNRC-06045, Response to Request for Additional Information Closure of Option 2 to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage31 October 2013Response to Request for Additional Information Closure of Option 2 to Address In-Vessel Mitigative Measures for Potential In-Vessel BlockageSevere Accident Management Guideline
ULNRC-06051, Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 3029 October 2013Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 30
ULNRC-06051, Operating Quality Assurance Manual (Oqam) Revision 3029 October 2013Operating Quality Assurance Manual (Oqam) Revision 30
ML13303B68828 October 2013Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30Safe Shutdown
Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
ULNRC-06051, Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 3028 October 2013Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30Safe Shutdown
Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
ML13298A13225 October 2013NRR E-mail Capture - Acceptance Review
ML13296A53023 October 2013NRR E-mail Capture - Callaway - Request for NFPA 805 License Amendment Factual Accuracy ReviewHot Short
Safe Shutdown
Boric Acid
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Large early release frequency
Hemyc
Earthquake
Continuous fire watch
Fire Protection Program
ML13291A04117 October 2013CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed ValvesBoric Acid
Hydrostatic
VT-2
ULNRC-06048, Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves17 October 2013Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed ValvesBoric Acid
Hydrostatic
VT-2
ULNRC-06048, Attachment 2 to ULNRC-06048, Piping and Instrumentation Drawings (P&Ids)17 October 2013Attachment 2 to ULNRC-06048, Piping and Instrumentation Drawings (P&Ids)
TAC:MF292117 October 2013
ML13290A51917 October 2013Notice of the Secretary Lifting Suspension of Adjudicatory Activity in the Matter of Callaway, Unit 1
ML13283A12610 October 2013Notice of the Secretary Regarding Agency Shutdown in the Matter of Callaway, Unit 1