Text
" " December 30, 2013
Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - TEMPORARY INSTRUCTION 2515/186, "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS;" INSPECTION REPORT NUMBER 05000483/2013405
Dear Mr. Heflin:
On December 5, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant facilities using Temporary Instruction 2515/186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." The enclosed inspection report documents the results of the inspection, which were discussed on December 5, 2013, with other members of your staff. A final exit meeting was conducted via telephone with T. Elwood, Regulatory Affairs Supervisor, on December 11, 2013.
The objective of this inspection was to assess the implementation procedures and processes of your Callaway Plant facilities that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commission's rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Based on results of this inspection, no NRC-identified or self-revealed findings were identified. However, one observation related to poor phone communications was identified by the inspectors which required additional attention by the licensee. This observation was of very low safety significance and was determined not to be violations of regulatory requirements.
If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Callaway Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.
Sincerely,/RA/ Clyde C. Osterholtz for Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-483 License: NPF-30 Nonpublic
Enclosure:
Inspection Report 05000483/2013405
w/Attachment:
Supplemental Information cc: Electronic Distribution for Callaway Plant ADAMS ACCESSION NUMBER: ML14002A197 Cover Letter Only Non Sensitive Publicly Available KDC SUNSI Review Complete Sensitive Non-Publicly Available Entire Report Non Sensitive Publicly Available Keyword: MD 3.4 Non-Public A.3 Sensitive Non-Publicly Available KDC OE:OB SOE:OB C:DRP/PB C:OB TFarina KClayton NO'Keefe VGaddy /RA/ /RA/ /RA/ /RA/ 12/18/2013 12/18/2013 12/26/2013 12/30/2013