Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110890726 | 31 March 2011 | Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality | Boric Acid Ultimate heat sink Fire Protection Program |
L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues | 31 March 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues | Aging Management Battery sizing |
L-2011-092, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Probabilistic Risk Assessment Issues | 31 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Probabilistic Risk Assessment Issues | Probabilistic Risk Assessment Large early release frequency |
ML110880676 | 29 March 2011 | Relocation of Cycle Specific Parameters to the Core Operating Limits Report License Amendment Request | |
L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues | 25 March 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues | Operating Basis Earthquake |
ML110840267 | 25 March 2011 | E-mail, EPU Regarding Vessels and Internals Integrity (Cvib) Requests for Additional Information - Round 2 | |
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | 23 March 2011 | Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | Decommissioning Funding Plan |
L-2011-070, Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Piping and Non-Destructive Examination Issues | 23 March 2011 | Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Piping and Non-Destructive Examination Issues | Boric Acid Nondestructive Examination Aging Management |
ML110820699 | 22 March 2011 | 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request | Internal Flooding Multiple Spurious Operation |
ML110770349 | 22 March 2011 | 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request | Internal Flooding Multiple Spurious Operation |
IR 05000250/2011301 | 22 March 2011 | Er 05000250-11-301 and 05000251-11-301, on March 4, 2011, Turkey Point Nuclear Plant, Units 3 and 4, Operator License Examination | |
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
ML110800536 | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown |
ML110770196 | 18 March 2011 | E-mail, EPU - Balance of Plant (Sbpb) Request for Additional Information - Round 1 | Ultimate heat sink Anticipated operational occurrence Turbine Missile |
L-2011-069, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Steam Generator Tube Integrity and Chemical Engineering (Csgb) Issues | 16 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Steam Generator Tube Integrity and Chemical Engineering (Csgb) Issues | Boric Acid Coatings Locked High Radiation Area |
L-2011-028, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Safety Analyses Issues - Round 1 | 16 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Safety Analyses Issues - Round 1 | Anticipated operational occurrence Power change |
ML110740598 | 16 March 2011 | Notice of Forthcoming Meeting with Florida Power & Light, Turkey Point, Units 3 & 4, to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review | |
IR 05000250/2011501 | 15 March 2011 | NRC Emergency Preparedness Inspection Report 05000250-11-501 and 05000251-11-501 | |
ML110730528 | 14 March 2011 | E-mail, EPU - PRA Licensing (Apla) Request for Additional Information - Round 1 | |
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 14 March 2011 | Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
ML110700021 | 11 March 2011 | Acceptance for Review of License Amendment Request for Extended Power Uprate | |
L-2011-079, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues - Round 2 | 9 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues - Round 2 | Cyber Security |
L-2011-029, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Materials Issues - Round 1 | 9 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Materials Issues - Round 1 | Hydrostatic Incorporated by reference Aging Management |
IR 05000250/2010503 | 9 March 2011 | NRC Emergency Preparedness Annual Inspection Report 05000250/2010503 and 05000251/2010503 | |
TAC:ME4549 | 8 March 2011 | ||
ML110630160 | 8 March 2011 | Correction of Amendment Nos. 243 and 239 Requirements Technical Specification Changes Related to Movement of Heavy Loads Over Spent Fuel | Shutdown Margin |
ML110630437 | 8 March 2011 | Request for Additional Information Regarding Amendment Application for Approval of the Cyber Security Plan | Cyber Security |
L-2011-083, Submittal of Reply to Notice of Violation | 8 March 2011 | Submittal of Reply to Notice of Violation | |
ML110610427 | 7 March 2011 | Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold | |
ML111930587 | 4 March 2011 | Initial Exam Retake 2011-301 Final Administrative JPMs | Boric Acid High Radiation Area Job Performance Measure |
ML110630210 | 4 March 2011 | Inspection/Activity Plan, Report 22, 03/01/2011 - 06/30/2012 | |
ML110630202 | 4 March 2011 | Annual Assessment Letter For Turkey Point Nuclear Plant, Units 3 and 4 - (NRC Inspection Report Nos. 05000250/2011001 and 05000251/2011001) | |
L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 | 3 March 2011 | Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 | Time Critical Operator Action Fire Protection Program Power Uprate |
L-2011-072, Proposed Changes to Technical Specifications Regarding D.C. Sources Surveillance Requirements License Amendment Request (LAR) No. 210 | 3 March 2011 | Proposed Changes to Technical Specifications Regarding D.C. Sources Surveillance Requirements License Amendment Request (LAR) No. 210 | Battery sizing |
ML110610719 | 2 March 2011 | Turkey Points, Units 3 and 4, EPU Electrical Engineering (Eeeb) Request for Additional Information - Round 1 | |
ML110620662 | 2 March 2011 | COL Hearing - FW: FPL Letter L-2011-082 Dated 02/28/2011 - Submittal of the Groundwater Model Report Revision 1 | |
ML110600617 | 1 March 2011 | E-mail, EPU Instrumentation and Controls (Eicb) Request for Additional Information - Round 2 | |
L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 | 28 February 2011 | WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 | Fuel cladding |
ML110590491 | 28 February 2011 | Letter as Required by Title 10, Code of Federal Regulations, Part 20, Section 20.405, to Report an Incident in Which an Employee Received 3,280 Millirem-Whole Body Gamma Exposure During First Quarter of 1973 as Reported by Film Badge Proces | Aging Management |
IR 05000250/2011403 | 25 February 2011 | IR 05000250-11-403, 05000251-11-403, on 01/27/2011, Turkey Point Nuclear Power Plant - NRC Physical Security Inspection.= | Affidavit |
ML110340067 | 25 February 2011 | Issuance of Amendments Regarding Technical Specification Changes Related to Movement of Heavy Loads Over Spent Fuel | Safe Shutdown Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment Control of Heavy Loads |
L-2011-077, Annual Report of Reactor Coolant Specific Activity Limits | 25 February 2011 | Annual Report of Reactor Coolant Specific Activity Limits | |
L-2011-045, 2010 Annual Radioactive Effluent Release Report, for the Period of January 1, 2010, Through December 31, 2010 | 25 February 2011 | 2010 Annual Radioactive Effluent Release Report, for the Period of January 1, 2010, Through December 31, 2010 | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Incorporated by reference Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2011-067, 2010 Annual Fitness for Duty Performance Report | 24 February 2011 | 2010 Annual Fitness for Duty Performance Report | Fitness for Duty |
L-2011-032, Turkey Point, Units 3 and 4 - Supplement 1 to Fuel Storage Criticality Analysis | 22 February 2011 | Turkey Point, Units 3 and 4 - Supplement 1 to Fuel Storage Criticality Analysis | |
ML110560335 | 22 February 2011 | Supplement 1 to Fuel Storage Criticality Analysis | |
L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues | 22 February 2011 | Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues | Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Fire Protection Program |
TAC:ME5721 | 21 February 2011 | ||
L-2011-006, License Amendment Request No. 209; Relocation of Cycle Specific Parameters to the Core Operating Limits Report (COLR) | 21 February 2011 | License Amendment Request No. 209; Relocation of Cycle Specific Parameters to the Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin Anticipated operational occurrence |