ML110600617

From kanterella
Jump to navigation Jump to search
E-mail, EPU Instrumentation and Controls (Eicb) Request for Additional Information - Round 2
ML110600617
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/01/2011
From: Jason Paige
Plant Licensing Branch II
To: Abbatiello T
Florida Power & Light Co
Paige, Jason C, NRR/DORL,301-415-5888
References
Download: ML110600617 (1)


Text

From: Paige, Jason Sent: Tuesday, March 01, 2011 10:46 AM To: tom.abbatiello@fpl.com Cc: jack.hoffman@fpl.com; Abbott, Liz; Tiemann, Philip; Tomonto, Bob

Subject:

Turkey Point EPU - Instrumentation and Controls (EICB) Request for Additional Information - Round 2

Tom, Below are requests for additional information (RAIs) regarding the Turkey Point extended power uprate license amendment request. On March 1, 2011, you stated that a call is not needed to discuss the draft RAIs sent to you via email. The below RAIs reflect the questions that were sent to you and agreed upon by Florida Power & Light Company (FPL). FPL agreed upon providing its responses within 30 days of the date of this email. If you have any questions, feel free to contact me.

EICB-2.1 By letter dated January 28, 2011, the licensee provided a table with Maximum MWt for each LEFM OOS condition in page 10 of RAI response (FPL L-2011-005 Attachment 1) and stated that those values have been truncated to provide conservative values. However, all the four Maximum MWt values in the table are one MWt higher than allowable values calculated by the NRC staff. Those values should be calculated with the base of 2599 MWt (2300MWt

  • 1.13 = 2643 MWt). Confirm that you agree to revise those four Maximum MWt values (to 2643.0, 2640.0, 2639.0, 2638.0) or provide justification with detailed calculations for using one MWt higher.

EICB-2.2 Section 2.4.4.2.2, I.4 System Maintenance (pages 2.4.4-5 and 2.4.4-6) addresses NRC RIS 2002-03 item I.1.F.ii controlling software and hardware configuration. The licensee briefly addressed hardware configuration, however, the licensee does not mention the plant software configuration program of the Cameron LEFM CheckPlus system. Provide a brief description of your plant configuration programs and address how you control the software configuration at the plant.

Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888