Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110960072 | 31 March 2011 | Guarantee of Payment of Deferred Premiums - 2010 Annual Report | |
ML110960590 | 31 March 2011 | Response to Notice of Non-Cited Violations - Failure to Use Worst Case 6900 Vac Bus Voltage in Design Calculations. | Backfit |
ML110960073 | 31 March 2011 | Submittal of Decommissioning Funding Status Report | |
ML110900187 | 29 March 2011 | Submittal of Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050015 Sector 0 Exceedance of the Benchmark Monitoring Requirement | |
ML11112A131 | 24 March 2011 | Transmittal of Final Report for 11/17/2010, Sequoyah Nuclear Power Plant Excercise. Report Addresses the Evaluation of the Offsite Response Plans and Preparedness for the State of Tennessee and the Affected Local Governments | |
ML110840065 | 23 March 2011 | Tennessee Multi-Sector General Permit Annual Storm Water Monitoring Report for 2010 | Grab sample |
ML110831044 | 21 March 2011 | Tennessee Valley Authority - Re-submittal of Attachments for Responses to Hydrology Action Items | |
NRC-2011-0013, Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013) | 18 March 2011 | Comment (12) of R. M. Krich, on Behalf of TVA, on Draft Regulatory Issues Summary, Adequacy of Station Electric Distribution System Voltages, (Docket Id NRC-2011-0013) | |
ML110730685 | 9 March 2011 | Sequoyah Nuclear Plant, NRC Emergency Annual Preparedness Inspection Report 05000327-10-502 and 05000328-10-502 | |
IR 05000327/2010502 | 9 March 2011 | ||
ML110690021 | 8 March 2011 | Submittal of Discharge Monitoring Report for February 2011 | Veliger |
ML110540131 | 8 March 2011 | Units 1 & 2, Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6 | Cyber Security |
TAC:ME4957 | 8 March 2011 | ||
ML110630352 | 4 March 2011 | Annual Assessment Letter - Sequoyah Nuclear Plant (Report 05000327-11-001 & 05000328-11-001) | |
ML110630354 | 4 March 2011 | Inspection / Activity Plan, Report 22 | |
ML110660596 | 2 March 2011 | National Pollutant Discharge Elimination System Permit No. TN0026450 Approved Changes | Grab sample |
ML110660590 | 2 March 2011 | Annual 2011 Independent Spent Fuel Storage Installation Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML110610737 | 28 February 2011 | Tennessee Valley Authority - Fitness for Duty Annual Program Performance Data, January Through December 2010 | Fitness for Duty |
ML110610738 | 25 February 2011 | Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing Errors | Fitness for Duty |
ML110600701 | 25 February 2011 | Tennessee Valley Authority - Sequoyah Nuclear Plant - Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNRO50015 Sector 0 Exceedance of the Benchmark Monitoring Requirement | |
ML110600410 | 25 February 2011 | Units 1 & 2 - Request for Extension for Time to Respond to Non-Cited Violations 05000327, 05000328-10-005-03, Failure to Use Worst Case 6900 Vac Bus Voltage in Design. | |
ML110480481 | 15 February 2011 | Registration of Use of Cask to Store Spent Fuel | |
ML110470405 | 14 February 2011 | Cycle 17 - 90-Day Inservice Inspection Summary Report | |
ML110470406 | 14 February 2011 | Service List Change Update | |
ML110420318 | 11 February 2011 | Notification of Licensed Operator Initial Operating Retake Examination | |
ML110420123 | 9 February 2011 | Discharge Monitoring Report for January 2011 | Veliger |
ML13289A199 | 9 February 2011 | SQN Annual Water Withdrawal Updates for January 2011 | |
ML110390345 | 4 February 2011 | Initial Exam 2010-302 General Correspondence | Fitness for Duty Met Tower Job Performance Measure |
ML110390365 | 4 February 2011 | Initial Exam 2010-302 Final Simulator Scenarios | Safe Shutdown Boric Acid Shutdown Margin Stroke time Hydrostatic Preplanned Activity Pressure Boundary Leakage Fire Protection Program Fire Watch Power change Coast down Unidentified leakage |
ML110390359 | 4 February 2011 | Initial Exam 2010-302 Final RO and SRO Written Exam | Shutdown Margin Grab sample Post Accident Monitoring |
ML110390352 | 4 February 2011 | Initial Exam 2010-302 Final Administrative Documents | Boric Acid Job Performance Measure |
ML11307A424 | 4 February 2011 | Bellefonte, Unit 1 - Re-submittal of Attachments for Responses to Hydrology Action Items | |
ML110350624 | 4 February 2011 | Initial Exam 2010-302 Draft Administrative JPMs | Safe Shutdown Boric Acid High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Stroke time Met Tower Locked High Radiation Area Job Performance Measure Earthquake Deep Dose Equivalent Fatigue Rule Pressure Boundary Leakage Power change Coast down |
ML110350623 | 4 February 2011 | Initial Exam 2010-302 Draft Sim-In Plant JPMs | Shutdown Margin Offsite Dose Calculation Manual VT-2 Job Performance Measure Power change Siren |
ML110350617 | 4 February 2011 | Initial Exam 2010-302 Draft Simulator Scenarios | Safe Shutdown Boric Acid Shutdown Margin Stroke time Pressure Boundary Leakage Fire Protection Program Fire Watch Hourly Fire Watch Power change Coast down Unidentified leakage |
ML110350603 | 4 February 2011 | Initial Exam 2010-302 Draft SRO Written Exam | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level Loop seal Grab sample Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Pressure Boundary Leakage Power change Fatality |
ML110350599 | 4 February 2011 | Initial Exam 2010-302 Draft RO Written Exam | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Grab sample Post Accident Monitoring Annual Radioactive Effluent Release Report B.5.b Mitigating Strategies Overtravel Fuel cladding Power change |
ML110350577 | 4 February 2011 | Initial Exam 2010-302 Draft Administrative Documents | Boric Acid |
ML110390369 | 4 February 2011 | Initial Exam 2010-302 Final Simulator/Inplant JPMs | Boric Acid Shutdown Margin VT-2 Job Performance Measure Power change Siren |
ML110390422 | 4 February 2011 | Initial Exam 2010-302 Final Administrative JPMs | Boric Acid Shutdown Margin High Radiation Area Met Tower Locked High Radiation Area Job Performance Measure Deep Dose Equivalent Fatigue Rule Scaffolding Power change Coast down |
ML110390425 | 4 February 2011 | Initial Exam 2010-302 Post Exam Comments | Fitness for Duty Shutdown Margin Job Performance Measure |
ML13289A167 | 2 February 2011 | Issuancee of NPDES Permit #TN0026450, TVA-Sequoyah Nuclear Plant, Soddy Daisy, Hamilton County, Tennessee | Grab sample |
ML13289A097 | 2 February 2011 | NPDES Permit No. TN0026450 Soddy Daisy, Hamilton County, Tennessee | Grab sample |
ML110340058 | 31 January 2011 | 2010 Biocide/Corrosion Treatment Plan (B/Ctp) Annual Report - NPDES Permit No. TN0026450 | |
IR 05000327/2010005 | 28 January 2011 | IR 05000327-10-005, 05000328-10-005; 10/01/2010 - 12/31/2010; Sequoyah Nuclear Plant, Units 1 and 2; Fire Protection, and Other Activities | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Enforcement Discretion VT-2 Emergency Lighting Locked High Radiation Area Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Foreign Material Exclusion Process Control Program Moisture barrier Fire Protection Program Scaffolding Substantial potential for overexposure Power change Unidentified leakage |
ML110280459 | 28 January 2011 | IR 05000327-10-005, 05000328-10-005; 10/01/2010 - 12/31/2010; Sequoyah Nuclear Plant, Units 1 and 2; Fire Protection, and Other Activities | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Internal Flooding Hydrostatic Enforcement Discretion VT-2 Emergency Lighting Locked High Radiation Area Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Foreign Material Exclusion Process Control Program Moisture barrier Fire Protection Program Scaffolding Substantial potential for overexposure Power change Unidentified leakage |
ML110260450 | 28 January 2011 | Summary of January 26, 2011, Meeting Slides | |
ML110260392 | 28 January 2011 | Summary of January 26, 2011, Public Meeting with Tennessee Valley Authority (TVA) Regarding Steam Generator Replacement Project at Sequoyah Nuclear Plant, Unit 2 | |
ML13289A172 | 27 January 2011 | NPDES Permit No. TN0026450 - Annual Water Withdrawal Update | |
ML110310009 | 27 January 2011 | Tennessee Valley Authority (TVA) - Sequoyah Nuclear Pant (SQN) - NPDES Permit No. TN0026450 - Annual Water Withdrawal Update |