Text

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 October 6, 2010 ES-501 Mr. Richard S. Baldwin U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suitel200 Atlanta, Georgia 30303-1 257 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Reactor Operator and Senior Reactor Operator Initial Examinations -

05000327/201 0302 and 05000328/2010302

References:

1. NRC letter to TVA, Notification of Licensed Operator Initial Examination 05000390/2010302, dated May 7, 2010
2. NRC letter to TVA, Operator Licensing Written Examination Approval 05000390/2010301, dated September 27, 2010 As authorized by Reference 2, the Tennessee Valley Authority (TVA) administered a written examination to a group of licensed operator applicants on September 29, 2010. In accordance with Examination Standard (ES) 501, Initial Post-Examination Activities, of NUREG 1021, Operator Licensing Examination Standards for Power Reactors, the enclosures contain information related to the examination as listed:

Enclosure 1 the ungraded written examinations (i.e., each applicants original answer and examination cover sheets). Since TVA did not formally grade the exams, a completed Form ES-403-1, Written Examination Grading Quality Checklist, is not being provided.

Enclosure 2 clean copy of each applicants answer sheet.

Enclosure 3 the master examination(s) and answer key(s), annotated to indicate any changes made while administering and grading the examination(s).

Printed on recycled paper -

U.S. Nuclear Regulatory Commission Page 2 October 6, 2010 Enclosure 4 any questions asked by and answers given to the applicants during the written examination (ES-402).

Enclosure 5 any substantive comments made by the applicants following the written examination, with an explanation concerning why the comment was accepted or rejected (ES-402).

Enclosure 6 the written examination seating chart (ES-402).

Enclosure 7 the results of the written examination performance analysis that was performed, with recommended substantive changes (ES-403).

Enclosure 8 original Form(s) ES-201-3, Examination Security Agreement, the Examination Security Agreement Form ES-201 -3 will be provided after obtaining the post-examination signatures.

Enclosure 9 request for a correction to the SRO ADMIN D JPM answer key with supporting documentation.

Because of the administratively confidential nature of the enclosed material, it is requested that the information contained in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6). There are no commitments contained in this submittal. TVAs principal contact regarding Operations Training matters is Mike Buckner.

Should you require additional information regarding this matter, please contact Mr. Buckner at (423) 843-4208 or contact Beth A. Wetzel at (423) 843-7170.

Sincerely, Christopher R. Church Site Vice-President Sequoyah Nuclear Plant

U.S. Nuclear Regulatory Commission Page 3 October 6, 2010 BAW:JWP:SKD Enclosures Bcc (w/o Enclosures):

C. R. Church, POB 2B-SQN C. T. Ware, STC 2H-SQN R. M. Krich, LP 4G-C J. R. Parker, STC 2A-SQN (with Enclosures)

P. R. Simmons, POB 2A-SQN B. A. Wetzel, OPS 4C-SQN EDMS, WT CA-K (with Enclosures)

I: Operator License\2010\ Post Exam Information 100510

4 $

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 June 11,2010 10 CFR 55.5 10 CFR 55.49 Mr. Luis A. Reyes Regional Administrator Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Attention: Mr. M. T. Widmann Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Subject Reactor and Senior Reactor Operator Initial Examinations -

0500032712010302 and 0500032812010302 As requested by NRCs letter to the Tennessee Valley Authority dated May 7, 2010, the enclosure to this letter provides the license examination information for the Sequoyah Nuclear Plant (SQN) Reactor and Senior Reactor Operator operating test scheduled to be administered the weeks of September 6, 2010 and September 20, 2010. The written examination is scheduled to be administered the week of September 29, 2010. The outlines, examinations and tests have been approved by an authorized SQN representative.

There are no commitments contained in this submittal. In accordance with 10 CFR 55.49 and NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, appropriate measures have been taken to ensure examination integrity and security.

Accordingly, it is requested that this letter and the enclosed documents be withheld from public disclosure until the examinations are completed.

Pedairecydedpeper

U.S. Nuclear Regulatory Commission Page 2 June 11,2010 TVAs principal contact regarding the license examinations is Mr. Michael Buckner, SQN Operations Training. Should you require additional information regarding this matter, please contact Mr. Buckner at (423) 843-4178 or Beth A. Wetzel at (423) 843-7170.

Sincerely, Site Vice-President Sequoyah Nuclear Plant

Enclosure:

Operating Examinations for Reactor Operator and Senior Reactor Operator Candidates

U.S. Nuclear Regulatory Commission Page 2 June 11,2010 N RT: SKD cc: R. M. Cook, LP 4K-C (wlo enclosure)

R. M. Krich, LP 4K-C (wlo enclosure)

K. Langdon, POB 2B-SQN (w/o enclosure)

P. R. Simmons, POB 2A-SQN, (wlo enclosure)

C. T. Ware, STC 2H-SQN EDMS, WT CA-K Operator Iicense\2010\Examination and Requested information 061410

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNITS I AND 2 OPERATING EXAMINATIONS FOR REACTOR OPERATOR (RO)

AND SENIOR REACTOR OPERATOR (SRO) CANDIDATES License Examinations Outlines:

ES-201-2 Examination Outline Quality Checklist ES-201-3 Examination Security Agreement ES-301-I Administrative Topics Outline ES-301-2 Control Roomlln-Plant Systems Outline ES-301-5 Transient and Event Checklists (7)

ES-D-I Scenario Outlines (7)

ES-401-4 Record of Rejected KIAs for RO and SRO exams Written Exam Outline Development Methodology

Tennessee Valley Authority, Post Office Box 2000. Soddy-Daisy, Tennessee 37384-2000 July 21, 2010 10 CFR 55.5 10 CFR 55.49 Mr. Luis A. Reyes Regional Administrator Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Attention: Mr. M. T. Widmann Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Reactor and Senior Reactor Operator Initial Examinations -

05000327/2010302 and 05000328/2010302 As requested by NRCs letter to Preston D. Swafford dated May 7,2010, the enclosure to this letter provides the information for the Reactor and Senior Reactor Operator initial examinations scheduled to be administered the weeks of September 13, 2010, and September 20, 2010. The written part of the examination is scheduled to be administered the week of September 27, 2010.

There are no commitments contained in this submittal. In accordance with 10 CFR 55.49 and NUREG 1021, Operator Licensing Examination Standards for Power Reactors, appropriate measures have been taken to ensure examination integrity and security.

Accordingly, it is requested that the enclosed documents be withheld from public disclosure until the examinations are completed.

TVAs principal contact regarding the license examinations is Steve Smith, SQN Operations Training. Should you require additional information regarding this matter, please contact Mr. Smith at (423) 843-4107 or Beth A. Wetzel at (423) 843-7170.

Sincerely, ChristopKer R. Church Site Vice President Sequoyah Nuclear Plant

Enclosure:

Operating Examinations for Reactor Operator and Senior Reactor Operator Candidates Printed on recycled paper

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 OPERATING EXAMINATIONS FOR REACTOR OPERATOR (RO)

AND SENIOR REACTOR OPERATOR (SRO) CANDIDATES Written Examination RO and SRO Portions Including Student Reference Material and Answer Key Job Performance Measures for RO and SRO Examinations Seven Simulator Examinations ES-201-3 Examination Security Agreement Updates ES-301-2 Control Roomlln-Plant Systems Outline ES-301-2 Supplemental Control Roomlln-Plant Systems Outline ES-301-3 Operating Test Quality Checklist ES-301-4 Simulator Scenario Quality Checklist ES-301-5 Transient and Event Checklist ES-301-6 Competencies Checklist ES-401-6 Written Examination Quality Checklist Requested reference materials as agreed with the Chief Examiner

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNITS I AND 2 Reactor Operator and Senior Reactor Operator nitiaI Examinations Supplemental Substantive Comments (ES-402)

JPM SRO Admin D Page 1 of 9 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE SROADMIND Classify the Event per the REP (SGTR with Failed SIG Safety)

JPM SRO Admin D Page 2 of 9 Rev. 0 ROISRO JOB PERFORMANCE MEASURE Task: Classify the Event per the REP (SGTR with Failed SIG Safety)

Task #: (SRO) 3440030302; (SRO) 3440190302 Task Standard: The event is classified as a GENERAL EMERGENCY based on Loss of 3 fission barriers (SGTR with Failed SIG Safety).

Time Critical Task: YES: X NO:

K/A Reference/Ratings: 2.4.38 (2.4/4.4) 2.4.44 (2.4/4.4)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator In-Plant Classroom X Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

JPM SRO Admin D Page 3 of 9 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments
3. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Tools/Equipment/Procedures Needed:

EPIP-1 thru EPIP-5, for each student in classroom FR Procedures Steam Tables, for each student in classroom Clock must be available in classroom that all exam inees and evaluator can see

References:

Reference Title Rev No.

1. EPIP-1 Emergency Plan Classification Matrix 43
2. EPIP-5 General Emergency 39 READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be performed in a classroom or in the simulator (simulator will not be set up to match the scenario). The evaluator will provide initiating cues and any other data that may be needed. Time begins when directed by evaluator. When the declaration has been made, raise your hand, the evaluator will record the time, and then you may continue the procedure. Raise your hand again when you have completed the TVA Initial Notification Form, to the point of notifying the ODS. If during the performance of the JPM you have any questions raise your hand and the evaluator will assist you.

INITIAL CONDITIONS:

1. Unit 2 is at 100% RTP and stable.
2. Unit 1 has experienced a Reactor trip and Safety Injection.
3. Security reports that at the time of the trip, steam started blowing from the roof of the Unit I east valve vault and steam flow is still in progress at this time.
4. Steam Generator #2 is isolated per E-3, Steam Generator Tube Rupture.
5. CR0 has informed you that SG #2 pressure is slowly lowering.
6. Containment pressure is 0.1 psig and steady.
7. RCS pressure is 1500 psig.
8. Core exit TCs 532 °F and slowly rising.
9. The most recent Chem Lab sample of RCS indicates that RCS activity has risen to 345 pCi/gm Equivalent Iodine-i 31.
10. Emergency Paging System (EPS) is not available in MCR.
11. There are no indications of an Onsite Security Event.

INITIATING CUES:

1. You are the Unit 1 US and have assumed the duties of the SED position, until the TSC is staffed.
2. You are to perform each of the following:
a. Classify this event per EPIP-1 and
b. Fill out TVA Initial Notification Form and make Protective Action Recommendations, if any.

This is a time critical JPM, Time begins when directed by evaluator.

JPM SRO Admin D Page 4 of 9 Rev. 0 Job Performance Checklist:

STEP I STANDARD SAT I UNSAT STEP 1.: Refers to EPIP-1 to detveI o event SAT UNSAT STANDARD: Operator refers to EPIP-1, Section 1, Fission Product Barrier Matrix. Operator determines that they have met the conditions of: Critical Ste p 1.1.2 Loss, Primary Coolant Activity Level Task Start 1.2.3 Loss, SGTR Time 1.3.4 Loss, Containment Bypass Declaration of event must be made in 15 minutes from the time the task was accepted.

Record Time of Declaration:_________________

Time from Task Acceptance to Declaration:____________

Utilizing Emergency Class Criteria, operator determines the need to declare a General Emergency based on Loss of all 3 barriers.

Time of declaration is recorded when the operator raises his/her hand.

This is a critical step to arrive at the correct classification within 15 minutes.

COMMENT:

STEP 2.: Implements EPIP-5 GENERAL EMERGENCY, section 3.1, SAT

[1] If TSC is OPERATIONAL, (SED transferred to TSC), THEN GOTO. UNSAT STANDARD: Operator should recall that the TSC has not been manned per the initiating cues, N/As this step and moves on to the next step.

COMMENT:

STEP 3. [2] RECORD time of declaration. TIME SAT NOTE: Operator may have already stated time of declaration, but must enter UNSAT time properly in EPIP-5 form.

STANDARD: Operator enters proper time that declaration was made.

COMMENT:

JPM SRO Admin D Page 5 of 9 Rev. 0 Job Performance Checklist:

STEPISTANDARD SATIUNSAT Evaluator Note: Candidate may choose to N/A entire step based on Initiating Cue of EPS not available, if so then N/A JPM step 4 and go to JPM step 9. If step 3 is completed then the following will apply.

STEP 4.: [3] Activate Emergency Paging System (EPS). SAT UNSAT STANDARD: Operator recalls from initial conditions, that EPS is not available from the control room, N/As step and continues on to next step.

COMMENT:

STEP 5.: [3] Activate Emergency Paging System (EPS). SAT

[a] IF EPS has already been activated, then go to step 4.

UNSAT STANDARD: Operator recalls from initial conditions, that EPS has not been previously activated and N/As step.

COMMENT:

STEP 6.: [3] Activate Emergency Paging System (EPS). SAT

[b] If ongoing onsite Security events may present risk to the emergency responders, Then consult with Security to determine if UN AT site access is dangerous to the life and health of emergency responders.

STANDARD: Operator recalls from initial conditions, that there are no site security threats present and N/As step.

COMMENT:

STEP 7.: [3] Activate Emergency Paging System (EPS). SAT

[c] If ongoing events makes site access dangerous to the life and health of emergency responders, Then select staging area button IJNSAT on the EPS terminal INSTEAD of the EMERGENCY button.

STANDARD: Operator recalls from initial conditions, that EPS system not available, so N/As step.

COMMENT:

JPM SRO Admin D Page 6of9 Rev. 0 Job Performance Checklist:

STEP I STANDARD SAT I UNSAT STEP 8.: [3] Activate Emergency Paging System (EPS). SAT

[ci ACTIVATE EPS using touch screen terminal. IF EPS fails to activate, THEN continue with step 4. UNSAT STANDARD: Operator recalls from initial conditions, that EPS system not available, so N/As step.

COMMENT:

STEP 9.: [4] EVALUATE PThnRecomrnsndations SAT APPfld1X.

UNSAT STANDARD: Operator determines from Appendix B, logic chart in EPIP-5, Note Critical Step 1: if conditions are unknown then answer is NO, then appropriate protective action recommendation is RECOMMENDATION 2.

This step is critical to arrive at the correct PAR recommendation COMMENT:

JPM SRO Admin D Page 7 of 9 Rev. 0 Job Performance Checklist:

STEP ISTANDARD SAT IUNSAT Evaluator Note: When candidate raises their hand to ask for MET tower data, hand them a copy of the MET TOWER LINK data sheet for their use in developing the affected_sectors_for_Protective_Action_Recommendations.

STEP 10.: f 5j Complete Appendix P.:.W,.In itiaI N0 fificatlo SAT

EmergeflCY UNSAT STANDARD: Operator completes the Appendix C through step 8, using information from turnover sheet and EPIP-1, prior to Notifying the ODS. Critical Step
1. This is a Drill
2. This is [Their name, Shift Manager (SED) Sequoyah has declared a General Emergency affecting Unit 1.
3. EAL Designators: LOSS 1.1.2 and LOSS 1.2.3, and LOSS 1.3.4.
4. Brief description of incident: [Primary Coolant Activity Level, SGTR AND Containment BypassJ.
5. Radiological Conditions [Releases above federally approved limits or Release information not known] (either is correct)
6. Event Declared: [Time and Date]
7. Meteorological Conditions are: Wind direction at 46 meters

[Southwest at 231 degrees] AND wind speed at 46 meters [6.1 mph] (wind speed not critical) (from Met Tower Data; 46 meters; 15 minute average readings)

8. Protective Action Recommendation: [2 Evacuate 2 mile radius and 5 miles downwind A-I, B-I, C-I, D-1, B-2, B-5, and shelter remainder of 10 mile EPZ], consider issuance of POTASSIUM IODIDE in accordance with the State Plan.
9. Please repeat back the information you have received to ensure accuracy.
10. Fax information to ODS This is a critical step to ensure information is accurate.

COMMENT:

JPM SRO Acimin D Page 8 of 9 Rev. 0 Job Performance Checklist:

STEP I STANDARD SAT I UNSAT STEP 11.: [6] Notify ODS. SAT UNSAT NOTE: Evaluator Enter time call is made to the ODS Critical Step Time from Declaration (step 1) to ODS Notification________

Stop Time:

STANDARD: Candidate raises their hand as signal that they have completed TVA initial Notification form and are ready to Notify the ODS.

ODS should be notified within 10 mm after declaration of the event.

This is a critical step to (complete forms within 10 mm) to ensure required notifications are completed within required time.

Cue: This completes the JPM.

COMMENTS:

READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be performed in a classroom or in the simulator (simulator will not be set up to match the scenario). The evaluator will provide initiating cues and any other data that may be needed. Time begins when directed by evaluator. When the declaration has been made, raise your hand, the evaluator will record the time, and then you may continue the procedure. Raise your hand again when you have completed the TVA Initial Notification Form, to the point of notifying the ODS. If during the performance of the JPM you have any questions raise your hand and the evaluator will assist you.

INITIAL CONDITIONS:

1. Unit 2 is at 100% RTP and stable.
2. Unit 1 has experienced a Reactor trip and Safety Injection.
3. Security reports that at the time of the trip, steam started blowing from the roof of the east valve vault and steam flow is still in progress at this time.
4. Steam Generator #2 is isolated per E-3, Steam Generator Tube Rupture.
5. CR0 has informed you that SG #2 pressure is slowly lowering.
6. Containment pressure is 0.1 psig and steady.
7. RCS pressure is 1500 psig.
8. Core exit TCs 532 °F and slowly lowering.
9. The most recent Chem Lab sample of RCS indicates that RCS activity has risen to 345 pCi/gm Equivalent Iodine-i 31.
10. Emergency Paging System (EPS) is not available in MCR.

11 .There are no indications of an Onsite Security Event.

INITIATING CUES:

1. You are the Unit 1 US and have assumed the duties of the SED position, until the TSC is staffed.
2. You are to perform each of the following:
a. Classify this event per EPIP-1 And
b. Fill out TVA Initial Notification Form and make Protective Action Recommendations, if any.

This is a time critical JPM, Time begins when directed by evaluator

Based on recently discovered data the following correction to SRO Admin D, Classify the Event per the REP (SGTR with Failed SG Safety), answer key is requested. From the original answer key, the following items were inadvertently identified as the expected data that would be entered on the EPIP-5, General Emergency, Appendix C TVA Initial Notification of General Emergency:

Line 4 Brief description of the Event: was initially identified as critical, however as identified on TRN-1 1.10, Annual Requalification Examination Development Documentation, Appendix M, the EAL designator is the critical part of the event notification form since these numbers would be used by the outside agencies to correctly determine the events in progress. This is explained on page 2 of Appendix M, Item E. The brief description, although helpful, is not used to identify the event(s) in progress. Thus line 4 would not be critical data and constitute a failure for the Shift manager.

Line 5 With the dose equivalent 1-131 level given in the Initial Conditions (345 pCi/gm) it would be reasonable that either Release above federally approved limits or Release information not known could be checked during the initial notification. This would apply to both Airborne Release Offsite and Liquid Release Offsite columns. The original key only had Release information not known column checked. Either of these boxes checked is acceptable and would be considered a correct response.

Line 7 the original Wind Direction is FROM value was incorrectly identified as the instantaneous wind speed at 46 meters vs the 15 minute average speed used by the Shift Manager when using ICS data to identify the sectors which could be affected by a release from the site during an accident. Also, the wind speed was inadvertently identified as critical data when filling out the notification form. Since it is only wind direction that is required to correctly identify the affected sectors, not the speed of the wind, the wind speed is for information only but is not required (critical) data. Also, as indicated on Appendix M, Item F, Minor discrepancies in the wind speed and direction provided on the emergency notification forms need not count as a missed notification opportunity provided the discrepancy would not result in providing an incorrect PAR. Therefore, the correct answer key for line 7 would be the 15 minute average wind direction at 46 meters [critical data] and the same elevation wind speed would be information only, [not critical].

I, SEQUOYAH GENERALEMERGENCY EPIP-5 A

Appendix C TVA INITIAL NOTIFICATION OF GENERAL EMERGENCY

1. This is a Drill LI This is an Actual Event - Repeat This is an Actual Event
2. This is Sequoyah has declared a GENERAL EMERGENCY affecting: Unit 1 LI Unit 2 fl Both Unit 1 and Unit 2
3. EAL Designator(s): I. I. 21 L i,. q (c-i E. .3 4dLi.
4. Brief Description ofthe Event: (.r i1c4 y

4 , S-rad

- I

5. Radiological Conditions: (Check one under both Airborne and Liquid column.)

Airborne Releases Offsite Liquid Releases Offsite Minor releases within federally approved 1 limits LI Minor releases within federally approved limits 1 Releases above federally approved limits 1 Releases above federally approved limits 1

)j Release information not known Release information not known Tech Specs) 1 (1Tech Specs)

6. Event Declared: Time: uate:
7. The Meteorological Conditions are: (Use 46 meter data from the Met Tower)

Wind Direction is FROM: 3 j degrees Wind Speed: 3 m.p.h

8. Provide Protective Action Recommendation: (Check either 1 or 2 or 3.)

Recommendation I R R Jj Recommendation 2 FRM EVACUATE LISTED SECTORS (2 mile

  • EVACUATE LISTED SECTORS (2 mile Radius E
  • Radius and 5 mile downwind) and 10 miles downwind) DIRECTION
  • SHELTER remainder of 10 mile EPZ
  • SHELTER remainder of 10 mile EPZ Utem, 7 CONSIDER ssuoncc of POTASSIUM
  • CONSiDER issuance of POTASSIUM IODIDE in ar IODIDE in accordance with the State accordance with the State Plan. 2 Plan.

A-i, B-i, C-i, D-i, C-2,-6, -7, -8, 0-2-3-5, -6 12-49 A-i, B-i, C-i, D-l, C-2, D-2 A-i, B-i. C-i. 0-i, D-2, -3. -4, 6 50-70 A-i, B-i, C-i, D-1, D-2 ALl, B-i, C-i, 0-1, A-3, -4, 0-2, -3, -4, -5 71 - 112 A-i, B-i, C-i, D-1. A-3, 0-2 A-i, B-i, C-i, D-1, A-2, 4, 6, 0-4 113- 146 A-i, B-i, C-i, 0-i, A-2,A-3, A-i, B-i, C-i. 0-i, A-2, -3, -4, -5, -6, B-2 147- 173 A-i, B-i, C-i, D-i, A-2, A-3, B-2 A-i, B-i. C-i, D-i, A-2, -5, -6, B-2, -3, -4 174- 214 A-i, B-i, C-i, D-i, A-2, B-2, A-lB-iC-iD-i. B-2.B-5.

A-lB-iC-iD-i, B-2.-3,-4,-5-6,-7,-8 215-258 X A-i, S-i. C-i, 0-i, 8-2-3, -5, 7-8, C-2,-3, -4, -5, -6 259- 331 A-i, B-i, C-i, D-i, B-2, B-5, C-2 A-i. B-i, C-i. 0-i, B-5, C-2. -3, -4, -5, 7-8 332-il A-i, B-i, C-i, D-i. B-5, C-2 LI Recommendation 3 SHELTER all sectors.

CONSIDER issuance of Potassium Iodide in accordance with the State Plan.

9. Please repeat back the information you have received to ensure accuracy. LI
10. When completed, FAX this information to the ODS or TEMA as required by Sections 3.1 or 3.2. LI FORWARD COMPLETED PROCEDURE TO PAGE 15 of 16 REVISION 39 EMERGENCY PREPAREDNESS MANAGER

mM[TEQROLOGIAL DATA r frei iarrris Graphs Trer Points 2oonLayers Priit Help PRINT PROCESSING print request submitted to PRINTBW 10AUG2010 16:21:54 SELECT FUNC. KEY OR TURNON CODE METDATA > SCHPZI 0 MET-TOWER LINK INSTANTANEOUS 15 NIN AVG AIR TEMPERATURE: 91,79 DEG F 9199 WIND SPEED: 57 MPH 6.2 I91IMETER 226 DEGREES nrir WIND DIRECTION FROM: £)

EL.1047 RAINFALL LAST KOUR:9,00 INCHES LAST 15 IIll1:9OO INCHES C AIR TEMPERATURE:

WIND SPEED:

92,23 DEG F 4,5 MPH 9258 6.3 10 METER DEW POINT (HOURLY AVG):79,94 DEG F I46I1ETER WIND DIRECTION FROM: 231 DEGREES 231 SOLAR RADIATION EL 897 (HOURLY AYG):9,99 LANGLEYS

/MIN AIR TEMPERATURE: 9315 DEG F 9369 WIND SPEED: 5.0 MPH 6.3 WIND DIRECTION FROIl: 270 DEGREES 235 EL. 780 PEVIOS CANCEL 1 F1=CLEAR F7) j (ESC) I 11054 WKAONHQUSSECLVL 15 PRIM!BACKCPU I MODE

EfL q < -c pWf Iri d NPG Training Annual Requalification TRN-1 1.10 Procedure Examination Development Rev. 0016 and Implementation Page 99 of 102 Appendix M (Page 1 of 3)

Annual Examination EPIP Classification Documentation Shift Managers Only NOTE: This form is designed to be used for 1 scenario only.

SM!SED: Scena rio#: Date: I I Page_of_

CLASSIFICATION]: NOUE El ALERT El SAE El GE El EAL ACTION DESIGNATOR: PAR: (GE only)

CONDITIONS THAT INDICATE EAL REACHED:

a. TIME CONDITIONS INDICATED IN CONTROL ROOM:
b. TIME SM/SED DETERMINED EAL:
c. b minus a = < 15 minutes: YES El NO El
d. Correct classification determined: YES El NO El
e. EAL Designator: Correct: YES El NO El
f. PAR: Correct: YES El NO El NA El
g. EPIP Notification form accurately completed: YES El NO El
h. TIME ODS NOTIFIED h minus b = < 5 minutes YES El NO El
2. CLASSIFICATION]: NOUE El ALERT El SAE El GE El EAL ACTION DESIGNATOR: PAR: (GE only)

CONDITIONS THAT INDICATE EAL REACHED:

a. TIME CONDITIONS INDICATED IN CONTROL ROOM:
b. TIME SM/SED DETERMINED EAL:
c. b minus a = < 15 minutes: YES El NO El
d. Correct classification determined: YES El NO El
e. EAL Designator: Correct: YES El NO El
f. PAR: Correct: YES El NO El NA El
g. EPIP Notification form accurately completed: YES El NO El
h. TIME ODS NOTIFIED h minus b = < 5 minutes YES El NO El
3. CLASSIFICATION]: NOUE El ALERT El SAE El GE El EAL ACTION DESIGNATOR: PAR: (GE only)

CONDITIONS THAT INDICATE EAL REACHED:

a. TIME CONDITIONS INDICATED IN CONTROL ROOM:
b. TIME SM/SED DETERMINED EAL:
c. b minus a = < 15 minutes: YES El NO El
d. Correct classification determined: YES El NO El
e. EAL Designator: Correct: YES El NO El
f. PAR: Correct: YES El NO El NA El
g. EPIP Notification form accurately completed: YES El NO El
h. TIME ODS NOTIFIED h minus b = < 5 minutes YES El NO El Comments:

Signature below indicates that the above information is correct to the best of my knowledge:

PRINT/TYPE NAME EVALUATOR SIGNATURE PRINT/TYPE NAME REVIEWER SIGNATURE

NPG Training Annual Requalification TRN-11.10 Procedure Examination Development Rev. 0016 and Implementation Page 100 of 102 Appendix M (Page 2 of 3)

Annual Examination EPIP Classification Documentation 1.0 INSTRUCTIONS 1.1 General A. Performance Indicator data is required to be entered into the INPO data base monthly in accordance with SPP-3.4. All examination forms shall be completed, signed, and provided to Emergency Preparedness for entry into the data base by the last working day of each month in which they were collected.

B. Operating shift simulator training evaluations may be included in this indicator only when the scope requires classification. Classification, Protective Action Recommendation (PAR) notifications, and PARs may be included in this indicator if they are performed to the point of filling out the appropriate forms and demonstrating sufficient knowledge to perform the actual notification. However, there is no intent to disrupt ongoing operator qualification programs.

Appropriate operator training evolutions should be included in the indicator only when Emergency Preparedness aspects are consistent with training goals.

C. In advance to initiation of the examination of NRC Drill and Exercise Performance (DEP)

Indicators, the Shift Manager must be notified by the evaluator.

D. EP and Operations Training has pre-established that for all training evaluations, mark EPIP Initial Notification forms with THIS IS A DRILL. In order to avoid confusion, brief the Shift Manager before the examination.

E. The description of the event causing the classification may be brief and need not include all plant conditions. The EAL number is the actual description.

F. Minor discrepancies in the wind speed and direction provided on the emergency notification forms need not count as a missed notification opportunity provided the discrepancy would not result in providing an incorrect PAR.

G. Simulation of notification to offsite agencies is allowed. It is not expected that State/Local agencies be available to support all drills conducted. The drill should reasonably simulate the contact, and the participants should demonstrate their ability to use the equipment. Simulation of ODS/State notification is considered complete when the SM has demonstrated to the Instructor that he has initiated his contact to the ODS or State.

H. If an event has occurred that resulted in an emergency classification where no EAL was exceeded, the incorrect classification should be considered a missed opportunity. The subsequent notification should be considered an opportunity and evaluated on its own merit.

I. During drill performance, the crew might not classify an event exactly the way that the scenario specifies. This could be due to conservative decision making, Emergency Director Judgment, or a simulator-driven scenario that has the potential for multiple forks. Situations can arise in which assessment of classification opportunities is subjective because of deviation from the expected scenario path. In such cases, evaluators should document the rationale supporting their decision for eventual NRC inspection. Evaluators must determine if the classification was appropriate to the event as presented to the participants and in accordance with approved emergency plan and implementing procedures.

NPG Training Annual Requalification TRN-11.1O Procedure Examination Development Rev. 0016 and Implementation Page 101 of 102 Appendix M (Page3of3)

Annual Examination EPIP Classification Documentation 1.1 General (continued)

J. If an instructor intervenes, coaches, or prompts the performance of an individual to make an independent and correct classification, notification, or PAR, the DEP P1 opportunity is a failure.

K. Even though an incorrect Classification has occurred, the associated notification opportunity can be successfully demonstrated. The opportunity for notification can be counted successful if the (incorrect) classification information was communicated correctly.

L. Contact Emergency Preparedness for clarification or issues or questions.

1.2 Specific Instructions A. Use additional forms if necessary to document a scenario.

B. Before the examination scenario, complete Scenario Identification, Date, SM/SED of the examination form. Utilize Instructor Notes to clarify issues.

C. During the examination, complete classifications of the examination form.

D. Evaluate examination results of the examination form.

E. If any question(s) is answered NO, then explain why in the notes section of the examination form.

F. Collect all applicable EPIP Notification Forms and keep with examination forms.

G. Include all scenario deviations for audit and recommend scenario revisions based upon new EALs identification or incorrect EALs that might be within the exam scenario.

H. Scenarios should be written such that effective evaluation can take place. Complex scenarios with multiple forks and the use of emergency director judgment/conservative decision-making might result the need for careful evaluation and documentation.

I. If personnel notes are used for the evaluation and conclusion, then transcribe the portions of notes necessary to produce an auditable data set onto the applicable form or attach documentation.

i,. Al,.,,.. 1S. D#,fr* 7..,M D.j.l 1-4.1, 360/0 EDS METDATA 46M AVG 35o °° 10 WIND DIR & SPEED 0Y2307A 90 E .4 MI/HR 290 70 0Y2301A 180 S 20 eo DEGREES (FROM)

W 270 90 E 260 100 250 110

-F-190 S 170 e 4 L L-S1 Pi It L.f

-I-trc D e LJ t) r £ iS .CsrcI,1.

SQN TENNESSEE VALLEY AUTHORITY NUCLEAR POWER RADIOLOGICAL EMERGENCY PLAN II I

NP-REP APPENDiX B PageB-13 Revision 91 1

Section 1.0 FISSION PRODUCT BARRIER MATRIX Event 1.1 FUEL CLAD BARRIER IC 1,1.2 Primary_Coolant Activity_Level Mode 1,2,3,4 Description LOSS:

RCS sample activity is >300 1iCilgm dose equivalent Iodine -131.

Potential LOSS:

Not Applicable.

Basis LOSS:

The Loss IC addresses the condition of high RCS activity. If the reading of RCS activity is> 300 iCi/gm it is well above expected iodine spikes and corresponds to about 2% to 5% fuel clad damage. This amount of clad damage indicates that significant clad heating has occurred.

7;*

.,t Potential LOSS:

These is no Potential Loss IC associated with this item.

Escalation Not Applicable.

References NUMARCINESP-007, Rev 2, 1/92 per REG GUIDE 1.101

ENCLOSURE 9 REQUEST FOR A CORRECTION TO THE SRO ADMIN D JPM ANSWER KEY WITH SUPPORTING DOCUMENTATION

Tennessee Vafley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 November 15, 2010 ES-501 Mr. Richard S. Baldwin U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suitel 200 Atlanta, Georgia 30303-1257 Sequoyah Nuclear Plant, Units I and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Reactor Operator and Senior Reactor Operator Initial Examinations-0500032712010302 and 0500032812010302

Reference:

NRC letter to WA, Reactor Operator and Senior Reactor Operator Initial Examinations 05000327/2010302 and 05000328)2010302, dated October 6, 2010 In accordance with Examination Standard (ES) 501, Initial Post-Examination Activities, of NUREG 1021, Operator Licensing Examination Standards for Power Reactors, substantive comments related to the examination were provided in the referenced letter.

The purpose of this letter is to provide supplemental information to the substantive comments submitted in the referenced letter. The enclosure provides the supplemental information as discussed with Craig Kontz of your staff on November 5, 2010.

There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Michael Buckner at (423) 843-4208 or contact Beth A. Weizel at (423) 843-7170.

NOV 1 6 2010

U.S. Nuclear Regulatory Commission Page 2 November 15, 2010 Sincerely, Christopher R. Church Site Vice-President Sequoyah Nuclear Plant

Enclosure:

Reactor Operator and Senior Reactor Operator Initial Examinations Supplemental Substantive Comments (ES-402)

BAW:NRT:SKD Enclosure

The following provides supplemental information to the NRC post examination questions.

NRC Question I Simulator Job Performance Measure (JPM) G Need new evaluation criteria and basis for evaluating the applicants use of Abnormal Operating Procedure (AOP) M.04 Appendix E with centrifugal charging pump (CCP) and volume control tank (VCT) for establishing make-up. The issues of capacity (flow rate and overall available volume) need to be addressed as an alternative for residual heat removal (RHR) from the refueling water storage tank (RWST).

TVA Response I This JPM was developed as an alternate path JPM such that when the candidates determined that the Appendix A criteria for establishing flow from the RWST through the CCPs in Step 1 could not be established, the candidate would then move on to Step 2 and establish makeup flow from the RWST through an alternate path using the RHR pumps. After reviewing the step sequence and the use of check boxes as each step is performed, would be reasonable and looJcal that a candidate would go back to Step 5 ofe AOP after not being able to open the suction valves from the RWST to the CCPs and concludethat the next step should be the guidance in Step 5 response not obtained (RNO) column that directs the candidate to perform Appendix E of AOP-M.04. This is not the direction given to the candidate in the JPM initiating cues, (which was to establish makeup to the refueling cavity from the RWST as soon as possible) however; the direction to perform Appendix E does have a logical flow path.

Although making up to the refueling cavity using a CCP taking suction from the VCT does reduce the rate of makeup to that of VCT makeup flow (120 gpm given the plant conditions for the JPM) vs potential makeup from injection by using a CCP taking suction from the RWST

( 400 gpm ) or RHR pumps (3000 gpm ), the rate of makeup flow was not a critical task of the JPM. Since the candidates did not know what the leak rate was, they would not know if Appendix A or Appendix E flow path was adequate until after determining if refueling cavity level was recovering or not. Determining a change in refueling cavity level to indicate how effective the makeup is in recovering level was not part of the JPM, only establishing makeup flow.

The site would evaluate the candidate as satisfactory if they assumed that makeup flow from the RWST could not be established when the CCP suction valves would not open using Appendix A and then applied the Step 5 RNO column direction of implementing Appendix E.

A revised copy of JPM G, with the alternate method of makeup to the refueling cavity using Appendix E is attached.

NRC Question 2 Administrative JPM A.1.A Overtime Restrictions TVA Standard Programs and Processes (SPP) -1.5, Section 3.2.1.A.5, requires At least a 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in any 9 calendar day period.

a. How is this requirement applied / implemented at the station?
b. How should this requirement have been applied I evaluated for the schedule given in the JPM?

TVA Response 2(a)

The actual application at the station is by using a Personnel Qualification and Scheduling software program in the Shift Operations Management System (eSOMS). This program has the criteria identified in NPG-SPP-03.21, Fatigue Management and Work Hour Limits. This is the official program used to track worker hours (actual and projected) to ensure the site is complying with the requirements of Title 10 Code of Federal Regulations (CFR) Part 26, Fitness for Duty Programs.

The application of Section 3.2.1.A.5 ofAt least a 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in any 9 calendar day period is actually a 216-hour period. The computer program evaluates the 34-hour break based on the start of work following a break of at least 34 continuous hours. Therefore, the computer program would evaluate the 216 hours0.0025 days <br />0.06 hours <br />3.571429e-4 weeks <br />8.2188e-5 months <br /> since the end of the last break of at least 34 continuous hours for another break of at least 34 continuous hours in length.

TVA Response 2(b)

Normally any hours scheduled to be worked (or planned to be worked) are processed using eSOMS to determine if any of the established criteria from Section 3.2.1 would be violated.

The JPM as administered had the candidates do a manual calculation of a work schedule based on the hours presented. During development and validation it was determined that two critical tasks (work hour violations) were present. It was not identified that a violation of Item 3.2.1 .A.5 (a 34 hr break in any 9 calendar day period) had been committed. The work hours given in the JPM were processed through the eSOMS software and the computer program did identify the two predetermined work hour violations, (one on May 30, 2010, for a violation of greater than 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period and one on June 4, 2010, for a violation of greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period); however, itQ dtjfya voIation of Item 3.2.1 .A.5.

The procedure requires evaluating any 9 calendar days and it would appear that a violation of the 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in any 9 day requirement may occur on June 7, 2010. However, because of evaluating the 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break in 9-day period at the end of the workday or start of the next work day, not during a non-workday, there is a greater than 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> break for the work hours listed in the JPM. If a candidate determined that a potential violation did occur for this instance it would be a conservative call and would actually need to be verified through the use of the official tracking tool (eSOMS). This would not constitute a failure by the candidate, only an item which would need further evaluation.

new I

JPM Sm G Page 1 of 18 Rev. 1 SEQUOYAH NUCLEAR PLANT September2010 NRC Exam SIM 0 (ROSRO)

Initiate Makeup to the Refueling Cavity (rev. 1)

JPM Sim G Page 2 of 18 Rev. I ROISRO JOB PERFORMANCE MEASURE Task: Initiate Makeup to the Refueling Cavity Task#: 3210110401 (RO)

Task Standard: Makeup to the refueling cavity via the RHR Pumps is initiated per AOP-M.04.(preferred method)

Makeup to the refueling cavity via the CCPs and VCT is initiated per AOP-M.04. (alternate)

Time Critical Task: YES: NO: X KIA ReferencelRatings: O36A.o2 (3.4/4.1) 004A408 (3.8/3.4) 036AK3.03 (3.714.1)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Namel Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

JPM Sim G Page 3 of 18 Rev. 1 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SATIUNSAT column by bold print Critical Step.
2. Any UNSAT requires comments
3. Initialize the simulator to IC-114 and complete the following setup.
4. Override # AN:OVRDN_584 to ON, to bring in alarm for SPENT FUEL PIT LEVEL.
5. Override ZA0U68320, ZA0L168321, ZA0L168335A, ZA0L168339A at 50 to simulate PZR at refueling level.
6. Override ZAOPI6B66A, ZA0P16869, ZAOP16862 at 35 to simulate refuel flood up pressure.
7. Override AN:OVRDNj 695 to OFF to keep midloop high level alarm from alarming.
8. Override (FCV-62-135 & 136, CCP Suction from VCT, CLOSED. (ZLOHS62I 35A Green f:ON, ZLOHS62I36A_Green f:ON, ZDIHS62I3SA f:0 (close), ZDIHS62I36A f:0 (close)
9. Insure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.

c, Compares the actual response to the expected response.

10. Add Caution Order tag to FCV-63-1 per 0-GO-13 App. 0. (jumpers placed to remove seal in)

ToolslEquipmentlProcedures Needed:

AOP-M.04, Section 2.0, 2.1, and Appendix A & B

REFERENCES:

1. AOP-M.04 Sect 2.1 & Appendix A Refueling Malfunctions Rev No. 9
2. AOP-M.04, Sect 2.1 & Appendix E Refueling Malfunctions Rev No. 9 Task Number Task Title Cont TRN 3210110401 (RO) Initiate Makeup to the Refueling Cavity

JPMSImG Page 9 of 18 Rev. 1 Job Performance Checklist STEP1STANDARD SAT!UNSAT STEP 12 AI c SAT UNSAT Critical Step STANDARD: Operator pushes HSs (1.-HS-62-135A and 1-HS-62-136A)

IN and turns to the OPEN position and determines that neither valve opens Green lights remain LIT for FCVs-62 135 and 136.

Cue: If required acknowledge and ask for recommended path to complete tasks This step is critical to attempt a supply to the refueling cavity makeup flowpath and then for the UO to determine the valve failure so the alternate path may be utilized.

COMMENTS:

Evaluator Note: The candidate should recommend using the alternate method of filling Reactor Cavity by performing step 2 of Appendix A, OR the candidate may determine that response was not obtained due to suction valves not opening, flow from RWST is not available and returns to AOP step 5, RNO column.

(if candidate returns to step 5, RNO to perform Appendix E, then go to JPM step 20)

STEP 13: Operator reports to US that neither CCP suction from the RWST will open.

UNSAT After operator reports not being able to open CCP suction valves, report as the US that you will contact Maintenance Shift Supeivisor to investigate the cause of the valve failure.

STANDARD: Operator determines that step 2 of Appendix A is appropriate action to take or returns to step 5 RNO column for next action.

COMMENTS:

JPM Sm G Page 10 of 18 Rev, 1 Job Performance Checkllst STEP!STANDARD SATIUNSAT NOTE: The following are from Appendix A, Section A, Step 2 of AOP-M.04.

STEP 14: A.2. IF initiating makeup from RWST using RHR Pump SAT suction, THEN PERFORM the following:

UNSAT

a. VERIFY RWST level greater than 8%.

STANDARD: Operator verifies RWST level greater than 8% using one or more of the RWST level indicators located on M-6.

COMMENTS:

STEP 15: A.2. iF initiating makeup from RWST using RHR Pump SAT suction, THEN PERFORM the following:

UNSAT

b. Critical Step STANDARD: Operator uses HS-63-1A and opens FCV-63-i, Observes Red light ON, Green light OFF.

This step is crrtical to provide a makeup flowpath from the RWST to the refueling cavity.

COMMENTS:

JPM Sim G Page 11 of 18 Rev, 1 Job Performance Checklist STEPISTANDARD SATIUNSAT STEP 16: A.2. IF initiating makeup from RWST using RHR Pump SAT suction, THEN PERFORM the following:

UNSAT Critical Step STANDARD: Operator uses HS-74-1A and CLOSES FCV-74-1, Observes Red light OFF, Green Ught ON. OR Operator uses HS-742A and CLOSES FCV-74-2, Observes Red light OFF, Green light ON This step is critical to isolate the normal RHR suction flowpath and to swap over to the RWST suction flowpath.

COMMENTS:

STEP 18: A.2.d VERlFYflowto RCS. _SAT UNSAT STANDARD: Operator verifies flow into the RCS by observing flow on 1-Fl-63-91B or 1-Fl-63-928.

COMMENTS:

JPM Sim G Page 12 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SAT!UNSAT STEP 19: Inform the US of flow from RWST to RCS/Refueling Cavity. SAT UNSAT STANDARD: Operator informs US and/or SM that flow has been established from RWST to Spent Fuel Pit.

Stop Time After operator reports that flow has been established, State This completes the JPM.

COMMENTS:

Evaluator Note: If candidate went back to Step 5 RNO start evaluation here STEP2O: 2.1.5.aRNO: _SAT IF RWST NOT available, THEN PERFORM the following:

UNSA1

1) INITIATE makeup using normal charging with CCP suction aligned to VCT USING App. E, Refueling Cavity Makeup Using Normal Charging.

STANDARD: Operator transitions to App E to initiate makeup using normal charging.

COMMENTS:

JPM Sm G Page 13 of 18 Rev. 1 Job Performance Check1st STEPISTANDARD SATIUNSAT NOTE: The following steps are from Appendix E, of AOP-M.04.

STEP 21: App E 1. ENSURE SAT

  • UNSAT STANDARD: Operator places Manual/Auto toggle switch to Manual on controller 1-HIC-62-81A and then moves toggle to the right until valve position indicator is fully CLOSED Cntica Step (indicator needle stops moving to the right)

This is a critical step to stop letting down water from RHR system to conserve RCS inventory.

COMMENTS:

STEP 22: 2. ENSURE FCV-62-83, RHR Letdown CLOSED.

UNSAT STANDARD: Operator turns setpoint dial fully clockwise and observes position indicator goes fully to CLOSE (left) position COMMENTS:

JPM Sm G Page 14 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SATIUNSAT STEP 23: 3. ENSURE one of the following valves OPEN: SAT UNSAT FCV-62-85, Charging FCV to Loop 1 OR FCV-62-86, Charging FCV to Loop 4 STANDARD: Operator verifies FCV-62-86 is Open by observing switch for FCV-62-86 in the Open position and Red light On.

COMMENTS:

STEP 24: 4. ENSURE the following valves OPEN: SAT UNSAT FCV-62-90, Charging isolation FCV-62-91, Charging isolation STANDARD: Operator verifies FCV-62-90 and FCV-62-91 are Open by observing switch for each valve in A-Auto position and Red light On, Green light off for each valve.

COMMENTS:

Evaluator Note: The VCT makeup rate will be limited to 120 gpm for normal auto makeup, if charging is increased above this value then VCT makeup will be required.

JPM Sim G Page 15 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SAT!UNSAT STEP 25: 5. ENSURE VCT makeup initiated as necessary to maintain SAT VCT level above 20%:

UNSAT STANDARD: Operator verities VCT level above 20% and notes the need to monitor level to ensure normal makeup initiates as necessary.

COMMENTS:

STEP 26: 6. ENSURE the following valves OPEN: SAT UNSAT FCV-62-132, CCP Suction from VCT FCV-62-133, CCP Suction from VCT STANDARD: Operator verifies that FCV-62-1 32 and FCV-62-1 33 are OPEN by observing control switches in A-Auto position and Red tight ON, Green light Off COMMENTS:

JPM Sim G Page 16 of 18 Rev. 1 Job Performance Checklist STEPISTAN DARD SATIUNSAT STEP 27: 7. ENSURE the following valves CLOSED: SAT UNSAT FCV-62-135, CCP Suction from RWST FCV-62-136, CCP Suction from RWST STANDARD: Operator verifies that FCV-62-135 and FCV-62-136 are CLOSED by observing control switch indications Green light ON, Red light Off.

Evaluator Note: valves are failed closed per the previous JPM malfunction COMMENTS:

STEP 28: 8. ENSURE CCP running. _SAT UNSAT STANDARD: Operator verifies that 1 B-B CCP running by observing control switch in A-Auto position and Red light ON, Green light Off, and normal running amps, discharge pressure, for plant conditions.

COMMENTS:

Evauator Note: If candidate establishes greater than 120 gpm charging flow to the RCS in the next step, normal makeup flow will not be able to maintain VCT level greater than 20%

and they will eventually lose this source of makeup water if VCT level cannot be maintained.

JPM Sim G Page 17 of 18 Rev. I Job Performance Checklist STEPISTANDARD SAT!UNSAT STEP 29 9 ADJUST FCV-62-89 and FCV-6293 t Ush desired SAT UNSAT STANDARD: Operator adjusts charging flow by positioning control dial (turning dial counter clockwise) on 1-HC-82-93A to open ri ica ep FCV-62-93 to establish 120 gpm flow to the RCS.

This step is critical to ensure that makeup flow is being provided to the RCS to attempt to makeup for inventory loss due to the Reactor Cavity Seal.

COMMENTS:

STEP 30: Inform the US of flow from VCT to RCS/Refueling Cavity. SAT UNSAT STANDARD: Operator informs US and/or SM that flow has been established from VCT to RCS/Refueling Cavity.

Stop hme Cue: After operator reports that flow has been established, State This completes the JPM COMMENTS:

End Of JPM

READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. 1 will provide initiating cues and reports on other actions when directed by you All steps shall be performed for this task. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit I is in mode 6 performing refueling operations. Approximately 1/2 of the core has been off-loaded at this time.
2. There is one fuel assembly in transit to the spent fuel pit from the core. It is presently in the upender cart in transient to the spent fuel pit.
3. The refueling SRO in the reactor building has just informed you that there is an obvious drop in reactor cavity level.
4. A dedicated operator that has been assigned to monitor vessel level instruments, informs you that there is a decreasing trend in Reactor cavity level indicators.

INITIATING CUES:

1. The refueling SRO reports a confirmed reactor cavity seal failure is occurring.
2. Alarm on panel 1-M-6D (D3) SPENT FUEL PIT LEVEL HIGH-LOW has just actuated.
3. The refueling SRO has requested makeup to the refueling cavity from the RWST as soon as possible
4. The US directs you to perform AOP-M.04, Refueling Malfunctions (single performer method).
5. Inform the refueling SRO (and Unit SRO) as soon as makeup is initiated.

JPM Sim G Page 4 of 18 Rev. 1 READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you.

All steps shall be performed for this task. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit us in mode 6 performing refueling operations. Approximately 112 of the core has been off-loaded at this time.
2. There is one fuel assembly in transit to the spent fuel pit from the core. It is presently in the upender cart in transient to the spent fuel pit.
3. The refueling SRO in the reactor building has just informed you that there is an obvious drop in reactor cavity level.
4. A dedicated operator that has been assigned to monitor vessel level instruments, informs you that there is a decreasing trend in Reactor cavity level indicators.

INITIATING CUES:

1. The refueling SRO reports a confirmed reactor cavity seal failure is occurring.
2. Alarm on panel 1-M-6D (D3) SPENT FUEL PIT LEVEL HIGH-LOW has just actuated.
3. The refueling SRO has requested makeup to the refueling cavity from the RWST as soon as possible
4. The US directs you to perform AOP-M.04, Refueling Malfunctions (single performer method).
5. Inform the refueling SRO (and Unit SRO) as soon as makeup is initiated.

JPM Sim G Page 5 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SAT!UNSAT NOTE: If operator responds using AR-M6-D window D-3. AUO is dispatched to the SFP to investigate the alarm. Operator determines that AOP-M.04 is the appropriate procedure.

SAT STEP 1: Obtain the appropriate procedure.

UNSAT StartTime STANDARD: Operator obtains a copy of AOP-M.04.

COMMENTS:

STEP 2: 1. EVALUATE the following Tech Specs for applicability: SAT

  • 3.9.8.2, RHR Low Water Level
  • 3.9.10, R Vessel Water Level UNSAT
  • 3.9.11, Refueling Operations Spent Fuel Pit Water Level Cue: The US will evaluate the Tech Specs for applicability STANDARD: Operator notifies US of the need to evaluate these three Tech Spec items.

COMMENTS:

STEP 3: 2. EVALUATE EPIP-1, Emergency Plan Initiating Conditions Matrix.

UNSAT Cue: The SM will evaluate the Emergency Plan STANDARD: Operator notifies US/SM of the need to evaluate the Emergency Plan.

COMMENTS:

JPM Sim G Page 6 of 18 Rev. I Job Performance Checklist STEPISTANDARD SAT!UNSAT STEP 4: 3. Diagnose conditions to determine appropriate section, of AOP-M.04, to perform. UNSAT STANDARD: Based on plant indications and initial conditions, determines that section 2.1 must be performed and proceeds to page 4.

COMMENTS:

Caution 1: Loss of Spent Fuel Pit or Refueling Cavity level and subsequent loss of shielding may result in extremely high dose rates in Containment and Spent Fuel Pit areas.

Caution 2: If the reactor cavity water level drops to flange elevation with upender in vertical position, the top 0.25 inch of upender will extend above surface of water.

Note: Fuel Handling SRO. personnel required to place fuel in safe location, and Radeon personnel remain (if possible) until required actions are completed.

STEP 5: 2.1.1 ANNOUNCE to all non-essential personnel to evacuate SAT Containment and AB el. 734 Refuel Floor. UNSAT Q: The SM would like you to make that announcement.

STANDARD: Operator makes this announcement.

COMMENTS:

JPM Sim G Page 7 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SATIUNSAT STEP 6: 2.1.2 ENSURE the following personnel notified that seal SAT failure has occurred:

  • Control Room UNSAT
  • RADCON to monitor refueling area and Aux Bldg as required
  • Fuel Handling Supervisor The SM will ensure all control room personnel and the Fuel Handling Supervisor are aware of the event and that RADCON begins monitoring CNMT and the Aux Bldg.

STANDARD: Operator ensures these people are notified.

COMMENTS:

Caution: Failure to maintain RWST level greater than 5% may cause CCPs or RHR pumps to lose suction.

STEP 7: 2.1.3 MAINTAIN Refueling Cavity level as necessary: SAT

a. INITIATE makeup from RWST using Appendix A, Filling Refueling Cavity from RWST. UNSAT b.

Cue: US directs makeup from RWST using CCP STANDARD: Operator obtains a copy of Appendix A Section A of AOP-M.04.

COMMENTS:

NOTE:The following are from Appendix A, Filling Refueling Cavity From RWST, Section A of AOP-M.04.

STEP 8: A.1 .a. VERIFY RWST level greater than 8%.

SAT STANDARD: Operator verifies RWST level greater than 8% using UNSAT one or more of the RWST level indicators located on M-6.

COMMENTS:

JPM Sim G Page 8 of 18 Rev. 1 Job Performance Checklist STEPISTANDARD SAT/UNSAT STEP 9: A.1 .b. ENSURE the following charging valves OPEN: SAT FCV-62-90 UNSAT STANDARD: Operator verifies FCV-62-90 open by observing 1-HS 90A RED light LIT.

COMMENTS:

STEP 10: A.1 .b. ENSURE the following charging valves OPEN: SAT FCV-62-91 UNSAT STANDARD: Operator verifies FCV-62-91 open by observing 1-HS 91A RED light LIT COMMENTS:

STEP 11: A.1 .b. ENSURE the following charging valves OPEN: SAT FCV-62-85 OR FCV-62-86 UNSAT STANDARD: Operator verifies FCV-62-85 or 86 is open by observing 1-HS-62-85A or 1-HS-62-86A RED light LIT.

COMMENTS: