Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11096043231 March 2011(Cns), Units 1 and 2, Supplement for License Amendment Request to Revise Technical Specification (TS) 3.3.2, Engineer Safety Feature Actuation System Instrumentation Removal of the Superceded TS and Bases RequirementsGrace period
ML11094017831 March 2011Independent Spent Fuel Storage Installation, Submittal of Supporting Information Related to the Proposed Merger Between Duke Energy Corporation and Progress Energy, IncIncorporated by reference
Stolen
Affidavit
NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 201030 March 2011Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010
ML11096035730 March 2011Submittal of Commitment Change Evaluation Report for 2010
ML11102030730 March 2011Request for Relief Number 10-CN-001, Alternative Requirements for Temporary Acceptance of a Through-Wall Flaw in Boric Acid Tank Nozzle WeldBoric Acid
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Through-Wall Leak
Through-Wall Leakage
TAC:ME612630 March 2011
ML11091005830 March 2011Duke Energy Carolinas, LLC, Oconee Nuclear Station, McGuire Nuclear Station and Catawba Nuclear Station - Decommissioning Financial Assurance Reports
ML11067053629 March 2011Issuance of Amendments Regarding Revision of the Technical Specifications to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using a Risk-Informed JustificationSafe Shutdown
Shutdown Margin
High Radiation Area
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Power change
Operational leakage
ML11088006524 March 2011Nuclear Energy Liability Program - Changes in Subscribing Companies and in Their Proportionate Liability Endorsements
ML11089070124 March 2011Duke Energy Carolinas - Technical Specification Bases ChangesSafe Shutdown
Grab sample
Anticipated operational occurrence
Qualified Offsite Circuit
License Renewal
Pressure Boundary Leakage
Offsite Circuit
Unidentified leakage
Overspeed trip
Operational leakage
ML11083084723 March 2011Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML11080063621 March 2011Notice of Public Meeting with Catawba Nuclear Station to Discuss the NRC Reactor Oversight Process and Annual AssessmentOpen House
ML11073024316 March 2011Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6Cyber Security
Cyber attack
ML1107307749 March 2011Catawba Nuclear Station - NRC Emergency Preparedness Annual Inspection Report 05000413-10-503 and 05000414-10-503
IR 05000413/20105039 March 2011
ML1106803037 March 2011Duke Energy Carolinas, LLC - Response to Request for Additional Information Regarding License Amendment Request for Cyber Security PlanCyber Security
ML1106603307 March 2011Notice of Meeting with Duke Energy to Present Status of Licensing Submittals Regarding Implementation of National Fire Protection Association Standard 805, Requirements at Catawba Nuclear Station, Units 1 and 2 and McGuire Nuclear Station
ML1106902314 March 2011Letter Requesting That North Carolina Utilities Commission Be Added to the Distribution List for Catawba, McGuire & Oconee
ML1106300724 March 2011Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Report 05000413-11-001 and 05000414-11-001)
ML1106300794 March 2011Report 22, Inspection/Activity Plan 03/01/2011 - 06/30/2012
ML1106207183 March 2011Notice of Enforcement Discretion (NOED) for Catawba Nuclear Station (NOED No. 11-2-002)Enforcement Discretion
ML1106302761 March 2011Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.8.1, AC Sources - Operating (Primary TS) TS 3.7.8, Nuclear Service Water System (Nsws) (Secondary TS)Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Time Critical Operator Action
ML11060130428 February 2011Notification of Inspection and Request for InformationHigh Radiation Area
ML11061039625 February 2011Submittal of Fitness-For-Duty Program Performance Data ReportsFitness for Duty
IR 05000413/201030125 February 2011Er 05000413-10-301 and 05000414-10-301, on 12/13-17/10 - 12/21/10, Catawba Nuclear Station
ML11060070524 February 2011ISFSI, McGuire, Units 1 & 2, Catawba, Units 1 & 2, William States Lee III, Units 1 & 2 - Use of Encryption Software for Electronic Transmission of Safeguards Information
ML11061034024 February 2011Generic Letter 2008-01 Commitment Change
ML11055061522 February 2011Duke Energy - Notification of Potential Part 21 Re Identification of DefectCommercial Grade
IR 05000413/201140218 February 2011Letter from Michael Ernstes on Inspection Report IR 05000413-11-402 & IR 05000414-11-402, on 01/21/11, Catawba Nuclear Station, Units 1 and 2Affidavit
ML1103500039 February 2011Correction Letter for License Amendment Nos. 262 and 258, Regarding Technical Specification 3.8.4 DC (Direct Current) Sources - Operating.
ML1104102982 February 2011Initial Exam 2010-301 Final SRO Written ExamTornado Generated Missile
Annual Radiological Environmental Operating Report
Pressure Boundary Leakage
Downpower
Unidentified leakage
Overspeed trip
ML1103500452 February 2011Proposed Technical Specifications Amendments TS 3.6.10, Annulus Ventilation System, TS 3.6.16, Reactor Building, License Amendment Request to Enable Opening of the Reactor Building Pressure Boundary with Administrative.
ML1104102042 February 2011Initial Exam 2010-301 Post Exam CommentsJob Performance Measure
ML1115700402 February 2011Initial Exam 2010-301 Final Sim IN-Plant JPMs
ML1104103022 February 2011Initial Exam 2010-301 Final RO Written ExamDownpower
ML1115405092 February 2011Initial Exam 2010-301 Draft Simulator ScenariosShutdown Margin
Post Accident Monitoring
Spent Fuel Pool Instrumentation
Power change
Downpower
Overspeed trip
Operational leakage
ML1115405252 February 2011Initial Exam 2010-301 Final Simulator ScenariosShutdown Margin
Post Accident Monitoring
Power change
Downpower
Overspeed trip
Operational leakage
ML1115405222 February 2011Initial Exam 2010-301 Final Administrative DocumentsShutdown Margin
Job Performance Measure
ML1115405192 February 2011Initial Exam 2010-301 Draft Administrative JPMsShutdown Margin
High Radiation Area
Grab sample
Earthquake
Pressure Boundary Leakage
Fatality
Unidentified leakage
Operational leakage
ML1115405152 February 2011Initial Exam 2010-301 Draft Sim/IN-Plant JPMs
ML1115404942 February 2011Initial Exam 2010-301 Draft SRO Written Exam
ML1115404892 February 2011Initial Exam 2010-301 Draft RO Written ExamSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Mission time
Grab sample
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Locked High Radiation Area
Aging Management
Foreign Material Exclusion
Operability Determination
Time Critical Operator Action
License Renewal
Earthquake
Fuel cladding
Power change
Downpower
Flow Induced Vibration
Unidentified leakage
Overspeed trip
ML1115404812 February 2011Initial Exam 2010-301 Draft Administrative DocumentsShutdown Margin
ML1115700472 February 2011Initial Exam 2010-301 Final Administrative JPMsShutdown Margin
Unidentified leakage
ML11123A04931 January 2011Revision 53 to Offsite Dose Calculation Manual (ODCM)Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
Uranium Hexafluoride
IR 05000413/201000528 January 2011IR 05000413-10-005, 05000414-10-005; 10/1/2010 - 12/31/2010; Catawba Nuclear Station, Units 1 and 2; Licensed Operator Requalification, Radiological Hazard Assessment and Exposure Controls, and Radiation Monitoring InstrumentationSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Probabilistic Risk Assessment
Coatings
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Eddy Current Testing
Operability Determination
License Renewal
Liquid penetrant
Pressure boundary leak
ML11028001524 January 2011Notification of Potential Part 21 - Bus Disconnect Stab Assembly - 600V Essential Motor Control CentersUnanalyzed Condition
Fitness for Duty
Commercial Grade
Siren
ML11026039624 January 2011Submittal of 2011 Nuclear Energy Liability Endorsements
ML11020032219 January 2011Inservice Inspection Report and Steam Generator In-Service Inspection Summary Report for End of Cycle 17 Refueling OutageBoric Acid
Non-Destructive Examination
Weld Overlay
Hydrostatic
Anchor Darling
VT-2
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
ML11021067919 January 2011Proposed Technical Specifications (TS) Amendments TS 3.6.10, Annulus Ventilation System (Avs) TS 3.6.16, Reactor Building License Amendment Request to Enable Opening of the Reactor Building Pressure Boundary.Post Accident Monitoring
Hydrostatic