Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110960432 | 31 March 2011 | (Cns), Units 1 and 2, Supplement for License Amendment Request to Revise Technical Specification (TS) 3.3.2, Engineer Safety Feature Actuation System Instrumentation Removal of the Superceded TS and Bases Requirements | Grace period |
ML110940178 | 31 March 2011 | Independent Spent Fuel Storage Installation, Submittal of Supporting Information Related to the Proposed Merger Between Duke Energy Corporation and Progress Energy, Inc | Incorporated by reference Stolen Affidavit |
NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010 | 30 March 2011 | Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010 | |
ML110960357 | 30 March 2011 | Submittal of Commitment Change Evaluation Report for 2010 | |
ML111020307 | 30 March 2011 | Request for Relief Number 10-CN-001, Alternative Requirements for Temporary Acceptance of a Through-Wall Flaw in Boric Acid Tank Nozzle Weld | Boric Acid Nondestructive Examination Stress corrosion cracking Liquid penetrant Through-Wall Leak Through-Wall Leakage |
TAC:ME6126 | 30 March 2011 | ||
ML110910058 | 30 March 2011 | Duke Energy Carolinas, LLC, Oconee Nuclear Station, McGuire Nuclear Station and Catawba Nuclear Station - Decommissioning Financial Assurance Reports | |
ML110670536 | 29 March 2011 | Issuance of Amendments Regarding Revision of the Technical Specifications to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using a Risk-Informed Justification | Safe Shutdown Shutdown Margin High Radiation Area Internal Flooding Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Recently irradiated fuel Offsite Circuit Fire Protection Program Power change Operational leakage |
ML110880065 | 24 March 2011 | Nuclear Energy Liability Program - Changes in Subscribing Companies and in Their Proportionate Liability Endorsements | |
ML110890701 | 24 March 2011 | Duke Energy Carolinas - Technical Specification Bases Changes | Safe Shutdown Grab sample Anticipated operational occurrence Qualified Offsite Circuit License Renewal Pressure Boundary Leakage Offsite Circuit Unidentified leakage Overspeed trip Operational leakage |
ML110830847 | 23 March 2011 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML110800636 | 21 March 2011 | Notice of Public Meeting with Catawba Nuclear Station to Discuss the NRC Reactor Oversight Process and Annual Assessment | Open House |
ML110730243 | 16 March 2011 | Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6 | Cyber Security Cyber attack |
ML110730774 | 9 March 2011 | Catawba Nuclear Station - NRC Emergency Preparedness Annual Inspection Report 05000413-10-503 and 05000414-10-503 | |
IR 05000413/2010503 | 9 March 2011 | ||
ML110680303 | 7 March 2011 | Duke Energy Carolinas, LLC - Response to Request for Additional Information Regarding License Amendment Request for Cyber Security Plan | Cyber Security |
ML110660330 | 7 March 2011 | Notice of Meeting with Duke Energy to Present Status of Licensing Submittals Regarding Implementation of National Fire Protection Association Standard 805, Requirements at Catawba Nuclear Station, Units 1 and 2 and McGuire Nuclear Station | |
ML110690231 | 4 March 2011 | Letter Requesting That North Carolina Utilities Commission Be Added to the Distribution List for Catawba, McGuire & Oconee | |
ML110630072 | 4 March 2011 | Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Report 05000413-11-001 and 05000414-11-001) | |
ML110630079 | 4 March 2011 | Report 22, Inspection/Activity Plan 03/01/2011 - 06/30/2012 | |
ML110620718 | 3 March 2011 | Notice of Enforcement Discretion (NOED) for Catawba Nuclear Station (NOED No. 11-2-002) | Enforcement Discretion |
ML110630276 | 1 March 2011 | Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.8.1, AC Sources - Operating (Primary TS) TS 3.7.8, Nuclear Service Water System (Nsws) (Secondary TS) | Enforcement Discretion Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action |
ML110601304 | 28 February 2011 | Notification of Inspection and Request for Information | High Radiation Area |
ML110610396 | 25 February 2011 | Submittal of Fitness-For-Duty Program Performance Data Reports | Fitness for Duty |
IR 05000413/2010301 | 25 February 2011 | Er 05000413-10-301 and 05000414-10-301, on 12/13-17/10 - 12/21/10, Catawba Nuclear Station | |
ML110600705 | 24 February 2011 | ISFSI, McGuire, Units 1 & 2, Catawba, Units 1 & 2, William States Lee III, Units 1 & 2 - Use of Encryption Software for Electronic Transmission of Safeguards Information | |
ML110610340 | 24 February 2011 | Generic Letter 2008-01 Commitment Change | |
ML110550615 | 22 February 2011 | Duke Energy - Notification of Potential Part 21 Re Identification of Defect | Commercial Grade |
IR 05000413/2011402 | 18 February 2011 | Letter from Michael Ernstes on Inspection Report IR 05000413-11-402 & IR 05000414-11-402, on 01/21/11, Catawba Nuclear Station, Units 1 and 2 | Affidavit |
ML110350003 | 9 February 2011 | Correction Letter for License Amendment Nos. 262 and 258, Regarding Technical Specification 3.8.4 DC (Direct Current) Sources - Operating. | |
ML110410298 | 2 February 2011 | Initial Exam 2010-301 Final SRO Written Exam | Tornado Generated Missile Annual Radiological Environmental Operating Report Pressure Boundary Leakage Downpower Unidentified leakage Overspeed trip |
ML110350045 | 2 February 2011 | Proposed Technical Specifications Amendments TS 3.6.10, Annulus Ventilation System, TS 3.6.16, Reactor Building, License Amendment Request to Enable Opening of the Reactor Building Pressure Boundary with Administrative. | |
ML110410204 | 2 February 2011 | Initial Exam 2010-301 Post Exam Comments | Job Performance Measure |
ML111570040 | 2 February 2011 | Initial Exam 2010-301 Final Sim IN-Plant JPMs | |
ML110410302 | 2 February 2011 | Initial Exam 2010-301 Final RO Written Exam | Downpower |
ML111540509 | 2 February 2011 | Initial Exam 2010-301 Draft Simulator Scenarios | Shutdown Margin Post Accident Monitoring Spent Fuel Pool Instrumentation Power change Downpower Overspeed trip Operational leakage |
ML111540525 | 2 February 2011 | Initial Exam 2010-301 Final Simulator Scenarios | Shutdown Margin Post Accident Monitoring Power change Downpower Overspeed trip Operational leakage |
ML111540522 | 2 February 2011 | Initial Exam 2010-301 Final Administrative Documents | Shutdown Margin Job Performance Measure |
ML111540519 | 2 February 2011 | Initial Exam 2010-301 Draft Administrative JPMs | Shutdown Margin High Radiation Area Grab sample Earthquake Pressure Boundary Leakage Fatality Unidentified leakage Operational leakage |
ML111540515 | 2 February 2011 | Initial Exam 2010-301 Draft Sim/IN-Plant JPMs | |
ML111540494 | 2 February 2011 | Initial Exam 2010-301 Draft SRO Written Exam | |
ML111540489 | 2 February 2011 | Initial Exam 2010-301 Draft RO Written Exam | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Mission time Grab sample Anticipated operational occurrence Post Accident Monitoring Hydrostatic Locked High Radiation Area Aging Management Foreign Material Exclusion Operability Determination Time Critical Operator Action License Renewal Earthquake Fuel cladding Power change Downpower Flow Induced Vibration Unidentified leakage Overspeed trip |
ML111540481 | 2 February 2011 | Initial Exam 2010-301 Draft Administrative Documents | Shutdown Margin |
ML111570047 | 2 February 2011 | Initial Exam 2010-301 Final Administrative JPMs | Shutdown Margin Unidentified leakage |
ML11123A049 | 31 January 2011 | Revision 53 to Offsite Dose Calculation Manual (ODCM) | Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Effluent Release Report Uranium Hexafluoride |
IR 05000413/2010005 | 28 January 2011 | IR 05000413-10-005, 05000414-10-005; 10/1/2010 - 12/31/2010; Catawba Nuclear Station, Units 1 and 2; Licensed Operator Requalification, Radiological Hazard Assessment and Exposure Controls, and Radiation Monitoring Instrumentation | Safe Shutdown Boric Acid Packing leak High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Probabilistic Risk Assessment Coatings Temporary Modification Locked High Radiation Area Significance Determination Process Eddy Current Testing Operability Determination License Renewal Liquid penetrant Pressure boundary leak |
ML110280015 | 24 January 2011 | Notification of Potential Part 21 - Bus Disconnect Stab Assembly - 600V Essential Motor Control Centers | Unanalyzed Condition Fitness for Duty Commercial Grade Siren |
ML110260396 | 24 January 2011 | Submittal of 2011 Nuclear Energy Liability Endorsements | |
ML110200322 | 19 January 2011 | Inservice Inspection Report and Steam Generator In-Service Inspection Summary Report for End of Cycle 17 Refueling Outage | Boric Acid Non-Destructive Examination Weld Overlay Hydrostatic Anchor Darling VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML110210679 | 19 January 2011 | Proposed Technical Specifications (TS) Amendments TS 3.6.10, Annulus Ventilation System (Avs) TS 3.6.16, Reactor Building License Amendment Request to Enable Opening of the Reactor Building Pressure Boundary. | Post Accident Monitoring Hydrostatic |