MONTHYEARIR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML18201A4202018-07-20020 July 2018 Notification of Inspection and Request for Information for Nuclear Regulatory Commission Problem Identification and Resolution Inspection ML17111A8442017-04-20020 April 2017 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009) IR 05000413/20164042016-08-0404 August 2016 Cover Letter for NRC Physical Security Inspection Report 05000413/2016404 and 05000414/2016404 IR 05000413/20114022011-02-18018 February 2011 Letter from Michael Ernstes on Inspection Report IR 05000413-11-402 & IR 05000414-11-402, on 01/21/11, Catawba Nuclear Station, Units 1 and 2 ML0913802512009-03-24024 March 2009 EOC 16 Stream Generator Inspection Results NRC Update - March 24, 2009 ML0807205822008-03-12012 March 2008 Notification of Occupational Radiation Safety Inspection on May 12-16 and June 2-6, 2008, and Request for Information IR 05000413/20070112007-09-11011 September 2007 IR 05000413-07-011, 05000414-07-011, 07200045-07-001, on 02/26/2007 - 07/30/2007, Catawba - ISFSI IR 05000413/20060102007-01-0505 January 2007 IR 05000413-06-010, 05000414-06-010, on 11/27/2006-12/1/2006 for Catawba, Units 1 and 2, Special Inspection IR 05000413/20060042006-10-26026 October 2006 IR 05000413-06-004 and 05000414-06-004, on 07/01/2006 - 09/30/2006, Catawba, Units 1 and 2; Event Followup, Mitigating Systems IR 05000413/20060072006-09-22022 September 2006 IR 05000413-06-007 & IR 05000414-06-007, on 08/07/10/2006 & 08/21-25/2006, Catawba, Units 1 and 2 ML0511700132005-04-26026 April 2005 Safety System Design and Performance Capability Inspection - NRC Inspection Report 05000413/2005009 and 05000414/2005009 - Notification Letter IR 05000413/20010062002-01-15015 January 2002 IR 05000413/2001-006 & IR 05000414/2001-006, Catawba Nuclear Station, Quarterly Integrated Resident Inspection on 09/23-12/22/2001. No Violations Noted 2022-11-17
[Table view] Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 18, 2011 Mr. J. Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635 SUBJECT: CATAWBA NUCLEAR STATION - NRC PHYSICAL SECURITY INSPECTION REPORT 05000413/2011402 AND 05000414/2011402
Dear Mr. Morris:
On January 21, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Catawba Nuclear Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr.
T. Byers, and other members of your staff. A re-exit meeting was conducted by telephone on February 7, 2011, with Mr. T. Byers and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, two licensee-identified violations, which were determined to be of very low safety significance, are listed in this report. However, because of the very low safety significance and because they are entered into your corrective action program, the NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Regional Administrator, Region II, and the NRC Resident Inspector at Catawba Nuclear Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. DPC 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure:
Inspection Report 05000413/2011402 and 05000414/2011402 w/Attachment: Supplemental Information cc: See Page 3 DPC 3 cc w/Encl: Site Vice President Catawba Nuclear Station Duke Energy Carolinas, LLC 4800 Concord Rd York, SC 29745-9635 Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC CN01RC 4800 Concord Road York, SC 29745-9635 Kevin W. Phillips Safety Assurance Manager Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Rd., CN01SA York, SC 29745-9635 William T. Byers, III Security Manager Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Rd., CN01SC York, SC 29745-9635 Betty F. Johnson Security Safeguards Administrator Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Rd., CN01SC York, SC 29745-9635 Timothy J. Wadsworth Security Specialist Duke Energy Carolinas, LLC P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006 David A. Cummings Assistant General Counsel Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 DPC 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure:
Inspection Report 05000413/2011402 and 05000414/2011402 w/Attachment: Supplemental Information cc w/encl: (See page 3)
Distribution w/encl:
RidsNrrPMCatawba Resource C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
B. Westreich, NSIR (hard copy w/ encl)
E. McNiel, NSIR (hard copy w/ encl)
RIDSNRRDIRS PUBLIC OE Mail (email address if applicable)
A. Adams, NRR X PUBLICLY AVAILABLE W/OUT X NON-PUBLICLY AVAILABLE X SENSITIVE G NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER W/OUT OUO: ML110490559 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA RA RA NAME A. True K. Davis I. Hall J. Bartley M. Ernstes DATE 02/15/2011 02/15/2011 02/15/2011 02/18/2011 02/18/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIALRECORDCOPY DOCUMENTNAME:\\NRC.GOV\NRC\R2\OFFICE\DRSII\PSBII\REACTORS\CATAWBA\REPORTS\
2011\CATAWBA IR 2011402. REV1DOC.DOC Attachment