Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
L-2007-207, Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee | 18 December 2007 | Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee | |
L-2007-200, Environmental Protection Plan Report, Request to Change Industrial Wastewater Facility Permit | 13 December 2007 | Environmental Protection Plan Report, Request to Change Industrial Wastewater Facility Permit | Biofouling |
ML073400022 | 12 December 2007 | Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds TAC No. MD5114) | Weld Overlay Nondestructive Examination Incorporated by reference Finite Element Analysis Liquid penetrant Dissimilar Metal Weld |
L-2007-195, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 1 | 7 December 2007 | Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 1 | Nondestructive Examination VT-2 |
L-2007-197, Notice of Intent to Pursue Extended Power Uprates | 7 December 2007 | Notice of Intent to Pursue Extended Power Uprates | |
ML073410673 | 7 December 2007 | Florida Department of Environmental Protection Nuclear Presentation Slides, Nuclear Power in Florida. | |
L-2007-155, Request for Extension of Completion Date of the Generic Letter 2004-02 Actions | 7 December 2007 | Request for Extension of Completion Date of the Generic Letter 2004-02 Actions | Probabilistic Risk Assessment |
ML073380031 | 26 November 2007 | Endangered Species Section 7 Conference Call Summary by E-mail from FPL | |
L-2007-181, Reply to Notice of Violation; EA-70-170 | 21 November 2007 | Reply to Notice of Violation; EA-70-170 | |
ML073310381 | 21 November 2007 | Notification of Potential Part 21 Report Welding of Safety Related Components | |
L-2007-190, Environmental Protection Plan Report, Minor Revision to Industrial Wastewater Facility Permit | 20 November 2007 | Environmental Protection Plan Report, Minor Revision to Industrial Wastewater Facility Permit | |
L-2007-183, Cycle 17 Core Operating Limits Report, Rev. 0 | 19 November 2007 | Cycle 17 Core Operating Limits Report, Rev. 0 | Boric Acid Shutdown Margin |
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) | 7 November 2007 | Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) | Reactor Vessel Water Level Nondestructive Examination Pressure Boundary Leakage |
IR 05000335/2007006 | 5 November 2007 | IR 05000335-07-006, 05000389-07-006, on 08/27/2007 - 08/31/2007, 10/10/2007 - 10/14/2007, 10/24/2007 - 10/28/2007; St. Lucie Nuclear Plant, Units 1 and 2; Component Design Bases Inspection | Ultimate heat sink Stroke time Safe Shutdown Earthquake Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Time Critical Operator Action Battery sizing Operability Assessment |
ML073030330 | 29 October 2007 | Notice of Violation (NRC Office of Investigations Report No. 2-2006-029) | |
L-2007-167, Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 2007 | 29 October 2007 | Report of 10 CFR 50.59 Plant Changes During the Period of December 19, 2005 Through May 27, 2007 | |
L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | 29 October 2007 | Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Stroke time Anticipated operational occurrence Hydrostatic Missed surveillance License Renewal Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072980664 | 24 October 2007 | Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits | |
L-2007-172, In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 | 24 October 2007 | In-Service Inspection Plans Response to Request for Additional Information Re Third Ten-Year Interval Unit 2 Relief Request 10 | Weld Overlay |
ML072831379 | 23 October 2007 | (Public Version) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables | Significance Determination Process |
IR 05000335/2007004 | 23 October 2007 | IR 05000335-07-004 & IR 05000389-07-004, on 07/01/2007 - 09/30/2007, St. Lucie Nuclear Plant, Units 1 & 2; Event Followup | Boric Acid Time of Discovery High winds Ultimate heat sink Significance Determination Process Job Performance Measure Operability Determination |
TAC:MD3497 | 22 October 2007 | ||
ML072980860 | 22 October 2007 | Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Hydrostatic Annual Radioactive Effluent Release Report Process Control Program Safeguards Contingency Plan Recently irradiated fuel Fire Protection Program |
ML072841019 | 22 October 2007 | Issuance of License Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications | Offsite Dose Calculation Manual Probabilistic Risk Assessment Process Control Program Recently irradiated fuel |
L-2007-158, Supplemental Response Regarding Control System Vulnerability | 19 October 2007 | Supplemental Response Regarding Control System Vulnerability | |
L-2007-166, Technical Specification Special Report, Radiation Monitoring Inoperable Greater than 72 Hours | 18 October 2007 | Technical Specification Special Report, Radiation Monitoring Inoperable Greater than 72 Hours | |
L-2006-103, Amended 2005 and 2006 Non-Radiological Environmental Reports | 12 October 2007 | Amended 2005 and 2006 Non-Radiological Environmental Reports | Biofouling |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072760146 | 2 October 2007 | Region II Management Change in Operator Licensing | |
L-2007-147, Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. | 1 October 2007 | Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. | Time of Discovery Contraband Stolen Backfit |
ML072710477 | 28 September 2007 | EA-07-220, St. Lucie - Alleged Failure to Report Arrest | |
L-2007-148, In-Service Inspection Plans, Resubmittal for the Use of Structural Weld Overlays as an Alternative Repair Technique Third Ten-Year Interval Unit 2 Relief Request 10 | 24 September 2007 | In-Service Inspection Plans, Resubmittal for the Use of Structural Weld Overlays as an Alternative Repair Technique Third Ten-Year Interval Unit 2 Relief Request 10 | Weld Overlay Nondestructive Examination Liquid penetrant Dissimilar Metal Weld DM weld |
ML072630242 | 20 September 2007 | Minutes of August Conference Call on Biological Assessment for Sea Turtles | |
L-2007-144, Submittal of Fourth Ten-Year Interval In-Service-Test Program | 11 September 2007 | Submittal of Fourth Ten-Year Interval In-Service-Test Program | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Incorporated by reference Cold shutdown justification Power Operated Valves |
TAC:MD3495 | 4 September 2007 | ||
ML072490477 | 4 September 2007 | Technical Specifications, Issuance of Amendments Regarding Containment Spray Nozzle Surveillance Testing Frequency Change | |
ML072260005 | 4 September 2007 | License Amendment, Issuance of Amendments Regarding Containment Spray Nozzle Surveillance Testing Frequency Change | Foreign Material Exclusion |
PNO-II-07-008, A, Update - St. Lucie Unit 2 Shutdown to Repair Reactor Coolant Pump Seal Injection Line Leak | 31 August 2007 | PNO-II-07-008A, Update - St. Lucie Unit 2 Shutdown to Repair Reactor Coolant Pump Seal Injection Line Leak | Boric Acid |
ML072430436 | 31 August 2007 | SL Mid-Cycle 07, Inspection Plan, Report for 09/01/2006 - 03/31/2008 | |
L-2007-137, Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B | 31 August 2007 | Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B | |
ML072430414 | 31 August 2007 | Mid-Cycle Performance Review and Inspection Plan - St. Lucie Nuclear Plant | |
TAC:MD5114 | 23 August 2007 | ||
ML072320146 | 23 August 2007 | Request for Additional Information for St. Lucie, Relief Request Number 10, Alternative to ASME Code Requirements | Weld Overlay Nondestructive Examination Dissimilar Metal Weld DM weld |
ML072360306 | 22 August 2007 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML072330209 | 20 August 2007 | Task Order No. 106 Under Delivery Order No. NRC-03-03-037 | |
L-2007-132, Semi-Annual Fitness-For-Duty Program Performance Data for Six-Month Period Ending June 30, 2007 | 20 August 2007 | Semi-Annual Fitness-For-Duty Program Performance Data for Six-Month Period Ending June 30, 2007 | Fitness for Duty |
ML072330031 | 20 August 2007 | PNO-II-07-008: St. Lucie Unit 2 Shutdown to Repair Reactor Coolant Pump Seal Injection Line Leak | Power change |