Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2006 15:18:22 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 5
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 09/05/2006 09/07/2006 1, 2 7111105T IP Fire Protection [Triennial]
4 EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111105T IP Fire Protection [Triennial]
1 PSB1-RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 10/09/2006 10/11/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4
PSB1-RP
- RP PUBLIC BASELINE INSP Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 10/30/2006 11/03/2006 1, 2 71151 IP Performance Indicator Verification 2
EB3-HS
- HEAT SINK Baseline Inspections 01/08/2007 01/12/2007 1, 2 7111107B IP Heat Sink Performance 1
PS2-EP
- EP INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151 IP Performance Indicator Verification 4
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111117B IP Permanent Plant Modifications 1
PSB1-RP
- RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 04/02/2007 04/06/2007 1
7112101 IP Access Control to Radiologically Significant Areas 1
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 04/16/2007 04/20/2007 1
7111108P IP Inservice Inspection Activities - PWR 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Event Response Insp 04/22/2007 04/27/2007 1
93812 IP Special Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2006 15:18:22 Report 22 1
60854
- ISFSI CONSTRUCTION Other Routine 07/09/2007 07/13/2007 1
60854 IP Preoperational Testing Of An ISFSI 6
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection 1
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 10/09/2007 10/11/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 2
7111108P IP Inservice Inspection Activities - PWR 4
- LICENSED OPERATOR REQUAL INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111111B IP Licensed Operator Requalification Program 7
EB3SGRP
- STEAM GENERATOR REPLACEMENT Other Routine 10/29/2007 11/02/2007 2
50001 IP Steam Generator Replacement Inspection Other Routine 11/26/2007 11/30/2007 2
50001 IP Steam Generator Replacement Inspection Other Routine 12/17/2007 12/21/2007 2
50001 IP Steam Generator Replacement Inspection 2
EB3HEAD
- REACTOR HEAD REPLACEMENT Other Routine 11/05/2007 11/09/2007 2
71007 IP Reactor Vessel Head Replacement Inspection 2
PSB1-RP
- RP OCCUPATIONAL BASLINE INSP WK 1 Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/05/2007 11/09/2007 1, 2 71151 IP Performance Indicator Verification 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/26/2007 11/30/2007 1, 2 71151 IP Performance Indicator Verification 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Event Response Insp 12/16/2007 12/21/2007 2
93812 IP Special Inspection 2
PS2-EP
- EP EXERCISE Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2006 15:18:22 Report 22 2
PS2-EP
- EP EXERCISE Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.