Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML073400600 | 19 December 2007 | Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tacs. MD3937 Thru MD3940 and MD3943 Thru MD3948) | |
ML073540049 | 19 December 2007 | Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages | Safeguards Contingency Plan Fire Protection Program |
ML073540216 | 19 December 2007 | Change to Inspection Plan 1/1/08 - 12/31/08 | |
IR 05000454/2007405 | 14 December 2007 | IR 05000454-07-405 (Drs); 05000455-07-405 (Drs); on 10/29/2007 - 11/02/2007; Byron Station; Routine Security Baseline Inspection - Cover Letter | |
ML073540414 | 14 December 2007 | 07 NRC Participation in the Byron February 2008 Hostile Action-Based Drill | |
ML073461180 | 7 December 2007 | Correction of Administrative Error in Amendment Control Room Habitability - TS Replacement Pages | Safe Shutdown Fire Protection Program |
ML073390056 | 7 December 2007 | Correction of Administrative Error in Amendment Control Room Habitability | |
RS-07-156, Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident. | 7 December 2007 | Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident. | |
RS-07-132, Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification Amendment | 29 November 2007 | Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification Amendment | Nondestructive Examination Finite Element Analysis Liquid penetrant Through-Wall Leak |
TAC:MD7479 | 29 November 2007 | ||
PNO-III-07-014, Byron Unit 1, Nitrogen Leak During Maintenance | 27 November 2007 | PNO-III-07-014: Byron Unit 1, Nitrogen Leak During Maintenance | |
TAC:MD3937 | 19 November 2007 | ||
ML072250411 | 19 November 2007 | License Amendments to Provide Consistency with Quality Assurance Topical Report | |
TAC:MD3938 | 19 November 2007 | ||
ML073331094 | 19 November 2007 | Tech Specs for Amendments to Provide Consistency with Quality Assurance Topical Report | Safe Shutdown Safeguards Contingency Plan Fire Protection Program |
IR 05000454/2007004 | 14 November 2007 | IR 05000454-07-004; on 05000455-07-004; 07/01/2007-09/30/2007; Byron Station, Units 1 and 2; Maintenance Effectiveness, Post-Maintenance Test, Component Design Bases Inspection | Ultimate heat sink Fire Barrier Tornado Missile Internal Flooding Significance Determination Process Operability Determination Offsite Circuit Power Uprate |
ML073180716 | 14 November 2007 | Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage. | Commercial Grade Dedication |
ML072920307 | 6 November 2007 | RAI | |
PNO-III-07-012, A - NRC Inspection Team - Update to Dual Unit Shutdown | 31 October 2007 | PNO-III-07-012A - NRC Inspection Team - Update to Dual Unit Shutdown | |
ML073100389 | 31 October 2007 | Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. | Safe Shutdown Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Recently irradiated fuel Fire Protection Program |
ML072550393 | 31 October 2007 | License Amendment, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. | Safe Shutdown Earthquake Recently irradiated fuel |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
Press Release-III-07-024, - NRC Begins Special Inspection at Byron Nuclear Station to Review Corrosion and Leakage of Equipment Cooling Water Piping | 23 October 2007 | Press Release-III-07-024 - NRC Begins Special Inspection at Byron Nuclear Station to Review Corrosion and Leakage of Equipment Cooling Water Piping | |
ML072960109 | 23 October 2007 | PNO-III-07-012 - Both Units at Byron Shut Down Due to a Lead in Pipe | |
ML072840198 | 19 October 2007 | SDP Notebook Transmittal Letter (Public Version) | Significance Determination Process |
RS-07-136, Response to NRC Request for Additional Information Concerning Application for License Amendment to Implement WCAP-14333 and WCAP-15376 | 12 October 2007 | Response to NRC Request for Additional Information Concerning Application for License Amendment to Implement WCAP-14333 and WCAP-15376 | High winds Internal Flooding Probabilistic Risk Assessment |
RS-07-139, Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | 10 October 2007 | Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | Coatings Moisture barrier Maintenance Rule Program |
ML072610510 | 25 September 2007 | Evaluation of Proposed Risk-Informed Request for an Inservice Inspection Program | Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld |
ML072500149 | 20 September 2007 | PM Reassignment Letter | |
RS-07-128, Additional Information Supporting Second Ten-Year Interval Inservice Inspection Relief Requests | 17 September 2007 | Additional Information Supporting Second Ten-Year Interval Inservice Inspection Relief Requests | Liquid penetrant |
ML072600694 | 17 September 2007 | Morning Report 3-2007-0020 - Exelon Nuclear Announces Executive Realignment | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
IR 05000454/2007006 | 14 September 2007 | IR 05000454-07-006 and 05000455-07-006, on 07/16/2007-08/03/2007; Byron Station, Units 1 and 2; Identification and Resolution of Problems | Condition Adverse to Quality Significance Determination Process Operability Determination |
TAC:L24116 | 14 September 2007 | ||
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
TAC:L24117 | 14 September 2007 | ||
TAC:MD5151 | 10 September 2007 | ||
ML072490143 | 10 September 2007 | Ria Related to Integrated Leak Rate Test | Moisture barrier |
ML072500352 | 7 September 2007 | Announces Executive Realignment | |
RS-07-123, Additional Information Supporting Risk-Informed Inservice Inspection Relief Request | 7 September 2007 | Additional Information Supporting Risk-Informed Inservice Inspection Relief Request | VT-2 Dissimilar Metal Weld DM weld |
ML072430548 | 31 August 2007 | 8/31/07 Byron - Mid-Cycle Performance Review and Inspection Plan for 09/01/2007 - 12/31/2008 | |
TAC:MD4099 | 17 August 2007 | ||
ML072270247 | 17 August 2007 | RAI, to Extend the Completion Times, Bypass Test Times, & Surveillance Test Intervals for Reactor Protection Systems & Engineered Safety Features Actuation System Instrumentation | Probabilistic Risk Assessment |
ML072270701 | 17 August 2007 | Request for Additional Information Related to Requests for Relief from the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for the Second Inservice Inspection Interval | |
TAC:MD4097 | 17 August 2007 | ||
ML072320049 | 17 August 2007 | IR 05000454-07-008 (DRS) and 05000455-07-008 (Drs), on October 31- November 2, 2007, November 13-16, 2007, November 26-30, 2007, Byron Notice of Fire Protection Inspection | Safe Shutdown Fire Barrier Fire impairment Emergency Lighting Fire Protection Program |
RS-07-017, Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations. | 13 August 2007 | Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-07-110, Amergen Energy Company, LLC, Fitness for Duty Performance Data Reports - First Period - 2007 | 9 August 2007 | Amergen Energy Company, LLC, Fitness for Duty Performance Data Reports - First Period - 2007 | Fitness for Duty |
IR 05000454/2007003 | 8 August 2007 | IR 05000454-07-003 and 05000455-07-003; on 03/01/2007 - 06/30/2007; Byron Station, Units 1 and 2; Fire Protection, Inservice Inspection Activities, Operability Evaluations, and Refueling and Outage Activities | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Mission time Fire Barrier Weld Overlay Internal Flooding Past operability Nondestructive Examination Temporary Modification Finite Element Analysis Significance Determination Process Foreign Material Exclusion Operability Determination Fire Protection Program Dissimilar Metal Weld Substantial potential for an overexposure Operability Assessment Overexposure |
IR 05000454/2007404 | 8 August 2007 | IR 05000454-07-404(DRS); 05000455-07-404(DRS); 01/17/2007 - 01/19/2007; 07/09/2007 - 07/11/2007; Byron Station; Routine Security Baseline Inspection - Cover Letter |