December 19, 2007 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CHANGE TO THE INSPECTION PLAN - BYRON STATION
Dear Mr. Pardee:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Christine A. Lipa Acting for/
Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
As Stated cc w/encl:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station
Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Christine A. Lipa Acting for/
Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
As Stated cc w/encl:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station DOCUMENT NAME: G:\\Branch TSS\\ALL MOC\\midcycle 2006 to 2007\\ROP Realignment Letter\\Byron.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl ;
E = Copy with attach/encl ; N = No copy OFFICE RIII RIII NAME CLipa, Acting for RSkokowski:cms DATE 12/19/07 OFFICIAL RECORD COPY
Letter to C. Pardee from R. Skokowski dated December 19, 2007
SUBJECT:
CHANGE TO THE INSPECTION PLAN - BYRON STATION DISTRIBUTION:
RAG1 TEB MMT RidsNrrDirsIrib MAS KGO JKH3 RML2 SAM9 SRI Byron CAA1 DRPIII DRSIII PLB1 TXN
Byron Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 3
BI ENG
- ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 01/14/2008 02/01/2008 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/14/2008 02/01/2008 7111117B IP Permanent Plant Modifications 6
OL EXAM
- BYRON INITIAL LIC ON-SITE VALIDATION Not Applicable 04/28/2008 05/02/2008 W90180 BYRON - INITIAL EXAM - APRIL/MAY 2008 2
BI ENG
- ENGINEERING INSERVICE INSPECTION\\TI 172 Generic Safety Inspec 03/17/2008 04/11/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds Baseline Inspections 03/17/2008 04/11/2008 7111108P IP Inservice Inspection Activities - PWR 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/24/2008 03/28/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/24/2008 03/28/2008 7112102 IP ALARA Planning and Controls 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspectio 04/07/2008 04/11/2008 7111402 IP Alert and Notification System Testing EP Baseline Inspectio 04/07/2008 04/11/2008 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 04/07/2008 04/11/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/07/2008 04/11/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/07/2008 04/11/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/07/2008 04/11/2008 71151-EP03 IP Alert & Notification System 6
OL EXAM
- BYRON INITIAL LICENSE EXAM (05/19 - 30)
Not Applicable 05/19/2008 05/30/2008 W90180 BYRON - INITIAL EXAM - APRIL/MAY 2008 1
- ISFSI INSPECTION Other Routine 07/01/2008 09/01/2008 60856 IP Review of 10 CFR 72.212(b) Evaluations 1
2515/172
- TI 2515/172 RCS WELD INSPECTION Generic Safety Inspec 07/21/2008 07/25/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 08/11/2008 08/15/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/11/2008 08/15/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 08/11/2008 08/15/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 08/11/2008 08/15/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/06/2008 10/10/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/06/2008 10/10/2008 7112102 IP ALARA Planning and Controls 2
BI ENG
- ENGINEERING INSERVICE INSPECTION/ TI 172 Generic Safety Inspec 10/06/2008 10/31/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds Baseline Inspections 10/06/2008 10/31/2008 7111108P IP Inservice Inspection Activities - PWR
Byron Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/03/2008 11/07/2008 7111111B IP Licensed Operator Requalification Program