RS-07-017, Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Jump to navigation Jump to search
Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations.
ML072250402
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 08/13/2007
From: Benyak D
AmerGen Energy Co, Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-07-017
Download: ML072250402 (13)


Text

er Exel6n An Exelon Company www.exeloncorp.com Nuclear AmerGen Energy Company, LLC Exelon Generation 4300 Winfield Road 4300 Winfield Road Warrenville, IL 60555 Warrenville, IL 60555 RS-07-116 August 13, 2007 U. S . Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos . NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos . NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No . NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos . DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos . 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos . DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

August 13, 2007 U . S . Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations" Reference : NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12, 2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011 . Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS) . Since the LSRO examination is a dual site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.

The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter . Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818 .

Respectfully, Darin M. Benyak Director - Licensing and Regulatory Affairs

August 13, 2007 U. S . Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2007-17 Attachment 1 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2fx)R (8 2g151 Estimated burden per response to comply with this voluntary information collection request : I hour.'rhis information collection is used to plan budgets and reuiurces for operator examinations . Send comments regarding burden OPERATOR LICENSING estimate in the Records and FOIA/Privacy Services Branch iT-5 1, 3), U,_s .

Nuclear Regulatory Commission, Washington, DC 20555-WI, or by Internet e-mail to infocollec NEO v, and to the Desk 3 tticer, Office of Information EXAMINATION DATA and Regulatory Affair,,, NEOB-102010150-01 311, Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection .

FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos . NPF-72 and NPF-77 NRC Docket Nos . STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 0 1 0 6 NUMBER OF SENIOR REACTOR 0 13 0 12 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 1 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/5/09 4/4/2011 ALTERNATE DATE 10/19/09 5/16/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 14 0 0 0 0 0 18 CANDIDATES

Response to RIS 2007-17 Attachment 2 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO . 3150-0131 EXPIRES: 08/31/3(X)8 (8" 2lN)5)

Estimated burden per response to comply with this voluntary information collection request : I hour. This infra matron collection is used to plan budget, and resources for operator examinations Send comment, regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), US, Nuclear RegulatoryComnnssron, Washrnkutn, DC 20555-(")], or by Internet e-mail to nrc. vand to the Desk I. Of, Office of Information EXAMINATION DATA Ofti of Management and and Regulatory Affair ;, NEOB-10.02, (3150-013311), Office Budget, Washington, DC 20503 . If a means used to impose an information collection does not display a currently valid ON113 control number, the NRC may not conduct or -s msor, and a person is not required to respond to, the information coleection .

FACILITY NRC REGION Byron Station, Units 1 and 2 111 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR 8 O $ 5 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 0 6 7 NUMBER OF SENIOR REACTOR 1 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 O O O PROPOSED DATES PRIMARY DATE 5/19/2008 6/20/2010 8/7/2011 ALTERNATE DATE 5/26/2008 06/27/2010 8/14/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CP 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 14 0 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 3 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO . 315(1-0131 EXPIRES: 08/31/2008 (8-2(N)5)

Estimated burden per response m comply with this voluntary information collection request: I hour .'Phis information collection is used to plan budgets and resources for operator examinations . Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53t, U.S .

Nuclear Regulatory Commission, Washington .DC 0555-(N$)Lorbyinternet EXAMINATION DATA e ma if to infoc >Ilects@arc gov, and to the Desk Officer Office of Inh>rmation

~rnd Regulatory Affairs, NFOB- 10302, (3150-0131) . Office of Management and Budget. Washington, DC 10503 . If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may nor conduct or sponsor, and a person is not required to respond to, the information collection .

FACILITY NRC REGION Clinton Power Station, Unit 1 111 Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR 0 OPERATORS 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR 0 0 3 OPERATORS-UPGRADE 3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 O O O PROPOSED DATES PRIMARY DATE 8/24/2009 8/22/2011 ALTERNATE DATE 8/17/2009 8/29/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 9 0 0 0 0 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 4 Page 1 of 1 NRC FORM 536 U.S -.NUCLEAR REGULA"DORY COMMISSION APPROVED BY OMB: NO- 3150-0131 EXPIRES: 08/31/2(x)8 tR ?(NK),

Estimated burden per response to comply with this voluntary information collection request: I hour . This information collection is used to plan budgets and iesentrces fur operator eraminathuis Send comments reearding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 N), U.S .

Nuclear Regulatory Commission, Washington, DC 20555-()001, or by Internet e-mail to infocollectsC6nrc .gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs. NEOB-10202,0150-013 t), Office of Manaaemenr and Budget . Washington, DC 20503. If a means used to impose an information collectiom does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the informat ion collection .

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos . DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR 5 5 4 4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 7 5 10 8 NUMBER OF SENIOR REACTOR 0 O 1 O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 O O O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/3/2008 3/9/2009 2/8/2010 3/7/2011 ALTERNATE DATE 4/7/2008 4/6/2009 3/8/2010 4/4/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES

Response to RIS 2007-17 Attachment 5 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/1-(X)8 (8-2(K)5)

Estimated burden per re,ponse to comply with this voluntary information collection request: I hour . This information collection is used to plan budgets and resorurce~ tbr operator examinations. Send comments regardiN~ burden OPERATOR LICENSING estimate am the Records and POIA/Privacy Services Branch (T-5 F53), U,S.

Nuclear Regulatory Commission, Washington . DC -05554H)l, or by Internet Atta rsrs, EXAMINATION DATA e-mail to l i NFov, and to the Desk Officer, Office of Information and Regulatory Affai, bOB-I 0202,0150-0131), Office of Management and Budget . Washington, DC :0503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection .

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos . 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR 4 0 4 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 O 8 O NUMBER OF SENIOR REACTOR O 0 2 O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/18/2008 9/14/2010 ALTERNATE DATE 8/25/2008 9/21/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cY 2008 cY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 6 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORV COMMISSION APPROVED BY OMB: NO_ 3150-0131 EXPIRES:08/31/2(X)X (8-211415)

Estimated burden Per response to comply with this voluntary information collection request : I hour. This information collection is used to plan budgets and resources lot operator examinations Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy SeiN ices Btnnch (T-5 E0, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-(X)0], or by internet e-mail to iniocollectsC~nrc .gov, and to the Desk Officer, Office of Information EXAMINATION DATA ncl Regulatory Affairs, NEOB-10202. (315(-0131), Office of Management and Budget, Washington . DC 20503. If a means aid to impose an information not display a currently valid OMB contn>I number, the NRC may collection does sponsor, not conduct or and a person is not required to respond to, the information collection .

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

  • 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR 3 0 9 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 11 0 9 0 NUMBER OF SENIOR REACTOR 2 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
  • O 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/20/2008 '` 10/04/2010 N/A ALTERNATE DATE 10/27/2008 "' 10/18/2010 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 18 0 0 CANDIDATES
  • See Attachment 8 (Peach Bottom Atomic Power Station) for LSRO numbers and exam dates

Response to RIS 2007-17 Attachment 7 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 08/31/2(K)8 (8-2005)

Estimated burden per respcmte to comply with this voluntary information collection request: I hour. This information collection t, used to plan budgets and re,oulces for operator examinations Send comment, regardin~" burden OPERATOR LICENSING estimate to the Records and POIA/Privacy Services Branch (T-5 P53). U.S .

NUCleal' Regulatory Commi,,sion . Washington, DC. 20555-(M1, or by internet e-mail to ltocollect,@ore eov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEaB-10202, (3150-013I ), Office of Management and Budget, Washington, DC 20503, If a means used to impose an intotmation collection does not display a currently valid OMB control number, the NRC may not conduit or aprmsot; and a person is not required to respond to, the information collection.

FACILITY NRC REGION Oyster Creek Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 5 6 6 4 NUMBER OF SENIOR REACTOR 9 10 10 10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 O O 2 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 4/7/2008 6/15/2009 6/14/2010 3/14/2011 ALTERNATE DATE 4/14/2008 6/22/2009 6/21/2010 3/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CI' 2008 CY 2009 PROPOSED NUMBER DECEMBER MARCH JUNE SEPTEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 16 0 0 16 CANDIDATES

Response to RIS 2007-17 Attachment 8 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; N0 .3150-0131 EXPIRES:ON/31/2008

(%-21NI5)

Estimated burden per response to comply with this voluntary information collection request: I hour . This information collection is used to plan budgets and resources for operator examinations . Send comments regardinfl burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F"53), U.S .

e-mail it) locolle i rs, Nuclear Regulatory Commission, Washington. DC 20555-0001, or by intemet N and to the Desk Officer. Office of Information EXAMINATION DATA and Regulatory Affairs, NEOBOB-10202, (3150-0131 ), Office of Management and Budget, Washington._ DC -0503 . If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos . DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 and 1 LSRO 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 7 10 O NUMBER OF SENIOR REACTOR 2 2 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 6 O 0 OPERATORS-LIMITED PROPOSED DATES 12/7/2009 PRIMARY DATE 12/8/2008 12/6/2010 7/27/2009 - LSRO ALTERNATE DATE 12/15/2008 12/14/2009 12/13/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cY 2008 cY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 7 0 0 0 14 0 CANDIDATES

Response to RIS 2007-17 Attachment 9 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 08/31/2008 (8-21NI51 Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> . This information collection is used to plan budgets FU, and resource, for operator examinations. Send comments weardin f". burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 Nuclear Regulatory Commission, Washington, DC '=0555-0001, or by internet U .S .

e-mail to infocollects@nrc .gov, and to theDesk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10'02, (3150-0131), Office of Management and Budget, Washington, DC 20503 . If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not ennduct or sponsor, and a pecum is not required to respond to, the information collection .

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos . 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 0 4 6 O NUMBER OF SENIOR REACTOR 0 11 $ 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 1 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 O O O PROPOSED DATES PRIMARY DATE 10/16/2009 10/18/2010 ALTERNATE DATE 10/23/2009 10/25/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GEE) SCHEDULE CP 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 15 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 10 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO . 3150-0131 EXPIRES 1)8/31/2(X)8 (8-21105)

Estimated burden per response to comply with this voluntary information collection request: I hour. This mfortnahon collection is used to plan budgets and resources for operator examinations Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Comnnssion . Washington, DC 20555-(l(W, or by internet e-mail to mtocolle t {~nrc goo, and to the Desk Officer. Office of Information EXAMINATION DATA Ind Regulatory Affairs, NEOB-10203 . (3150-0131), Office oI Management and Budget, Washington, DC 20503 . If a means used to impose an Intornmtion collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the inf), rrnation collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No . DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 0 10 O 8 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 6 0 8 NUMBER OF SENIOR REACTOR 0 1 0 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/25/2009 5/30/2011 ALTERNATE DATE 6/1/2009 6/6/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 0 0 0 0 CANDIDATES