NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-05330 June 2021Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053
ML21180A23029 June 2021Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2021004 and 05000301/2021004Boric Acid
Non-Destructive Examination
Aging Management
Foreign Material Exclusion
Dissimilar Metal Weld
Scaffolding
ML21208A20528 June 2021Email - Point Beach Nuclear Plant, Units 1 and 2 (Pbn) Subsequent License Renewal Application (SLRA) Draft Requests for Additional Information (Rais) Safety - Set 2
ML21179A28728 June 2021Order (Setting Deadline for Proposed Transcript Corrections)
NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism23 June 2021Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism
ML21176A13622 June 2021Transcript of June 22, 2021 Teleconference of Oral ArgumentsAging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Environment Report
Power Uprate
ML21175A10317 June 2021Proposed Turkey Point Units 6 and 7, Point Beach Units 1 and 2, Seabroo K Station, Official Service List Update
ML21161A29917 June 2021Summary of May 18, 2021 Public Webinar with Nextera Energy Point Beach, LLC Regarding Path Forward for Generic Letter 2004-02 ClosureProbabilistic Risk Assessment
ML21175A12415 June 2021NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2: Issuance of Amendment Technical Specification Changes to Implement New Surveillance Methods for Transient Heat Flux Hot Channel Factor
ML21166A21915 June 2021Summary of June 10, 2021, Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Point Beach Nuclear Plant
ML21162A26311 June 20212020 Point Beach Nuclear Plant End-of-Cycle Meeting PresentationCoronavirus
ML21161A11910 June 2021RAIs Set 1 Final Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports FinalAging Management
License Renewal
Subsequent License Renewal
Power Uprate
L-2021-116, Subsequent License Renewal Application Environmental Report Review Requests for Confirmation Of/Additional Information (Rci/Ral) Set Response10 June 2021Subsequent License Renewal Application Environmental Report Review Requests for Confirmation Of/Additional Information (Rci/Ral) Set ResponseZebra Mussel
Frazil ice
ML21162A00310 June 2021SLRA RAI-RCIs Set 1 (Final) - Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports Email.PdfAging Management
Press Release-III-21-009, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Point Beach Nuclear Power Plant3 June 2021Press Release-III-21-009: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Point Beach Nuclear Power Plant
ML21147A5203 June 2021Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Changes Inspection
ML21209A5101 June 2021News Release-21-020: NRC Atomic Safety and Licensing Board to Hold Oral Argument on Point Beach Subsequent License Renewal
ML21148A1161 June 2021SLRA Public Meeting Discussion Questions 6-3-21Aging Management
License Renewal
Subsequent License Renewal
Power Uprate
ML21148A31028 May 2021Physicians for Social Responsibility Wisconsin'S Combined Reply in Support of Motion to Amend Contention 2 (Inadequately Tested Reactor Coolant Pressure Boundary)Aging Management
L-2021-113, Subsequent License Renewal Application - Aging Management Supplement 327 May 2021Subsequent License Renewal Application - Aging Management Supplement 3Aging Management
Subsequent License Renewal
ML21146A33726 May 2021Order (Scheduling Oral Argument)
ML21145A12625 May 2021Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2
L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 1024 May 2021NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
ML21144A16324 May 20216/10/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Point Beach Nuclear Plant for Performance for 2020 Calendar Year
ML21141A23221 May 2021Public Meeting 6/3/21 Point Beach SLRA Fluence Concrete Steel Notice InformationAging Management
ML21141A09721 May 2021NextEra Energy Point Beach, Llc'S Answer Opposing the Physicians for Social Responsibility Wisconsin'S Amendment of Contention 2Aging Management
ML21141A04221 May 2021NRC Staff'S Answer to Physicians for Social Responsibility Wisconsin'S Motion for Leave to File Amended Proposed Contention 2Aging Management
License Renewal
Subsequent License Renewal
ML21132A26419 May 2021Security Baseline Inspection FOF Cover Letter
ML21138A82418 May 2021SLR - FW: Final Request for Additional Information and Requests for Confirmation of Information Point Beach SLRA Environmental Review
ML21138A82318 May 2021SLR - FW: Final Request for Additional Information and Requests for Confirmation of Information Point Beach SLRA Environmental Review
ML21134A02318 May 2021GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra)Large early release frequency
PMNS20210610, Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 217 May 2021Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 2Probabilistic Risk Assessment
ML21134A05814 May 2021Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - Email
ML21134A06114 May 2021Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - EnclosureLicense Renewal
Subsequent License Renewal
Power Uprate
ML21133A35813 May 2021Control Point Hazard
ML21124A03111 May 2021Summary of the Environmental Site Audit Related to the Review of the Subsequent License Renewal Application (EPID Number: L-2020-SLE-0002)Environmental Justice
ML21126A2396 May 2021Subsequent License Renewal Application, Aging Management Supplement 2Boric Acid
Fire Barrier
Coatings
Aging Management
Foreign Material Exclusion
Subsequent License Renewal
Biofouling
Through-Wall Leak
Fire Protection Program
NRC 2021-0021, 2020 Annual Monitoring Report29 April 20212020 Annual Monitoring Report
ML21090A24129 April 2021Closeout Letter, Analysis of Florida Power & Light & NextEra Energy'S Initial & Updated Decommissioning Funding Pans for ISFSIs Related to Turkey Point, St. Lucie, Point Beach, Duane Arnold, Seabrook, & Point BeachDecommissioning Funding Plan
Authorized possession limits
License Renewal
ML21116A57826 April 2021Physicians for Social Responsibility, Wisconsin, Reply in Support of Petition for Leave to Intervene in Point Beach Plant Subsequent License Renewal Proceeding, and Requesting an Adjudicatory HearingAging Management
Turbine Missile
ML21116A57726 April 2021Physicians for Social Responsibility, Wisconsin, Motion to Amend Contention 2 (Inadequately Tested Reactor Coolant Pressure Boundary)Aging Management
NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations22 April 2021Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations
L-2021-081, Subsequent License Renewal Application - Aging Management Supplement 121 April 2021Subsequent License Renewal Application - Aging Management Supplement 1Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Operating Basis Earthquake
Nondestructive Examination
VT-2
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Control of Heavy Loads
Biofouling
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
IR 05000266/202100121 April 2021Integrated Inspection Report 05000266/2021001 and 05000301/2021001Boric Acid
High winds
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
Coronavirus
COVID-19
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Fire Protection Program
Power change
Unidentified leakage
ML21062A07121 April 2021Final Environmental Assessment and Finding of No Significant Impact of 2012 and 2015 Decommissioning Funding Plans for Point Beach Units 1 and 2 Independent Spent Fuel Storage InstallationDecommissioning Funding Plan
Authorized possession limits
License Renewal
ML21062A07021 April 2021Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Point Beach Units 1 and 2 Independent Spent Fuel Storage Installation (2012 and 2015)Decommissioning Funding Plan
ML21109A12619 April 2021Notice of Appearance for Travis C. Jones, Jeremy L. Wachutka, and Mitzi A. Young on Behalf of NRC Staff
ML21109A13419 April 2021Notices of Appearance for David R. Lewis, Anne R. Leidich, and Steve Hamrick on Behalf of NextEra Energy Point Beach, LLC
ML21109A38719 April 2021NRC Staff'S Answer Opposing Physicians for Social Responsibility Wisconsin'S Petition to InterveneAging Management
Turbine Missile
ML21109A13319 April 2021NextEra Energy Point Beach, Llc'S Answer Opposing the Physicians for Social Responsibility Wisconsin'S Petition for Leave to Intervene and Request for HearingIncorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Power Uprate
Affidavit
Overspeed trip