Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2015-184, Units 1 and 2, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 1730 June 2015Units 1 and 2, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 17Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
ML15180A33529 June 2015Single Positive Test Form Collected on 04/15/2015
ML15161A53524 June 2015Relief Request VR-01; Alternatives to Certain Inservice Testing Requirements of the American Society of Mechanical Engineers (ASME) Code of Operation and Maintenance of Nuclear Power Plants
ML15170A42619 June 2015Single Positive Test Form Collected on 03/10/2014
NRC 2015-0035, Response to Request for Additional Information - RR-1 0- Examination of the SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year Lsi Program Internal - MF501215 June 2015Response to Request for Additional Information - RR-1 0- Examination of the SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year Lsi Program Internal - MF5012
ML15167A32015 June 2015Minutes of the Advisory Committee on Reactor Safeguards Reliability and PRA Subcommittee Meeting - February 20, 2015Probabilistic Risk Assessment
Cyber Security
Significance Determination Process
License Renewal
Risk-Informed Steering Committee
Generic Issues Program
Fatality
NRC 2015-0015, License Amendment Request 277, Revision to Staff Augmentation Times in the Emergency Plan12 June 2015License Amendment Request 277, Revision to Staff Augmentation Times in the Emergency PlanSafe Shutdown
High Radiation Area
Probabilistic Risk Assessment
Nuclear Accident Reporting System
Fuel cladding
Minimum staff
Overexposure
TAC:MF635212 June 2015
NRC 2015-0034, 10 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End Welds11 June 201510 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End WeldsDissimilar Metal Weld
CAC:MF661511 June 2015
ML15159A7565 June 2015NRR E-mail Capture - Draft Version of Point Beach LAR for Revision of the Completion Date of Milestone 8 of the Cyber Security Plan Implementation Schedule - MF4488/89Cyber Security
NRC 2015-0033, Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule4 June 2015Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule
ML15153A1524 June 2015Nuclear Regulatory Commission Plan for the Audit of NextEra Energy Point Beach, Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Point Beach Nuclear Plant, Units 1 and 2Fukushima Dai-Ichi
CAC:MF61003 June 2015
ML16072A0363 June 2015Receipt of Cd Containing Revised I/O Files from NextEra Point Beach Nuclear Plant Flood Hazard Re-Evaluation Report
ML14290A4863 June 2015Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures
ML15153A8261 June 2015NRR E-mail Capture - LIC-109 Acceptance Review - Point Beach Unit 1 - Relief Request VR-01, Extension to Perform Inservice Testing of 1CC-00763B - MF6225
ML15149A15428 May 2015Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg)
NRC 2015-0027, Response to Request for Additional Information for Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee..28 May 2015Response to Request for Additional Information for Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee..High winds
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML15112A05126 May 2015Second Integrated Assessment Extension Letter
ML15127A29120 May 2015Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried ComponentsVT-2
Through-Wall Leak
ML15173A01420 May 2015Notification on Transfer of Exit Signs on 05/20/2015
ML15121A05715 May 2015June 9 - 12, 2014 Summary of Audit at Point Beach Nuclear Plant, Unit Nos. 1 and 2, Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805Safe Shutdown
Boric Acid
Probabilistic Risk Assessment
Multiple Spurious Operation
TAC:MF622514 May 2015
ML15133A50114 May 2015Correction Letter Regarding Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-051Spent Fuel Pool Instrumentation
NRC 2015-0025, Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B14 May 2015Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B
TAC:MF501213 May 2015
ML15138A32413 May 2015NRR E-mail Capture - Request for Additional Information - RR-10 - Examination of the Unit 2 SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year ISI Program Internal - MF5012
ML15139A03212 May 2015Comment (9) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule
ML15131A3138 May 2015Ltr. 05/08/15 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (Mod/50.59) Baseline Inspection 05000266/2015010; 05000301/2015010 (Jjc)
ML15099A0187 May 2015Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage TestHydrostatic
VT-2
Pressure Boundary Leakage
IR 05000266/20154046 May 2015IR 05000266/2015404; 05000301/2015404; on 04/20/2015 - 04/23/2015; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection. (Cover Letter Only)Affidavit
IR 05000266/20150085 May 2015IR 05000266/2015008, 05000301/2015008; on 02/23/2015 03/27/2015; Point Beach Nuclear Plant (Pbnp), Units 1 and 2; Component Design Bases InspectionNon-Destructive Examination
Significance Determination Process
Job Performance Measure
Large early release frequency
Time Critical Operator Action
Battery sizing
Weak link
Power Uprate
ML15117A6664 May 2015Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051FLEX
Spent Fuel Pool Instrumentation
ML15124A9011 May 2015Ltr. 05/01/15 Point Beach Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information (Msh)Boric Acid
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
IR 05000266/201500130 April 2015IR 05000266/2015001, 05000301/2015001; on 01/01/2015 - 03/31/2015; Point Beach Nuclear Plant, Units 1 & 2; Maintenance Effectiveness; and Occupational Dose AssessmentUnanalyzed Condition
Boric Acid
Internal Flooding
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Fire Protection Program
Substantial potential for an overexposure
Power Uprate
Overexposure
NRC 2015-0024, 2014 Annual Monitoring Report for the Period January 1 Through December 31, 201429 April 20152014 Annual Monitoring Report for the Period January 1 Through December 31, 2014Fish deterrent system
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Chernobyl
ML15113B38623 April 2015April 20, 2015 Summary of Public Outreach/Open House to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear PlantOpen House
ML15106A71223 April 2015Summary of April 6, 2015, Meeting with NextEra Energy Point Beach, LLC, to Discuss License Amendment Request to Transition to NFPA 805Safe Shutdown
Fire Protection Program
ML15112A06720 April 2015Annual Assessment Meeting Open House - Handout EOC 2014 MtgOpen House
ML15105A18817 April 2015Correction Letter for Proposed Director'S Decision Regarding Saporito Petition Dated March 12, 2011
ML15106A59314 April 2015NRR E-mail Capture - Request for Additional Information - Point Beach Nuclear Plant, Unit 1 and 2 - MF2372 and MF2373
NRC 2015-0021, 10 CFR 50.46 Annual Report for 201414 April 201510 CFR 50.46 Annual Report for 2014
Press Release-III-15-010, NRC Schedules Meeting April 20 to Discuss Point Beach Nuclear Power Plant13 April 2015Press Release-III-15-010: NRC Schedules Meeting April 20 to Discuss Point Beach Nuclear Power PlantOpen House
IR 05000266/20153019 April 2015Er 05000266/2015301; 05000301/2015301; 02/23/2015 - 03/06/2015; NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2; Initial License Examination ReportJob Performance Measure
TAC:ME58408 April 2015
ML15044A4778 April 2015Request for Resident Inspector Bandwidth Enhancement Support
ML13018A2398 April 2015G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML13018A2448 April 2015G20110171 - Letter to Licensees on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML15103A2446 April 2015Part 21 Report - Deviation of Hk Circuit Breaker Close Latch SpringCommercial Grade Dedication