NRC 2015-0033, Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule

From kanterella
Jump to navigation Jump to search
Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule
ML15159A302
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/04/2015
From: Mccartney E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2015-0033
Download: ML15159A302 (2)


Text

June 4, 2015 NRC 2015-0033 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule

References:

(1) NextEra Energy Point Beach, LLC, letter to NRC, dated June 26, 2013, "License Amendment Request 271, Transition to 10 CFR 50.48(c)-

NFPA 805, 'Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,' 2001 Edition" (ML131820453)

(2) NextEra Energy Point Beach, LLC, letter to NRC, dated September 16, 2013, "License Amendment Request 271, Supplement 1, Transition to 10 CFR 50.48(c)- NFPA 805" (ML13259A273)

(3) NRC letter to NextEra Energy Point Beach, LLC, dated September 25, 2013, "Point Beach Nuclear Plant, Units 1 and 2 -Acceptance of Licensing Action re: License Amendment Request to Transition to NFPA 805, 'Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants" (TAC NOS. MF2372 and MF2373)" (ML13267A037)

Pursuant to 10 CFR 50.90, NextEra Energy Point Beach, LLC, (NextEra) requested to amend Renewed Facility Operating Licenses DPR-24 and DPR-27 for Point Beach Nuclear Plant (PBNP), Units 1 and 2 (Reference 1 and supplemented via Reference 2). The NRC accepted the license amendment request for review as documented in Reference (3).

NextEra determined additional information was required to enable the staff's continued review of License Amendment Request 271. The following details the projected scheduled for delivery of this information:

-Complete Fire PRA re-quantification 7/28/2015

-Update Fire PRA Insights, Attachment W 8/12/2015

-Submit revised LAR pages and attachments 8/28/2015 This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions regarding this letter, please contact Mr. Michael Millen, Licensing Manager, at (920) 755-7845.

Very truly yours, NextEra Energy Point Beach, LLC

.f..,a Eric McCartney Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW