Request for Resident Inspector Bandwidth Enhancement Support
ML15044A477
Person / Time
Site: Beaver Valley, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Oconee, Mcguire, Palisades, Perry, Indian Point, Fermi, Catawba, Wolf Creek, Point Beach, Oyster Creek, Watts Bar, Cooper, Sequoyah, Pilgrim, Susquehanna, Summer, Seabrook, Brunswick, North Anna, Callaway, Vogtle, Cook, FitzPatrick, McGuire, LaSalle, BWX Technologies, 07003098, Crane
Issue date: 04/08/2015
From: Scott(Ois) Morris
Division of Inspection and Regional Support
To:
B & W Nuclear Operations Group, Calvert Cliffs, Chicago Bridge & Iron Co, DTE Electric Company, Duke Energy Carolinas, Duke Energy Progress, Entergy Nuclear Operations, Exelon Generation Co, Exelon Nuclear, FirstEnergy Nuclear Operating Co, Indiana Michigan Power Co, Nebraska Public Power District (NPPD), Point Beach, NextEra Energy Seabrook, Northern States Power Co, Nuclear Fuel Services, Progress Energy Carolinas, South Carolina Electric & Gas Co, Southern Nuclear Operating Co, Tennessee Valley Authority, Union Electric Co, Virginia Electric & Power Co (VEPCO), Wolf Creek
Ron Schmitt 415-3934
References
Download: ML15044A477 (11)


Text

April 8, 2015 The Operating Reactor Licensees (and applicants), Holders of New Construction Permits and Fuel Facility Licensees on the Enclosed List

SUBJECT:

REQUEST FOR SUPPORT OF RESIDENT INSPECTOR SITE BANDWIDTH ENHANCEMENT PROJECT The purpose of this letter is to request your support of the U.S. Nuclear Regulatory Commissions (NRCs) Resident Inspector Site Bandwidth Enhancement Project. The Bandwidth Enhancement Project consists of three phases: (1) adding circuits and related hardware; (2) deploying a network optimization tool; and (3) identifying and resolving site-specific workstation and/or network performance concerns. The current phase of the project, which involves adding circuits and related hardware, requires effective coordination among various organizations within the NRC licensees, and Verizon Local Exchange Carriers (LECs). This project is necessary to upgrade the capability of NRC resident inspector offices and telecommunication services.

In Phase 1, the NRC requests that each licensee extend four T1 lines from the point where LEC network cabling is connected to licensee-owned cabling, henceforth noted as the DEMARC location (DEMARC), to the resident inspectors offices. The three steps needed to complete Phase 1 are described below.

Step One: LEC installation of four T1 lines to each sites (DEMARC) location The LECs require access to the licensee DEMARC locations to install the four T1 lines. Verizon has informed the NRC that the LECs are familiar with site access procedures and protocols, having previously serviced the existing single NRC T1 line and other lines at most of these sites.

Should an LEC be unfamiliar with site access procedures, the pertinent licensee Regulatory Assurance department contact information has been provided to enable the LECs to facilitate gaining access to the DEMARC.

During the additional T1 line installation, the LECs must provide accurate labeling of the four T1 lines to the licensee Regulatory Assurance department point of contact, who will then need to identify them for licensee cable extension activities described in Step Two below.

Step Two: Cabling After the four T1 lines are installed by the LEC, the NRC requests that licensees extend these new T1 lines from their DEMARC to the location of NRCs on-site Wide Area Network router, and to provide accurate labeling of the extended circuits. Specifically, the NRC requests that licensees coordinate, install, extend, test and maintain the new cabling for the new T1s using their existing staff or contractors. Consistent with the NRCs obligation to furnish all afsdfaasdfsdf-communication equipment to resident inspector offices, these specified licensee actions are the financial responsibility of the NRC. NRCs Acquisition Management Division (AMD) staff intends to send a request for quote letter containing applicable instructions to licensees the week of April 13, 2015. Your timely response to this request will assist us in awarding a purchase order to complete the requested work described above.

Please do not proceed with the actual implementation until notified by AMD.

The licensee Regulatory Assurance department point of contact is asked to communicate completion of this cabling activity to the NRCs project lead (provided below).

Step Three: Activation/Validation Once the licensee has completed the on-site cabling and made notification to the NRC project lead, the NRC (or its contractor) will ship the new hardware (i.e., routers and uninterruptible power supply units) to the resident inspector office, and schedule site visits to install the new hardware, validate functionality, and activate all circuits. In some cases, the new hardware may have already been shipped and/or received.

summarizes the Phase 1 roles and responsibilities for all of the participants in this project. Please contact the NRCs Bandwidth Enhancement Project Lead, Harvey Spiro, at 301-287-0825 or Harvey.Spiro@nrc.gov, with any questions.

Sincerely,

/RA/

Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

Enclosures:

1. Roles and Responsibilities
2. List of Addressees

ML15044A477

  • via e-mail OFFICE NRR/PMDA*

NRR/DIRS OIS/OD/SESB*

OIS/OD*

NMSS/FCSE/FMB*

NRO/DCIP*

ADM/AMD*

NAME Mash (IKonduri For)

RSchmitt MWilliams (KParadiso For)

RWebber (KParadiso For) RJohnson MCheok JCorbett DATE 4/6/2015 4/6/2015 4/7/2015 4/7/2015 4/7/2015 4/7/2015 4/7/2015 OFFICE RI/DRM/IRB*

RII/DRM/IRB*

RIII/DRM/IRB*

RIV/DRM/IRB* OGC/GCHEA/GCA*

NRR/DIRS NAME MDean (RPaige For)

RFicken (GMcDonald For) RDoornbos HMcKelvey MMaxin (RBaum For)

SMorris DATE 04/06/2015 4/7/2015 4/7/2015 4/7/2015 4/7/2015 4/8/2015

SUBJECT:

REQUEST FOR RESIDENT INSPECTOR SITE BANDWIDTH ENHANCEMENT PROJECT SUPPORT DISTRIBUTION:

PUBLIC RidsAdmMailCenter JCorbett, ADM/AMD/D KShankar, ADM/AMD/CAB RidsNmssOd RidsNmssTa RidsNroOd RidsNroMailCenter RidsNroDsea MJardaneh, NRO/DSEA DJackson, NRO/DARR AKock, NRO/DSEA RidsNrrOd RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlLpl1-2 RidsNrrDorlLpl2-1 RidsNrrDorlLpl2-2 RidsNrrDorlLpl3-1 RidsNrrDorlLpl3-2 RidsNrrDorlLpl4-1 RidsNrrDorlLpl4-2 RidsNrrDorlLp_WB BBeasley, NRR DBroaddus, NRR NDiFrancesco, NRR MKhanna, NRR MMarkley, NRR EOesterle, NRR RPascarelli, NRR DPelton, NRR JQuichocho, NRR LRegner, NRR TTate, NRR RidsNrrLaSLent RidsNrrMailCenter RidsNrrPMANO RidsNrrPMBeaverValley RidsNrrPMCallaway RidsNrrPMCalvertCliffs RidsNrrPMBraidwood RidsNrrPMBrownsFerry RidsNrrPMBrunswick RidsNrrPMByron RidsNrrPMCallaway RidsNrrPMCalvertCliffs RidsNrrPMCatawba RidsNrrPMClinton RidsNrrPMColumbia RidsNrrPMComchePeak RidsNrrPMCooper RidsNrrPMDavisBesse RidsNrrPMDCCook RidsNrrPMDiabloCanyon RidsNrrPMDresden RidsNrrPMDuaneArnold RidsNrrPMFarley RidsNrrPMFermi2 RidsNrrPMFitzPatrick RidsNrrPMFortCalhoun RidsNrrPMGrandGulf RidsNrrPMHatch RidsNrrPMHopeCreek RidsNrrPMIndianPoint RidsNrrPMLaSalle RidsNrrPMLimerick RidsNrrPMMcGuire RidsNrrPMMillstone RidsNrrPMMonticello RidsNrrPMNineMilePoint RidsNrrPMNorthAnna RidsNrrPMOconee RidsNrrPMOysterCreek RidsNrrPMPalisades RidsNrrPMPaloVerde RidsNrrPMPeachBottom RidsNrrPMPerry RidsNrrPMPilgrim RidsNrrPMPointBeach RidsNrrPMPrairieIsland RidsNrrPMQuadCities RidsNrrPMREGinna RidsNrrPMRiverBend RidsNrrPMRobinson RidsNrrPMStLucie RidsNrrPMSalem RidsNrrPMSeabrook RidsNrrPMSequoyah RidsNrrPMShearonHarris RidsNrrPMSouthTexas RidsNrrPMSummer RidsNrrPMSurry RidsNrrPMSusquehanna RidsNrrPMThreeMileIsland RidsNrrPMTurkeyPoint RidsNrrPMVogtle RidsNrrPMWaterford RidsNrrPMWattsBar1 RidsNrrPMWattsBar2 RidsNrrPMWolfCreek RidsNrrPmda RidsNsirOd RidsOcfoMailCenter RidsOeMailCenter RidsEdoMailCenter RidsOgcMailCenter RidsRgn1MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter RWebber, OIS/OD/D KParadiso, OIS/OD/DD TCarr, OIS/OD/TA MWilliams, OIS/OD/SESB HSpiro, OIS/OD/SESB

afsdfaasdfsdf-Roles and Responsibilities for Resident Inspector Bandwidth Enhancement Project NRC Bandwidth Enhancement Project Lead Overall coordination of the project, including scheduling and project management.

Testing and project acceptance recommendations.

Procurement and equipment staging at Resident Inspector sites.

Informing all relevant parties of installation and delivery dates.

Install, test, and activate router and uninterruptible power supply units.

Coordinate licensee reimbursement for expenses incurred.

Verizon Local Exchange Carriers (LECs)

Install and label four new T1 circuits, in addition to the existing T1 circuit, at each licensee site. Wherever possible, terminate each circuit at the pre-existing licensee DEMARC location.

Validate circuit functionality and be available for troubleshooting during the U.S. Nuclear Regulatory Commission (NRC) router connection and circuit activation session.

Provide on-call assistance and consultation.

Licensee Collaborate with NRCs Acquisition Management Division in the award of purchase order for the timely implementation of the project.

Coordinate access for Verizon LECS to the T1 DEMARC location.

Extend each of the new four T1 circuits from Verizon DEMARC to the NRC resident inspector office (the same location as the existing NRC router).

Perform testing to ensure error-free functionality for each cable extension, preferably within 14 days of DEMARC installation by the Verizon LEC.

Provide accurate labeling of the extended circuits.

Notify the NRCs Bandwidth Expansion Project Lead following successful cable extension and testing.

Maintain on-call availability during installation, test, and activation.

Submit documented expenses to the NRCs Bandwidth Expansion Project Lead.

NRC Resident Inspectors and Regional Office Information Technology Team Receive and send confirmation to the NRCs Bandwidth Expansion Project Lead upon receipt of shipped routers and uninterruptible power supply units.

Provide guidance, point of contacts, access, and escort to NRC staff (and contractor personnel) while onsite during bandwidth activation.

Maintain liaison between licensees and other responsible parties.

LIST OF ADDRESSEES Arkansas Nuclear One Entergy Operations, Inc.

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Mr. Jeffrey Forbes Executive Vice-President, Nuclear Operations and CNO Entergy Services, Inc.

1340 Echelon Parkway Jackson, MS 39286-1995 Beaver Valley Power Station FirstEnergy Nuclear Operating Co.

Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Eric A Larson Site Vice President Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant Tennessee Valley Authority Docket Nos. 50-259, 50-260 and 50-296 License Nos. DPR-33, DPR-52 and DPR-68 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Duke Energy Progress, Inc.

Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Mr. William R. Gideon, Vice President Brunswick Steam Electric Plant P. 0. Box 10429 Southport, NC 28461 Callaway Plant Union Electric Company Docket No. 50-483 License No. NPF-30 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant P.O. 620 Fulton, MO 65251 Byron Station, Units 1 & 2/Braidwood Station, Units 1 & 2 Exelon Generation Company, LLC Docket Nos. STN 50-454 & STN 50-455 (Byron),

STN 50-456 & STN 50-457 (Braidwood)

License Nos. NPF-37 and NPF-66 (Byron),

NPF-72 and NPF-77 (Braidwood)

Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745

2 Clinton Power Station Exelon Generation Company, LLC Docket No. 50-461 License No. NPF-62 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555 Columbia Generating Station Energy Northwest Docket No. 50-397 License No. NPF-21 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest MD 1023 76 North Power Plant Loop P.O. Box 968 Richland, WA 99352 Comanche Peak Nuclear Power Plant Luminant Generation Company LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Rafael Flores Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company, LLC P.O. Box 1002 Glen Rose, TX 76043 Cooper Nuclear Station Nebraska Public Power District Docket No. 50-298 License No. DPR-46 Mr. Oscar A Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 Donald C. Cook Nuclear Plant Indiana Michigan Power Company Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company Docket No. 50-346 License No. NPF-3 Mr. Raymond A. Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 N. State Route 2 Oak Harbor, OH 43449-9760 Diablo Canyon Power Plant Pacific Gas & Electric Company Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Mr. Anthony F. Earley, Jr.

Chairman, CEO, and President PG&E Corporation One Market Plaza, Spear Tower Suite 2400 San Francisco, CA 94105

3 Dresden Nuclear Power Station Exelon Generation Co., LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Bryan Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Docket No. 50-331 License No. DPR-49 Mr. Mano Nazar Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Co. Inc.

Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Mr. C.R Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

P.O. Box 1295 / BIN B038 Birmingham, AL 35201-1295 Fermi DTE Electric Company Docket No. 50-341 License No. NPF-43 Mr. Paul Fessler, Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2-210 NOC 6400 North Dixie Highway Newport, Ml 48166 H.B Robinson Steam Electric Plant Duke Energy Progress, Inc.

Docket No. 50-261 License No. DPR-23 Mr. Richard M. Glover, S i t e Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road Hartsville, SC 29550 Hope Creek Generating Station PSEG Nuclear LLC Docket No. 50-354 License No. NPF-57 Thomas Joyce PSEG Nuclear LLC - N09 P. O. Box 236, Hancocks Bridge, NJ 08038 Indian Point Nuclear Generating Entergy Nuclear Operations, Inc.

Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Lawrence Coyle Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc.

Docket No. 50-333 License No. DPR-59 Vice President, Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O.Box110 Lycoming, NY 13093

4 Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Thomas A. Fanning Southern Company 30 Ivan Allen Jr. Blvd., NW Atlanta, GA 30308 Fort Calhoun Station Omaha Public Power District Docket No. 50-285 License No. DPR-40 Mr. W. Gary Gates President and Chief Executive Officer Omaha Public Power District 444 South 16th St. Mall Omaha, NE 68102-2247 Grand Gulf Nuclear Station Entergy Operations, Inc.

Docket No. 50-416 License No. NPF-29 Mr. Ogden J. Miller General Manager, Plant Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station 7003 Bald Hill Road - Waterloo Road Port Gibson, MS 39150 LaSalle County Station Exelon Generation Co., LLC Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18 Mr. Bryan Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station Exelon Generation Company, LLC Docket Nos. 50-352 & 50-353 License Nos. NPF-39 and NPF 85 Mr. Bryan C. Hanson Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555 McGuire Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Steven D. Capps Vice President - McGuire Site Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Millstone Nuclear Power Station Dominion Nuclear Connecticut, Inc.

Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 David Heacock Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Monticello Nuclear Generating Plant Northern States Power Company Minnesota Docket No. 50-263 License No. DPR-22 Mrs. Karen D. Fili Site Vice President Northern States Power Company-Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637

5 Nine Mile Point Nuclear Station Nine Mile Point Nuclear Station, LLC Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69 Christopher Crane Exelon Business Services 10 S Dearborn St Chicago, IL 60603 North Anna Power Station Virginia Electric and Power Company Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Oconee Nuclear Station Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Mr. Scott Batson Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 - 0752 Oyster Creek Nuclear Generating Station Exelon Generation Co., LLC Docket No. 50-219 License No. DPR-16 Mr. Bryan Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Palisades Nuclear Plant Entergy Nuclear Operations, Inc.

Docket No. 50-255 License No. DPR-20 Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Palo Verde Nuclear Generating Station Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529, and STN 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Mr. Donald E. Brandt Chairman and Chief Executive Officer Arizona Public Service Company P.O. Box 53999, MS 9042 Phoenix, AZ 85072-3999 Peach Bottom Atomic Power Station Exelon Generation Co., LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Bryan Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Perry Nuclear Power Plant FirstEnergy Nuclear Operating Co.

Docket No. 50-440 License No. NPF-58 Mr. Ernest J. Harkness Site Vice President-Nuclear-Perry FirstEnergy Nuclear Operating Co.

Perry Nuclear Power Plant PO Box 97, A290 Perry, OH 44081 Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.

Docket No. 50-293 License No. DPR-35

6 Mr. John Dent, Jr.

Vice President - Site VP Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Docket Nos. 50-282 & 50-306 License Nos. DPR-42 and DPR-60 Mr. Timothy J. OConnor Senior Vice President and Chief Nuclear Officer Northern States Power Company - Minnesota 414 Nicollet Mall Minneapolis, MN 55401 Quad Cities Nuclear Power Station Exelon Generation Company, LLC Docket Nos. 50-254 & 50-265 License Nos. DPR-29 and DPR-30 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC Docket No. 50-244 License No. DPR-18 Christopher Crane Exelon Generation Company, LLC 100 Constellation Way Baltimore, MD 21201 River Bend Station Entergy Operations, Inc.

Docket No. 50-458 License No. NFP-47 Mr. Jeffrey Forbes Executive Vice-President, Nuclear Operations and CNO Entergy Services, Inc.

1340 Echelon Parkway Jackson, MS 39213 Salem Nuclear Generating Station PSEG Nuclear LLC Docket Nos. 50-272 & 50-311 License Nos. DPR-70 and DPR-75 Thomas Joyce President and CNO PSEG Nuclear LLC-N09 P. O. Box 236 Hancocks Bridge, NJ 08038 Seabrook Station NextEra Energy Seabrook, LLC Docket No. 50-443 License No. NPF-86 Mr. Dean Curtland Vice President, Seabrook Nuclear Plant c/o Michael Ossing NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Sequoyah Nuclear Plant Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79

7 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street LP 3D-C Chattanooga, TN 37402 Shearon Harris Nuclear Power Plant Duke Energy Progress, Inc.

Docket No. 50-400 License No. NPF-63 Lynn J. Good Duke Energy Corporation 550 South Tryon Street Charlotte, NC 28202 St. Lucie Plant Units Florida Power and Light Company Docket Nos. 50-335 & 50-389 License Nos. DPR-67 and NPF-16 James Robo NextEra Energy P. O. Box 14000 700 Universe Boulevard Juno Beach, FL 33408-0420 South Texas Project STP Nuclear Operating Company Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and PF-80 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 Surry Power Station Virginia Electric & Power Company Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. David A. Heacock Virginia Electric & Power Company 5000 Dominion Blvd.

Glen Allen, VA 23060-6711 Susquehanna Steam Electric Station PPL Susquehanna, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 William H. Spence PPL Susquehanna, LLC 2 North Ninth Street GENTW16 Allentown, PA 18101 Three Mile Island Nuclear Station Exelon Generation Company, LLC.

Docket No. 50-289 License No. DPR-50 Mr. Bryan Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Turkey Point 3 & 4 Florida Power & Light Company Docket Nos. 50-250 & 50-251 License Nos. DPR-331 and DPR-41 Jim Robo NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Virgil C. Summer Nuclear Station South Carolina Electric and Gas Company Docket No. 50-395 License No. NPF-12

8 Mr. Thomas D. Gatlin, Vice President Nuclear Operations South Carolina Electric and Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 Vogtle Electric Generating Plant Southern Nuclear Operating Co., Inc.

Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Mr. C.R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

P.0. Box 1295/Bin 038 Birmingham, AL 35201-1295 Waterford Steam Electric Station Entergy Operations, Inc.

Docket No. 50-382 License No. NPF-38 Mr. Jeffrey Forbes Executive Vice-President, Nuclear Operations and CNO Entergy Services, Inc.

1340 Echelon Parkway Jackson, MS 39213 Watts Bar Nuclear Plant Tennessee Valley Authority Docket Nos. 50-390 and 50-391 License No. NPF-90 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Wolf Creek Generating Station Wolf Creek Nuclear Operating Corp.

Docket No. 50-482 License No. NPF-42 Mr. Adam C. Heflin President, Chief Executive Officer, and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Virgil C. Summer Nuclear Station Units 2 and 3 South Carolina Electric & Gas Company Docket Nos.52-027 and 52-028 License License Nos.

NPF-93 and NPF-94 Mr. Ronald A. Jones, Vice President New Nuclear Operations South Carolina Electric & Gas Company 14368 State Highway 213 Jenkinsville, SC 29065 Vogtle Electric Generating Plant Units 3 and Unit

4.

Southern Nuclear Operating Company, Inc.

Docket Nos.52-025 and 52-026 License Nos. NPF-91 and NPF-92 Mr. Mark Rauckhorst Vogtle 3&4 Construction Vice President BIN 63031 7825 River Road Waynesboro, GA 30830 Watts Bar Nuclear Plant, Unit 2 Tennessee Valley Authority Docket No. 50-391 License No. N/A Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanoonga, TN 37402-2801 Babcock & Wilcox Nuclear Operations Group, INC.

Docket Number: 70-027 License Number: SNM-42

9 Mr. B. Joel Burch Vice President and General Manager 2016 Mount Athos Road Lynchburg, VA 24504 Nuclear Fuel Services, INC.

Docket Number: 70-143 License Number: SNM-124 Mr. Joel W. Duling President PO BOX 337, MS-123 Erwin, TN, 37650-0337 Chicago Bridge & Iron AREVA MOX Services, LLC.

Docket Number: 70-3098 License Number: N/A (under construction)

Mr. David Del Vecchio President and Chief Operating Officer Savannah River Site P.O. Box 7097 Aiken, SC 29804-7097