NRR E-mail Capture - Request for Additional Information - RR-10 - Examination of the Unit 2 SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year ISI Program Internal - MF5012
ML15138A324
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/13/2015
From: Mahesh Chawla
Plant Licensing Branch III
To: Cross W, Millen M
Florida Power & Light Co, Point Beach
References
TAC MF5012
Download: ML15138A324 (2)


Text

NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Wednesday, May 13, 2015 10:11 AM To: michael.millen@nexteraenergy.com; Cross, William (WILLIAM.CROSS@fpl.com)

Cc: Alley, David; Cumblidge, Stephen; Pelton, David; Oliver, David; Barclay, Kevin; Cameron, Jamnes

Subject:

Request for Additional Information - RR Examination of the Unit 2 SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year ISI Program Internal - MF5012 By letter dated October 13, 2014, (Agencywide Document Access and Management System (ADAMS)

Accession Number ML14286A094), NextEra Energy Point Beach, LLC (NextEra), (the licensee), submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI for the fifth 10-year Inservice Inspection (ISI) Program ending on July 31, 2022 for Point Beach Nuclear Power Plant, Unit No.

2.

The Component Performance, NDE, and Testing Branch (EPNB) staff has reviewed and evaluated the information provided by the licensee, and has determined that the following information is needed in order to complete its review of the relief request.

1. Please provide the ASME designation for the materials of construction for both the nozzle and the weld metal.
2. If the nozzle and weld material are made of ferritic steel, please describe if the weld was made using the temper bead technique or if post-weld heat treatment was applied to the nozzle weld area.
3. Has an analysis for thermal fatigue ben performed for the weld? If so, please provide the expected cumulative usage factor for the weld projected through the end of the components expected service life.

Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2083 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20150513101000)

Subject:

Request for Additional Information - RR Examination of the Unit 2 SG Feedwater Nozzle Extension to Nozzle Weld Fifth Ten-Year ISI Program Internal - MF5012 Sent Date: 5/13/2015 10:10:48 AM Received Date: 5/13/2015 10:10:00 AM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Alley, David" <David.Alley@nrc.gov>

Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>

Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>

Tracking Status: None "Oliver, David" <David.Oliver@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov>

Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>

Tracking Status: None "michael.millen@nexteraenergy.com" <michael.millen@nexteraenergy.com>

Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1476 5/13/2015 10:10:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: