 Issue dateTitleTopic
ML15188A35030 June 2015Second Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)Containment Hardened Vent
ML15187A17230 June 2015Interim Part 21 Report - Potential Test Induced Defect in 0867F Main Steam Safety Relief ValvesFlow Induced Vibration
Press Release-I-15-031, NRC to Hold Regulatory Conference with Entergy on July 8th Regarding Apparent Violation at Pilgrim Nuclear Power Plant26 June 2015Press Release-I-15-031: NRC to Hold Regulatory Conference with Entergy on July 8th Regarding Apparent Violation at Pilgrim Nuclear Power Plant
ML15187A39724 June 2015OEDO-15-00479 - David Lochbaum Email,6.24.15 2.206 Petition Regarding Pilgrim'S Flood Licensing Basis
CAC:MF646024 June 2015
ML16029A40724 June 2015ODEO-15-00479: 2.206 Petition on Current Licensing Basis for Flooding at Pilgrim
ML15176A31724 June 2015LTR-15-0344 - Mary Lampert, Director, Pilgrim Watch, E-mail Request to Withdraw Nrc'S 95002 Supplemental Follow-Up Inspection Report 05000293/2015009 Issued June 18, 2015, and Issue a New ReportHigh winds
FLEX
Preliminary White Finding
IR 05000293/201500722 June 2015Notice of Category 1 Public Meeting - Regulatory Conference to Discuss Preliminary White Finding and Associated Apparent Violation for Pilgrim Nuclear Power Station (IR 05000293/2015007)Preliminary White Finding
ML15166A40119 June 2015Request for Alternative PRR-26 for the Fifth 10-year Inservice Inspection IntervalIncorporated by reference
TAC:MF543219 June 2015
IR 05000293/201500918 June 2015IR 05000293/2015009; 05/04/2015 - 05/08/2015; Pilgrim Nuclear Power Station (Pilgrim); Follow-up Supplemental Inspection - Inspection Procedure (IP) 95002High winds
Half scram
Temporary Modification
Foreign Material Exclusion
Preliminary White Finding
Power change
ML15170A18017 June 2015Transmittal of Flood Hazard Reevaluation Documentation
ML15154A97516 June 2015Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1Ultimate heat sink
Safe Shutdown Earthquake
Fukushima Dai-Ichi
ML15166A36116 June 2015Project Manager Reassignment
ML15162A88311 June 2015LTR-15-0319 - Mary Lampert, Pilgrim Watch, Town of Duxbury Nuclear Advisory Committee and Cape Downwinders, E-mail 2.206 Petition on Emergency PlanningHigh winds
FLEX
Preliminary White Finding
ML15161A50310 June 2015NRR E-mail Capture - Pilgrim Nuclear Power Station - Technical Review Checklist Related to Interim Expedited Seismic Evaluation Process Supporting NTTF Recommendation 2.1, SeismicHigh Radiation Area
Ultimate heat sink
Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
Earthquake
ML15176A3139 June 2015LTR-14-0535 - Transcript of 10 CFR 2.206 Petition Review Board Teleconference on 6/9/15 with Pilgrim Watch and Cape Downwinders Pilgrim SecurityUltimate heat sink
Chernobyl
ML15189A1939 June 2015LTR-14-0535 - E-mail Capture from Mary Lampert, Pilgrim Watch - Supplement 1 to 2.206 Petition on Pilgrim Security Univ. Texas Report: Protecting U.S. Nuclear Facilities from Terrorist Attack: Re-assessing the Current 'Design Basis Threat'Probabilistic Risk Assessment
Earthquake
Chernobyl
Stolen
ML15189A1969 June 2015LTR-14-0535 - E-mail Capture from Mary Lampert, Pilgrim Watch - Supplement 2 to 2.206 Petition on Pilgrim Security No Tresspassing Signs
CAC:MF63405 June 2015
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionLiquid penetrant
ML15166A0374 June 2015Request for Approval of Relief Requests (PRR)-50 and -51, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Implementation of Code Case N-702 (PRR-50) and Implementation of BWRVIP-05 (GL 98-05) (PRR-51)Nondestructive Examination
Pressure and Temperature Limits Report
CAC:MF63624 June 2015
ML14290A4863 June 2015Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures
ML15170A1812 June 2015Areva, Inc., - Flood Hazard Reevaluation for Pilgrim Nuclear Power Station
ML15146A4341 June 2015Nuclear Regulatory Commission Plan for the Audit of Entergy Nuclear Operations, Inc.'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Pilgrim Nuclear Power StationFukushima Dai-Ichi
ML15148A33828 May 2015Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station
ML15231A36427 May 2015FOIA/PA-2014-0204 - Resp 1 - Final, Group a
ML15147A41227 May 2015IR 05000293/2015007; 02/02/2015 - 03/20/2015; Pilgrim Nuclear Power Station (Pnps); Special Inspection to Review the January 27, 2015 Partial Loss of Offsite Power (LOOP) and Reactor Scram Event; Inspection Procedure 93812, Special InspectiHigh winds
Reactor Vessel Water Level
Past operability
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
FLEX
Aging Management
Significance Determination Process
Large early release frequency
Preliminary White Finding
ML15156A92627 May 2015FOIA/PA-2015-0204 - Resp 1 - Final
ML15112A05126 May 2015Second Integrated Assessment Extension Letter
ML15138A31918 May 2015Region I Response Email - Pilgrim Watch (Mary Lampert) Comment/Questions FLEX Mooring PlanFLEX
Spent Fuel Pool Instrumentation
ML15138A37313 May 2015Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2014Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
ML15139A07913 May 2015Annual Radiological Environmental Operating Report for January 1 Through December 31, 2014Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Fuel cladding
TAC:MF533912 May 2015
ML15124A60312 May 2015Response Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentFukushima Dai-Ichi
Minimum staff
IR 05000293/201500111 May 2015IR 05000293-15-001 and ISFSI Report 07201044-15-001; 01/01/2015 - 03/31/2015; Pilgrim Nuclear Power Station (Pnps); Other ActivitiesFire Barrier
Stroke time
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Siren
ML15131A10310 May 2015NRR E-mail Capture - Logbook Entry: 05/10/2015, Pilgrim
ML15114A0216 May 2015Issuance of Amendment Regarding the Minimum Critical Power Ratio License Amendment RequestSafe Shutdown
Anticipated operational occurrence
Cyber Security
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML15134A0171 May 2015Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief ValvesFlow Induced Vibration
ML15124A0211 May 2015NRR E-mail Capture - Logbook Entry: 05/01/2015
CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual30 April 2015Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program ManualSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML15121A03030 April 2015NRR E-mail Capture - Logbook Entry: 04/30/2015
ML15120A32329 April 2015NRR E-mail Capture - Logbook Entry: 04/29/2015
ML15128A02327 April 2015NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of EntergyIncorporated by reference
Power change
NRC-2013-0192, Office of New York Attorney General Comments on the March 27, 2015, Proposed Director'S Decision NRC-2013-0192 Pursuant 10 CFR 2.206 Concerning Various Entergy Facilities27 April 2015Office of New York Attorney General Comments on the March 27, 2015, Proposed Director'S Decision NRC-2013-0192 Pursuant 10 CFR 2.206 Concerning Various Entergy Facilities
CNRO-2015-00013, Response to Request for Comments on the Proposed Director'S Decision Pertaining to 2.206 Petition Regarding Financial Qualifications of J. A. FitzPatrick, Pilgrim, and Vermont Yankee23 April 2015Response to Request for Comments on the Proposed Director'S Decision Pertaining to 2.206 Petition Regarding Financial Qualifications of J. A. FitzPatrick, Pilgrim, and Vermont Yankee
ML15103A06921 April 2015Relief Request PRR-24 Regarding Nozzle-to-Vessel Welds and Nozzle Inner Radii ExaminationIncorporated by reference
ML15051A33620 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations Relating to Recommendation 2.1Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
TAC:MF396720 April 2015