ML15170A180
| ML15170A180 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/17/2015 |
| From: | Perkins E Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML15170A222 | List: |
| References | |
| 2.15.044 | |
| Download: ML15170A180 (1) | |
Text
SEntergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Everett (Chip) Perkins Jr.
Regulatory Assurance Manager June 17, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Flood Hazard Reevaluation Documentation for Pilgrim Nuclear Power Station PNPS LETTER 2.15.044
Dear Sir or Madam:
Pilgrim Nuclear Power Station is submitting one copy on hard drive of the files related to the Flood Hazard Reevaluation. The list of files is contained in Attachment 1. The files listed in the first column with their titles listed in the second column are in pdf format.
The third column contains the Input/Output files. The listed spreadsheets are in Excel format. The file format is contained in the file name. For example LIP FLO2D is in FLO2D and requires the FLO2D program (COTS) to access the Input/Output files.
This letter contains no new regulatory commitments.
Should you have any questions concerning this letter, or require additional information, please contact Mr. Everett (Chip) Perkins Jr. at (508) 830-8323.
Sincerely, Everett (Chip) Perkins Jr.
EP/rmb ATTACHMENT 1: List of Input/Output Files Aoil
ý-[ (t X,