Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09152019330 June 2009Issuance of Amendment No. 192, Revise Technical Specifications 3.3, 3.7, and 3.8, CREVS and Actuation Instrumentation, TSTF-36-A, and Electric Power SystemsUltimate heat sink
Offsite Circuit
ML09181117330 June 2009CW-2009-06-Final Operating TestBoric Acid
High winds
Shutdown Margin
Job Performance Measure
Power change
Coast down
ML09181117830 June 20092009-06-FINAL OutlinesBoric Acid
Shutdown Margin
Severe Accident Management Guideline
Coast down
ML09181118130 June 20092009-06 - Final Written ExamBoric Acid
Shutdown Margin
Emergency Lighting
Severe Accident Management Guideline
ML09181118430 June 2009CW-2009-06-DRAFT Written Comments
ML09181118630 June 20092009-06 - Post Exam Analysis Comments
ML09181117030 June 2009CW-2009-06-DRAFT Written ExamBoric Acid
Shutdown Margin
Emergency Lighting
Severe Accident Management Guideline
ML09181116330 June 20092009-06-DRAFT Outline CommentsRod Drop Event
Power change
ML09181116130 June 20092009-06-DRAFT Operating TestSafe Shutdown
Boric Acid
High winds
Shutdown Margin
High Radiation Area
Job Performance Measure
Power change
Coast down
IR 05000483/200940326 June 2009IR 05000483-09-403, on 05/21/2009, for Callaway PlantAffidavit
ML09174039623 June 2009Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.9, Boron Dilution Mitigation System (Bdms)
Press Release-IV-09-024, NRC Conducting Special Inspection at Callaway Nuclear Plant22 June 2009Press Release-IV-09-024: NRC Conducting Special Inspection at Callaway Nuclear Plant
ML12244A56819 June 2009Enclosure 7: Preliminary Jurisdictional Wetland & Stream Determination Report for the Callaway Nuclear Plant
ULNRC-05902, Callaway, Unit 1, Enclosure 7: Preliminary Jurisdictional Wetland & Stream Determination Report for the Callaway Nuclear Plant19 June 2009Callaway, Unit 1, Enclosure 7: Preliminary Jurisdictional Wetland & Stream Determination Report for the Callaway Nuclear Plant
ML09168016817 June 2009Charter for Special Inspection Involving the Failure of the Turbine Driven Auxiliary Feedwater Pump to Start at the Callaway Plant
ML12306A07415 June 2009Assist to Staff: Investigative Support to Reactor Projects Branch with Interview of Allegers (Case No. 4-009-043/RIV-2009-A-0036)
ML09170002612 June 2009Comment (1) of T. A. Moser, on Behalf of Strategic Teaming & Resource Sharing (Stars) Alliance, on Draft Regulatory Guide DG-1211, Materials and Inspections for Reactor Vessel Closure Studs.
ML09162030611 June 2009CW-06-2009 - Examination Approval Letter
ML0916002538 June 2009Summary of Annual Performance Assessment Meeting with Amerenue for Callaway Plant
ULNRC-05633, Revision of Technical Specification 3.3.91 June 2009Revision of Technical Specification 3.3.9Boric Acid
Shutdown Margin
Anticipated operational occurrence
Earthquake
IR 05000483/20090071 June 2009IR 05000483-09-007; 01/29/2009 - 04/30/2009; Callaway Plant, Operability EvaluationsMission time
Significance Determination Process
Operability Determination
TAC:ME14111 June 2009
ULNRC-05893, Callaway, Unit 1, Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report29 May 2009Callaway, Unit 1, Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report
ML12271A45929 May 2009Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report
ML09147072526 May 2009Response to the Discrimination Concern Raised to Us Nuclear Regulatory Commission (NRC) Regarding Callaway Plant, Allegation RIV-2007-A-0092
TAC:ME132521 May 2009
TAC:ME132421 May 2009
ML09141047321 May 2009Acceptance Review Email, Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.3.2, ESFAS Instrumentation, and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs)
ML09141056921 May 2009Acceptance Review Email, Revise Technical Specification (TS) 3.7.3, Main Feedwater Regulating Valves (Mfivs) and Main Feedwater Regulating Valve Bypass Valves (Mfrvbvs), and TS 3.3.2, ESFAS Instrumentation
ML09141058221 May 2009Acceptance Review Email, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26
ML09161051121 May 2009Comments of Paul D. Parmenter on Behalf of State of Missouri Emergency Management Agency, Re Pr 50 and 52 Enhancements to Emergency Preparedness Regulations Requesting for an Extension of the Comment Period
ULNRC-05615, Callaway, Unit 1 - Operating Quality Assurance Manual (Oqam), Revision 2721 May 2009Callaway, Unit 1 - Operating Quality Assurance Manual (Oqam), Revision 27
ML09154009521 May 2009Operating Quality Assurance Manual (Oqam), Revision 27
ULNRC-05632, Core Operating Limits Report, Cycle 17, Revision 120 May 2009Core Operating Limits Report, Cycle 17, Revision 1Shutdown Margin
Press Release-IV-09-016, NRC to Discuss 2008 Performance Assessment for Callaway Nuclear Plant14 May 2009Press Release-IV-09-016: NRC to Discuss 2008 Performance Assessment for Callaway Nuclear Plant
ML09154009913 May 2009Callaway - Operating Quality Assurance Manual (Oqam), Rev. 027Safe Shutdown
Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
ULNRC-05615, Callaway - Operating Quality Assurance Manual (Oqam), Rev. 02713 May 2009Callaway - Operating Quality Assurance Manual (Oqam), Rev. 027Safe Shutdown
Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
ULNRC-05609, Adoption of Industry Trawler TSTF-511 (Rev 0), Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (License Amendment Request LDCN 09-0014)4 May 2009Adoption of Industry Trawler TSTF-511 (Rev 0), Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (License Amendment Request LDCN 09-0014)Safe Shutdown
Fitness for Duty
ML0912402764 May 2009Notice of Annual Assessment Public Meeting with Amerenue to Present and Discuss Performance Results of the Callaway Plant for the Period of January 1 Through December 31, 2008
ULNRC-05608, ULNRC-05608, Revision of Technical Specification 3.3.2 and 3.7.3 (License Amendment Request OL-1289)4 May 2009ULNRC-05608, Revision of Technical Specification 3.3.2 and 3.7.3 (License Amendment Request OL-1289)Ultimate heat sink
Stroke time
Anticipated operational occurrence
Earthquake
ULNRC-05566, Amplification for Amendment, Revision of Technical Specification 3.3.2 and 3.7.2 and Addition of New Technical Specification 3.7.19 (License Amendment Request OL-1277 Revised)4 May 2009Amplification for Amendment, Revision of Technical Specification 3.3.2 and 3.7.2 and Addition of New Technical Specification 3.7.19 (License Amendment Request OL-1277 Revised)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Earthquake
ULNRC-05620, Clarification Regarding Application of ASME Code Relief Request Approved for Callaway1 May 2009Clarification Regarding Application of ASME Code Relief Request Approved for CallawayNondestructive Examination
ULNRC-05621, 2008 Annual Radioactive Effluent Release Report30 April 20092008 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ULNRC-05622, 2008 Annual Radiological Environmental Operating Report30 April 20092008 Annual Radiological Environmental Operating ReportGrab sample
Met Tower
Annual Radiological Environmental Operating Report
Deep Dose Equivalent
ULNRC-05619, Cycle 16 Commitment Change Summary Report30 April 2009Cycle 16 Commitment Change Summary Report
IR 05000483/200900228 April 2009IR 05000483-09-002, on 01/01/2009 - 03/24/2009, Callaway Plant Integrated Resident and Regional Report, Event Follow-upShutdown Margin
Probabilistic Risk Assessment
Temporary Modification
Aging Management
Significance Determination Process
Fire Protection Program
L-00-006, Email Sending Electronic Copy of NSAL-00-006 to Document Relief Request Classification of Pressurizer Upper Level Instrument, Other Lines, and Associated Components27 April 2009Email Sending Electronic Copy of NSAL-00-006 to Document Relief Request Classification of Pressurizer Upper Level Instrument, Other Lines, and Associated Components
ML09120047523 April 2009Submittal of Cash Flow Projection and Certification to Satisfy the Guarantee of Payment of Retrospective Premiums 10 CFR 140.21
ML12306A07517 April 2009RIV-2006-A-0033 - Callaway
ML09105020414 April 2009Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway