Category:- No Document Type Applies
MONTHYEARML24275A0452024-09-24024 September 2024 Procedure Review Form - EOF Notification Package ML24275A0482024-09-24024 September 2024 Procedure Review Form - Callaway, Control Room Notification Flowchart ML24256A0762024-07-25025 July 2024 Review Form - Radiological Emergency Response Plan (RERP) ML24256A0792024-07-0101 July 2024 Review Form - Activation and Operation of the Joint Information Center ML24256A0712024-07-0101 July 2024 Review Form - Emergency Implementing Actions ML24086A3722024-02-13013 February 2024 EIP-ZZ-C0010 Addendum C R013 PRF: Plant Assessment Coordinator (Pac) Checklist ML23341A1902023-12-0707 December 2023 Enclosujustification for Exemption Request from Specific Requirements in 2023 Security Rule ML23354A1132023-10-26026 October 2023 Off-Site Liaison Coordinator Checklist ML23354A1112023-10-26026 October 2023 Logistics Support Coordinator Checklist ML23354A1092023-10-26026 October 2023 Protective Measures Coordinator Checklist ML24002A8132023-07-25025 July 2023 EIP-ZZ-00240 Add E, Rev. 28, Health Physics Coordinator (Hpc) Checklist ML23150A1872023-05-18018 May 2023 Submittal of EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist ML23164A0262023-05-18018 May 2023 Procedure Review Form - Emergency Coordinator (EC) Checklist ML23150A1902023-05-18018 May 2023 Submittal of EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML22153A1922022-06-0202 June 2022 Enclosure 3 - List of Commitments ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21335A4622021-12-0101 December 2021 Enclosure 10: ARCON96-NAI Output Summary Logs ML21335A4632021-12-0101 December 2021 Enclosure 11: ARCON96-NAI Output Cumulative Frequency Distribution Results ML21335A4542021-12-0101 December 2021 Enclosure 2: Full Scope Implementation of Alternative Source Term - Evaluation of Proposed Changes ML21335A4612021-12-0101 December 2021 Enclosure 9: ARCON96-NAI Input Run Specifications ML21335A4642021-12-0101 December 2021 Enclosure 12: PAVAN-NAI Input Meteorological Data and Run Specifications for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ULNRC-06696, Enclosure 13: PAVAN-NAI Output for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary2021-12-0101 December 2021 Enclosure 13: PAVAN-NAI Output for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ML21335A4662021-12-0101 December 2021 Enclosure 14: Summary of Differences Between ARCON96 and ARCON96-NAI and Between Pavan and PAVAN-NAI Codes ML21090A1892021-03-31031 March 2021 Enclosure 4 - Acronyms and Definitions ULNRC-06604, Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report2020-10-22022 October 2020 Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report ML20080H2382020-03-17017 March 2020 Enclosure - Nuclear Property Insurance NRC Property Rule 10 CFR 50.54(W) Reporting Requirements ML19325D6712019-11-21021 November 2019 Attachment 1 - Callaway Regulatory Commitment Update ML19225D3232019-08-12012 August 2019 Attachment 1 - List of Regulatory Commitments ML19024A4712019-01-23023 January 2019 Attachment 1 - NRC Audit Questions and Responses ML19024A4752019-01-23023 January 2019 Attachment 5 - List of Regulatory Commitments ML17097A5672017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ULNRC-06349, joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund2017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ML17362A0642017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ULNRC-06400, Enclosure 7: Ameren Corporation by - Laws Effective 02/10/20172017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ML17097A5662016-12-31031 December 2016 Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ULNRC-06349, Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits2016-12-31031 December 2016 Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ML16348A3762016-12-13013 December 2016 Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation2016-12-13013 December 2016 Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/20162016-09-30030 September 2016 Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3822016-09-30030 September 2016 Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3812016-06-30030 June 2016 Enclosure 7 - 10-Q Filed Period 6/30/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/20162016-06-30030 June 2016 Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/2016 ML16348A3802016-03-31031 March 2016 Enclosure 6 - 10-Q Filed Period 3/31/2016 ML16348A3882016-03-31031 March 2016 Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ML17097A5682016-03-30030 March 2016 Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement ULNRC-06349, Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement2016-03-30030 March 2016 Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement 2024-09-24
[Table view] Category:License-Operator
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1282022-02-23023 February 2022 CW-2022-02-FINAL Written Examination ML22081A1232022-02-23023 February 2022 CW-2022-02-DRAFT Outline Comments ML22081A1212022-02-23023 February 2022 CW-2022-02-DRAFT Op Test Comments ML22081A1222022-02-23023 February 2022 CW-2022-02-DRAFT Op Test ML22081A1252022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam Comments ML22081A1242022-02-23023 February 2022 CW-2022-02-DRAFT Outlines ML22081A1262022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam ML22081A1272022-02-23023 February 2022 CW-2022-02-FINAL Op Test ML22105A0062022-02-23023 February 2022 CW-2022-02-FINAL Outlines ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML21067A5392021-03-0808 March 2021 Notification of NRC Initial Operator Licensing Examination 05000483/2022301 ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments 2024-08-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1282022-02-23023 February 2022 CW-2022-02-FINAL Written Examination ML22081A1232022-02-23023 February 2022 CW-2022-02-DRAFT Outline Comments ML22081A1212022-02-23023 February 2022 CW-2022-02-DRAFT Op Test Comments ML22081A1222022-02-23023 February 2022 CW-2022-02-DRAFT Op Test ML22081A1252022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam Comments ML22081A1242022-02-23023 February 2022 CW-2022-02-DRAFT Outlines ML22081A1262022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam ML22081A1272022-02-23023 February 2022 CW-2022-02-FINAL Op Test ML22105A0062022-02-23023 February 2022 CW-2022-02-FINAL Outlines ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test 2024-08-05
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: Callaway First Exam Date: 6/19/09 Written Exam Outline (4/6/09)
Comment Resolution 1 None.
2 3
4 5
Administrative JPM Outline (4/6/09)
Comment Resolution R&SA1: Ensure the QPTR calc is not It is not the same. This is manual calc.
1 duplicated in scenario 2, rod drop event.
Re-label: RO( A1a, RA2, RA3, RA4) Changed 2
SRO(A1a, SA2, SA3, SA4, SA5)
ES-301-1 and -2 are not the correct Resubmitted 3 revision: Resubmit with Rev. 9 Supplement 1 revision.
Do the tagout review in the classroom, Changed location.
4 not the simulator.
5 Control Room / In-Plant System JPM Outline (4/6/09)
Comment Resolution 1 Identify the RCA in-plant. (K) is in the RCA. Form corrected 2 JPM e. is ESF. (EN) Supp. 1 forms provided.
3 Re-Label: S1, S2,,S8, P1, P2, P3 Changed 4
5 Simulator Scenario Outline Comments (4/6/09)
Comment Resolution Transient and Event checklist identifies Scenario 4 is the backup. Will submit.
1 scenario 2 as the backup. Shouldnt this Backup submitted. Forms corrected. OBDI 202 - IOLE Process
be scenario 3?
T and E CL double counts the normal Corrected and reactivity evolutions for the BOP, ATC and CRS positions. There is only one or the other. The RO should get the 2 credit for Rx manipulation. The BOP and CRS should get NORMALS. If there is a component failure requiring a power change, then this can count as a Rx manipulation or I/C, but not both.
Scenario 1 Event 1: Critical task Changed 3
identified is not a critical task.
Scenario 2 Event 2: Critical task Changed 4
identified is not a critical task.
Scenarios 2 and 1 have a failure of a Removed pump failure on Scenario 2 5
CCP to Auto start. Change this.
Scenario 2: Start at 60% and raise Done 6
power to 65%.
(ALL) We will not grade the EP OK 7 declarations unless it is incorporated into an admin JPM.
8 (ALL) Reactivity manip credits incorrect Corrected (SB) Event 5 is not reactivity manip since Corrected 9
this is an auto power change.
ES-301-5 incorrect crediting for events A Corrected 10 and 3 for scenario 1 and 2 Scenario 3: Need to determine an actual Will be 30 percent.
11 spray valve failure amount - do not guess.
Schedule: R5 will have to stand watch on 3rd scenario per 1021, Rev. 9, Supp. 1. (Schedule changed)
Security Agreement: Where is the exam developer on the security agreement? (Security agreement provided) OBDI 202 - IOLE Process