Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML092020231 | 30 June 2009 | CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Page 63 Through 128, Enclosure 4 | |
ML091810090 | 30 June 2009 | Initial Exam 2008-302 Draft Sim/In-Plant JPMs | Squib Job Performance Measure |
ML091810102 | 30 June 2009 | Initial Exam 2008-302 Draft Administrative Documents | |
ML091810120 | 30 June 2009 | Initial Exam 2008-302 Draft SRO Written Exam | Safe Shutdown Unanalyzed Condition Time of Discovery Shutdown Margin Reactor Vessel Water Level Half scram Fire Barrier Operator Manual Action Squib Abnormal operational transient Scram Discharge Volume Severe Accident Management Guideline Earthquake Fuel cladding Offsite Circuit Fire Watch Grace period Coast down |
ML091810122 | 30 June 2009 | Initial Exam 2008-302 Draft Simulator Scenarios | Half scram Stroke time Severe Accident Management Guideline Power change |
ML091810124 | 30 June 2009 | Initial Exam 2008-302 Final Simulator Scenarios | Half scram Stroke time Squib Scram Discharge Volume Overtravel Power change |
ML091810128 | 30 June 2009 | Initial Exam 2008-302 Final Administrative JPMs | Fitness for Duty Grab sample Met Tower Job Performance Measure |
ML091810132 | 30 June 2009 | Initial Exam 2008-302 Final SIM/In-Plant JPMs | Safe Shutdown Squib Job Performance Measure |
ML091810066 | 30 June 2009 | Initial Exam 2008-302 Draft Administrative JPMs | Fitness for Duty High Radiation Area Grab sample Met Tower Job Performance Measure Deep Dose Equivalent Affidavit |
ML091810062 | 30 June 2009 | Initial Exam 2008-302 Draft RO Written Exam | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Half scram Hydrostatic Squib Foreign Material Exclusion Scram Discharge Volume Feedwater Controller Failure Severe Accident Management Guideline Overtravel Fuel cladding |
ML092020229 | 30 June 2009 | CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Introduction Through Page 62, Enclosure 4 | Finite Element Analysis Liquid penetrant |
ML093080160 | 30 June 2009 | Attachment 9, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2807(NP), Revision 0, Thermal Hydraulic Design Report for ATRIUM-10 Fuel Assemblies | Anticipated operational occurrence |
ML091760260 | 30 June 2009 | Corrections to Amendment Nos. 274, 301, and 260 Regarding Control Rod Notch Test Frequency | |
ML093350658 | 30 June 2009 | ANP-2821(NP), Rev. 0, Browns Ferry Unit 1 Thermal-Hydraulic Design Report for ATRIUM-10 Fuel Assemblies (105% Oltp). | Anticipated operational occurrence |
ML101160154 | 30 June 2009 | ANP-2821(NP), Revision 0, Browns Ferry Unit 1 Thermal-Hydraulic Design Report for ATRIUM-10 Fuel Assemblies (105% Oltp). | Anticipated operational occurrence |
ML091800453 | 29 June 2009 | Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop | License Renewal |
ML091770540 | 26 June 2009 | Cancellation of Meeting Notice, Meeting with the Tennessee Valley Authority (TVA) to Discuss Extended Power Uprate at Browns Ferry | |
ML091810046 | 26 June 2009 | Tennessee Valley Authority - Submittal of Report in Accordance with 10 CFR 26.719 (c)(1) for Drug and Alcohol Testing Errors | |
ML091740032 | 22 June 2009 | Notification of Browns Ferry Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 0500259-09-008, 05000260-09-008, and 05000296-09-008 | Probabilistic Risk Assessment |
ML091730506 | 22 June 2009 | Pant - Notification of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (NRC Inspection Report No. 05000259-09-009, 05000260-09-009, and 05000296-09-009 | Safe Shutdown Fitness for Duty Fire Barrier Fire impairment Temporary Modification Fire Protection Program |
ML091750095 | 19 June 2009 | Technical Specifications (TS) Change TS-466-T - Request for One-time Extensions of TS 3.8.1 Condition B Required Action B.4 Completion Time - Emergency Diesel Generators (Edgs) a, B, C, D, 3A, 3B, 3C, and 3D | Safe Shutdown |
ML091670045 | 18 June 2009 | Status of Decommissioning Funding Assurance | |
ML091670080 | 18 June 2009 | Status of Decommissioning Funding Assurance | |
ML091670071 | 18 June 2009 | Status of Decommissioning Funding Assurance | |
ML091630742 | 16 June 2009 | Notice of Meeting with the Tennessee Valley Authority (TVA) to Discuss Extended Power Uprate | |
ML091200040 | 16 June 2009 | Safety Evaluation for Relief Request 2-ISI-18R1 Associated with Inservice Inspection Examination Coverage | Weld Overlay Incorporated by reference |
TAC:MD9359 | 16 June 2009 | ||
TAC:ME1319 | 12 June 2009 | ||
ML091680143 | 12 June 2009 | Core Operating Limits Report (COLR) for Cycle 16 Operation | Shutdown Margin |
ML091610499 | 12 June 2009 | Verbal Relief Related to Instrument Line Weld Overlay (TAC No. ME1319) (2-ISI-21) | Weld Overlay Hydrostatic Through-Wall Leak |
ML091380530 | 9 June 2009 | Request for Additional Information for Extended Power Uprate - Round 24 (TAC MD5262) (TS-431) | |
TAC:ME0889 | 4 June 2009 | ||
ML091390631 | 4 June 2009 | ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides | Probabilistic Risk Assessment Nondestructive Examination Cyber Security Fuel cladding |
ML091120032 | 4 June 2009 | G20090158/EDATS: OEDO-2009-0133 - March 18, 2009, ACRS Ltr on Using Containment Accident Pressure in Determining Available Net Positive Suction Head of Emergency Core Cooling System and Containment Heat Removal System Pumps | |
ML091520545 | 3 June 2009 | Summary of Meeting with the Tennessee Valley Authority Regarding Proposed Fuel Transition Amendment | |
ML090770162 | 3 June 2009 | TVA, Presentation Slides for Browns Ferry, Unit 1 | |
ML092020224 | 31 May 2009 | CDI Technical Note No. 08-13NP, Rev. 1, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2, Enclosure 6 | Finite Element Analysis |
ML110831041 | 31 May 2009 | Engineering Evaluation of Hesco Barriers Performance at Fargo, Nd 2009, Wenck File 2283-01, Enclosure 2 | Hydrostatic |
ML091540015 | 29 May 2009 | Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.209 Regarding Steam Dryer Analyses | Flow Induced Vibration |
ML091050704 | 29 May 2009 | Issuance of Amendments 274, 301 and 260 Regarding Control Rod Notch Test Frequency (TS-462) | Anticipated operational occurrence Functionality Assessment Fuel cladding |
TAC:ME0024 | 29 May 2009 | ||
ML091540014 | 26 May 2009 | Response to Request for Additional Information Regarding Technical Specifications Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force Change Number - 448, Rev. 3. | |
ML091470208 | 22 May 2009 | American Society of Mechanical Engineers (ASME) Section Xl, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-1Sl-21, Revision 1 - Resubmittal | Weld Overlay Nondestructive Examination |
ML110691285 | 22 May 2009 | E-mail from D. Frumkin, NRR to B. Metzger, NRR FW: Support for Manual Action Exemption Reviews | |
ML091470283 | 21 May 2009 | Withdrawal of Proposed Request for Exemption from 10 CFR 50.55a, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-ISI-22 | Hydrostatic |
TAC:ME1320 | 21 May 2009 | ||
ML091380077 | 19 May 2009 | Project Manager and Backup Reassignments | |
ML091410285 | 18 May 2009 | American Society of Mechanical Engineers Section XI, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-ISI-22 | Weld Overlay Hydrostatic VT-2 Through-Wall Leak Through Wall Leak Dissimilar Metal Weld |
ML091390642 | 18 May 2009 | American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld Overlays | Weld Overlay Nondestructive Examination |
ML091540530 | 8 May 2009 | Bertram Morris, E-mail Chart Table of COP That Have Been Granted to Other BWRs for EPU |