ML091540014

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Regarding Technical Specifications Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force Change Number - 448, Rev. 3.
ML091540014
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/26/2009
From: West R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TVA-BFN-TS-444
Download: ML091540014 (7)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 26, 2009 TVA-BFN-TS-444 10 CFR 50.

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - RESPONSE FOR TO REQUEST FOR ADDITIONAL INFORMATION REGARDING UNITS 1, 2, AND 3 - TECHNICAL SPECIFICATIONS (TS) CHANGE 444 - ADOPTION OF CHANGES TO STANDARD TECHNICAL SPECIFICATIONS UNDER TECHNICAL SPECIFICATION TASK FORCE (TSTF) CHANGE NUMBER - 448, REVISION 3, REGARDING CONTROL ROOM ENVELOPE HABITABILITY This letter responds to the May 8, 2009, NRC verbal request that BFN provide NRC with revised TS 3.7.7 Condition F. The Enclosure provides a revision to the Units 1, 2, and 3 TS pages as requested by the Staff.

The revised pages do not alter the original determination that there are no significant hazards considerations associated with the proposed changes, nor do the changes alter the originally submitted Environmental Assessment and Finding of No Significant Impact provided by TVA's March 27, 2008 letter.

U.S. Nuclear Regulatory Commission Page 2 May 26, 2009 In accordance with 10 CFR 50.91 (b)(1), TVA is sending a copy of this letter and the Enclosures to the Alabama State Department of Public Health. TVA currently plans to implement TS-444 within 60 days of NRC approval.

If you have any questions about this TS change, please contact F. R. Godwin at (256) 729-2636.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 26, 2009.

Si cerely,

. G. West Vice President Browns Ferry Nuclear Plant

Enclosure:

Proposed Technical Specifications Changes (Revised Mark-up)

U.S. Nuclear Regulatory Commission Page 3 May 26, 2009 cc: (Enclosures):

State Health Officer Alabama State Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Eugene F. Guthrie, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970

Enclosure Browns Ferry Nuclear Plant (BFN)

Units 1, 2, and 3 Technical Specifications (TS) Change 444 Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (TSTF) Change Number - 448, Revision 3, Regarding Control Room Envelope Habitability Proposed Technical Specifications Changes (Revised Mark-up)

Enclosed pages to TS 3.7.3.

CREV System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F.: Two CREV subsystems KI.. Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

OR One or more CREV subsystems inoperable due to an inoperable CRE Boundary during OPDRVs, BFN-Unit 1 3.7-11 Amendment No. 234,426, 251 September 27, 2004

CREV System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F; Two CREV subsystems .-RI- Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

One or more CREV subsystems inoperable due to an inoperable CRE Boundary during OPDRVs.

BFN-Unit 2 3.7-12 Amendment No. 2-4-,283 290 September 27, 2004

CREV System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F.' Two CREV subsystems F~i. Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

One or more CREV subsystems inoperable due to an inoperable CRE Boundary during OPDRVs.

BFN-Unit 3 3.7-12 Amendment No.-214,24-1 249 September 27, 2004