Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML06173016430 June 2006Enclosure 4: CPSES Comments on and Input to NRC Draft Trip ReportCoatings
ML06128058030 June 2006Memo with Enclosures 1 and 2, - Trip Report Regarding Staff Observations Regarding Flume Testing of a Prototype Portion of the Proposed Replacement Suction Screen Design for the Comanche Peak Steam Electric StationCoatings
ML06131052030 June 2006Enclosure 3: Pictures of Cpses/Pci Prototype Strainer Testing (Tests 1 and 5)
CPSES-200601160, Revised Response to the 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.29 June 2006Revised Response to the 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.Anticipated operational occurrence
Offsite Circuit
CPSES-200601299, Supplement to Relief Request P-1 to the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)29 June 2006Supplement to Relief Request P-1 to the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)Internal Flooding
TAC:MC538529 June 2006
CPSES-200601296, Response to RAI, Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds..27 June 2006Response to RAI, Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds..Dissimilar Metal Weld
TAC:MC950327 June 2006
CPSES-200601177, Supplement to License Amendment Request (LAR) 05-010 Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System.23 June 2006Supplement to License Amendment Request (LAR) 05-010 Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System.
CPSES-200601101, Relaxation Request for NRC Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors22 June 2006Relaxation Request for NRC Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsBoric Acid
Nondestructive Examination
CPSES-200601155, Response to Request for Additional Information Re 2005 Steam Generator Tube Inspections12 June 2006Response to Request for Additional Information Re 2005 Steam Generator Tube Inspections
CPSES-200601043, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations8 June 200660-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier ConfigurationsSafe Shutdown
Fire Barrier
Hemyc
Exemption Request
CPSES-200601056, Response to Request for Additional Information Related to License Amendment Request (LAR) 2004-010 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity7 June 2006Response to Request for Additional Information Related to License Amendment Request (LAR) 2004-010 Application for Technical Specification Improvement Regarding Steam Generator Tube IntegrityUltimate heat sink
Non-Destructive Examination
Post Accident Monitoring
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Pressure Boundary Leakage
CPSES-200601004, Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power31 May 2006Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu PowerIncorporated by reference
TAC:MC347023 May 2006
ML06136008723 May 2006Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Comanche Peak Steam Electric Station, Units 1 and 2Boric Acid
Nondestructive Examination
Through-Wall Leak
CPSES-200600994, Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval)18 May 2006Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval)Liquid penetrant
ML06144063218 May 2006CPSES - Retake Exam - 09/2005 - Public Forms
ML06122045618 May 2006Attachment 1 to Comanche Peak Conference Call
ML06122044818 May 2006Attachment 2 to Comanche Peak Conference Call
ML06122043618 May 2006Attachment 3 to Comanche Peak Conference Call
ML06089031418 May 2006Summary of Conference Calls, 2005 Steam Generator Tube Inspections
TAC:MC862118 May 2006
IR 05000445/20060024 May 2006IR 05000445-06-002, IR 05000446-06-002 on 01/01/2006-03/24/2006; Comanche Peak Steam Electric Station, Units 1 and 2; Event Followup, Other ActivitiesSafe Shutdown
High Radiation Area
Stroke time
Slow transfer
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Large early release frequency
Maintenance Rule Program
Power change
ML0612302842 May 20065/1/2006, Summary of Meeting with Txu Energy Regarding Comanche Peak End-Of-Cycle Assessment
CPSES-200600870, (Cpses), Transmittal of Year 2005 Radioactive Effluent Release Report28 April 2006(Cpses), Transmittal of Year 2005 Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Process Control Program
CPSES-200600871, Transmittal of the Annual Radiological Environmental Operating Report for 200528 April 2006Transmittal of the Annual Radiological Environmental Operating Report for 2005Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CPSES-200600904, Submittal of the Annual Non-Radiological Environmental Operating Report for 200528 April 2006Submittal of the Annual Non-Radiological Environmental Operating Report for 2005
Press Release-IV-06-004, NRC to Discuss 2005 Performance at Comanche Peak25 April 2006Press Release-IV-06-004: NRC to Discuss 2005 Performance at Comanche Peak
ML06086025824 April 2006License Amendment, Issuance of Amendments Revision to TS 3.7.5 for Auxiliary Feedwater System
ML06116006424 April 2006Technical Specification Pages 3.7.5 for Auxiliary Feedwater System
ML06109086719 April 2006Notice of Meeting with Txu Energy to Present and Discuss Performance Results of the Comanche Peak Station for the Period of January 1 Through December 31, 2005
IR 05000445/200600817 April 2006IR 05000445-06-008, 05000446-06-008; on 03/13/06-03/17/06; Comanche Peak Steam Electric Station, Units 1 & 2; Radioactive Material Processing and Transportation, Radioactive Material Control ProgramHigh Radiation Area
Offsite Dose Calculation Manual
Significance Determination Process
ML07023039013 April 2006Keeler Long DBA Testing of Coating Supplies
ML07023039813 April 2006Report 06-0413 Chart End Test
ML07023040013 April 2006Default-Graph 001
ML06172015912 April 2006Individual Invitation Letter to Public Annual Performance Assessment Meeting Regarding Comanche Peak Steam Electric Station
ML07023039610 April 2006Report 06-0413 Chart 250-200
IR 05000445/20050057 April 2006Errata for Comanche Peak Steam Electric Station - NRC Integrated Inspection Report 05000445-05-005 and 05000446-05-005Boric Acid
Condition Adverse to Quality
Liquid penetrant
ML0610102517 April 2006Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
ML0702303926 April 2006Report 06-0413 Chart 7
ML0702303956 April 2006Report 06-0413 Chart 120-307
ML0702303976 April 2006Report 06-0413 Chart 307-250
CPSES-200600652, Transmittal of Revised Comanche Peak Steam Electric Station Security Plan, Revision 14 April 2006Transmittal of Revised Comanche Peak Steam Electric Station Security Plan, Revision 1
CPSES-200600580, 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.3 April 200660-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.Anticipated operational occurrence
Offsite Circuit
ML0609307603 April 2006Letter Dtd 04/03/06 from Bruce S. Mallett, RA to Mike Blevins, Sr. VP and CNO, Txu Power (Cpses), Thank You for Administrative Staff Site Tours