Text

AFVV System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY S R 3.7.5.1 - ------------ NOTE-----------------------------------

AFW train(s) may be considered OPERABLE during alignment and operation for steam generator level control, if it is capable of being manually realigned to the AFW mode of operation.

Verify each AFW manual, power operated, and automatic 31 days valve in each water flow path, and in both steam supply flow paths to the steam turbine driven pump, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SFR 3.7.5.2 ------------------------------- NOTE-----------------------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after 2 532 psig in the steam generator.

Verify the developed head of each AFW pump at the flow In accordance with test point is greater than or equal to the required the Inservice developed head. testing Program SR 3.7.5.3 ------------------------------- NOTE-----------------------------------

AFW train(s) may be considered OPERABLE during alignment and operation for steam generator level control, if it is capable of being manually realigned to the AFW mode of operation.

Verify each AFW automatic valve that is not locked, 18 months sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.7-14 Amendment No. 126

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

+

SR 3.7.5.4 ------------------------------NOTES------------------------------------

1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after 2 532 psig in the steam generator.
2. AFW train(s) may be considered OPERABLE during alignment and operation for steam generator level control, if it is capable of being manually realigned to the AFW mode of operation.

Verify each AFW pump starts automatically on an actual 18 months or simulated actuation signal.

COMANCHE PEAK - UNITS 1 AND 2 3.7-15 Amendment No. 126