Enclosure 3 Pictures of CPSES/PCI Prototype Strainer Testing Tests 1 and 5
CPSES Prototype Strainer Approach velocity = 0.5 % of scale 0.0073 fps 20.23 sq ft
Alden Labs Flume Testing Test 1 - Design Basis LOCA 2006-03-08_Test 1_0022_Flood up
Alden Labs Flume Testing 2006-03-08_Test 1_0023_Flood up
Alden Labs Flume Testing 2006-03-08_Test 1_0028_Flood up
Alden Labs Flume Testing 2006-03-08_Test 1_0031_Full flow mixing
Test 1 Data Alden Labs Flume Testing Test 5 added the Wolf Creek Nukon load to Test 1 (+ 1700 cu ft, 4080 lbm fiber) 2006-03-08_Test 5_0003_Adding Nukon to Test 1
Test 5 Flume Profile Alden Labs Flume Testing There was no significant measurable head loss during Test 5 2006-03-08_Test 5_0012_Draindown
Tests 1 & 5 Combined Debris Test 5 - CPSES + Wolf Creek Debris