MONTHYEARCPSES-201001000, Operator Licensing Examination Data, Form 5362010-07-28028 July 2010 Operator Licensing Examination Data, Form 536 CPSES-200901377, Operator Licensing Examination Data2009-09-29029 September 2009 Operator Licensing Examination Data CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times.2007-11-15015 November 2007 Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-10-22022 October 2007 Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0909 October 2007 Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments2007-10-0202 October 2007 Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data2007-08-29029 August 2007 Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval)2007-08-22022 August 2007 Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits2007-08-16016 August 2007 Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 20082007-08-0303 August 2007 Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 CPSES-200701284, (Cpses), Operator Licensing Examination Data2007-08-0202 August 2007 (Cpses), Operator Licensing Examination Data CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses2007-07-31031 July 2007 Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 72007-07-20020 July 2007 Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-07-18018 July 2007 Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)2007-07-17017 July 2007 Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-06-21021 June 2007 Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-0092007-06-19019 June 2007 (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 CPSES-200701059, Submittal of Startup Report, Cycle 132007-06-13013 June 2007 Submittal of Startup Report, Cycle 13 CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves2007-05-22022 May 2007 License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves CPSES-200700915, Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability2007-05-0707 May 2007 Supplemental Response to Request for Information on Generic Letter 2003-01, Control Room Habitability CPSES-200700871, Transmittal of Year 2006 Radioactive Effluent Release Report2007-04-30030 April 2007 Transmittal of Year 2006 Radioactive Effluent Release Report CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 CPSES-200700517, Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change2007-04-18018 April 2007 Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200700605, License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report2007-04-10010 April 2007 License Amendment Request (LAR) 07-003, Revision to Technical Specifications 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, & 5.6.5b, Core Operating Limits Report CPSES-200700708, Evaluation of Pressurizer Weld Overlay Confirmatory Analyses2007-04-0505 April 2007 Evaluation of Pressurizer Weld Overlay Confirmatory Analyses CPSES-200700691, Core Operating Limits Report, Cycle 132007-04-0404 April 2007 Core Operating Limits Report, Cycle 13 CPSES-200700663, Transmittal of the Annual Radiological Environmental Operating Report for 20062007-03-30030 March 2007 Transmittal of the Annual Radiological Environmental Operating Report for 2006 CPSES-200700607, Property Damage Insurance2007-03-29029 March 2007 Property Damage Insurance CPSES-200700606, Decommissioning Report2007-03-29029 March 2007 Decommissioning Report CPSES-200700573, Request to Withdraw Relief Request A-72007-03-22022 March 2007 Request to Withdraw Relief Request A-7 CPSES-200700571, Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186)2007-03-19019 March 2007 Supplement to License Amendment Request (LAR) 05-06; Revision to Technical Specification 5.6.5 Revise Listing of LOCA and Non-LOCA Analysis Methodologies (TAC Nos. MD0185/0186) CPSES-200700515, Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.2007-03-0909 March 2007 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. CPSES-200700454, Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data2007-02-28028 February 2007 Transmittal of Second-Half 2006 Fitness-For-Duty Program Performance Data CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports2007-02-22022 February 2007 Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)2007-02-22022 February 2007 Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-02-20020 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 20062007-02-0808 February 2007 Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date..2007-02-0202 February 2007 Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds2007-01-30030 January 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2007-01-29029 January 2007 Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)2007-01-24024 January 2007 Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits2007-01-18018 January 2007 License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature2007-01-10010 January 2007 Annual Report of Changes in Peak Cladding Temperature CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2006-12-19019 December 2006 License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.2006-12-19019 December 2006 License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. 2010-07-28
[Table view] |
Text
6-4,TXU v', Power TXu Power Mike Blevins Comanche Peak Steam Senior Vice President &
Eiectric Station Chief Nuclear Officer Ref: 10 CFR 50.55a P.O. Box 1002 (EO1)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200601296 Log # TXX-06101 June 27, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-446 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION, RELIEF REQUEST A-1 FOR THE UNIT 2 INSERVICE INSPECTION FOR APPLICATION OF AN ALTERNATIVE TO THE ASME BOILER AND PRESSURE VESSEL CODE SECTION XI EXAMINATION REQUIREMENTS FOR CLASS 1 AND 2 PIPING WELDS (INTERVAL START DATE-AUGUST 3,2004, SECOND INTERVAL)
TAC NUMBER MC9503 REF: TXU Power letter, logged TXX-05204, from Mike Blevins to the NRC dated December 15, 2005 Gentlemen:
By means of the referenced letter, TXU Generation Company LP (TXU Power) previously submitted relief from the ASME Section XI code examination requirements for inservice inspection of Class 1 and 2 piping welds (Categories B-F, B-J, C-F-I, and C-F-2) for Comanche Peak Steam Electric Station (CPSES) Unit 2.
Based upon questions provided by Mr. Mohan Thadani of the NRC in an email dated June 1, 2006, TXU Power hereby provides the following additional information.
Attachment I to this letter contains the NRC questions and TXU Power's response immediately following each question.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak
- Diablo Canyon - Palo Verde
- 10ý11 South Texas Project
TXX-061 01 Page 2 of 2 This communication contains no new licensing basis commitments concerning CPSES Unit 2.
Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: k Z: z
/ Fred W. Madden" Director, Regulatory Affairs JCH Attachment c- B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachment I to TXX-06101 "Page I of 4 TXU POWER COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST A-I FOR THE UNIT 2 INSERVICE INSPECTION FOR APPLICATION OF AN ALTERNATIVE TO THE ASME BOILER AND PRESSURE VESSEL CODE SECTION XI EXAMINATION REQUIREMENTS FOR CLASS I AND 2 PIPING WELDS TAC NUMBER MC9503 DOCKET No. 50-446
Attachment I to TXX-06101 Page 2 of 4
- 1. NRC Ouestion:
What system are segments I -ACC03A and I-ACC03B in, and what was the effect on Table I when the consequence changed from medium to high?
- 2. NRC Ouestion:
What changes to the number of components selected for inspection were made as a result of he consequence change from medium to high for the segment I -RHR08A? Explain the rationale for any change or the number remaining the same.
TXU Response to I and 2:
The changes referenced in these two questions are subject to a common rationale. I -ACC03A and 1 -ACC03B are not piping segment designators, but rather are consequence identifiers associated with SIS piping segments SIS-017, SIS-018, SIS-019 and SIS-020. 1-RHR08A is not a piping segment designator, but rather a consequence identifier associated with SIS piping segment SIS-066. These segments are not subject to any degradation mechanism, which results in a failure potential rank of Low. In conjunction with the previous consequence rank of Medium, they were Risk Category 6a, Low risk, with no associated inspections. The change in consequence rank to High resulted in a Risk Category 4, Medium Risk. RI-ISI weld selections are made based on the total weld count in a particular Risk Category in a specific system. The addition of these piping segments, in conjunction with the change resulting from the increase in Consequence SI101 from Medium to High, resulted in an increase in the weld count of 142 welds for Risk Category 4 in the SIS system. Since Risk Category 4 requires inspection of 10% of the population, the RI-ISI inspections for SIS Risk Category 4 were increased by 15.
, Attachment I to TXX-06101
'Page 3 of 4
- 3. NRC Ouestion:
Where does the class boundary for the Auxiliary Feedwater system change from Class 2 to Class 3?
TXU Response to 3:
The ASME Code Class 2/3 breaks occur on the upstream side of the following valves associated with the following pumps, as indicated on CPSES flow diagram M2-0206, Auxiliary Feedwater System, and as listed below:
TDAFW Pump 2-HV-2491A (TDAFW Pump 2-01 discharge to SG 2-01 isolation valve) 2-HV-2492A (TDAFW pump 2-01 discharge to SG 2-02 isolation valve) 2-HV-2493B (TDAFW pump 2-01 discharge to SG 2-03 isolation valve) 2-HV-2494B (TDAFW pump 2-01 discharge to SG 2-04 isolation valve)
MDAFW Pump A 2-HV-2491B (MDAFW pump 2-01 discharge to SG 2-01 isolation valve) 2-HV-2492B (MDAFW pump 2-01 discharge to SG 2-02 isolation valve)
MDAFW Pump B 2-HV-2493A (MDAFW pump 2-02 discharge to SG 2-03 isolation valve) 2-HV-2494A (MDAFW pump 2-02 discharge to SG 2-04 isolation valve)
- 4. NRC Ouestion:
In the original relief request for application of an alternative to the ASME Boiler and Pressure Vessel Code Section XI examination requirements for class 1 and 2 piping welds, reference was made to the "recent event at the V.C. Summer facility in which through-wall cracking was discovered in a 34-inch main loop hot leg reactor pressure vessel nozzle." TXU Power stated that industry progress would be closely monitored and recommendations would be assessed for applicability.
- a. How has this event been considered in the update to the risk-informed inservice inspection (RI-ISI) program?
- b. Is Primary Water Stress Corrosion Cracking (PWSCC) now considered as a degradation mechanism for dissimilar metal welds?
- c. How will MRP-139 be addressed with respect to the RI-ISI Program?
Attachment 1 to TXX-06101
'Page
The event at V.C. Summer along with some other industry events led to the Materials Reliability Program developing MRP-139, which identified butt weld locations susceptible to primary water stress corrosion cracking (PWSCC) and developed approaches for inspection, re-inspection, mitigation, and flaw evaluation, and was issued on July 14, 2005. The issue and actions from MRP-139 are captured in the Corrective Action Program at CPSES in SMF-2005-003502. Since the interval for Unit 2 ended on August 2, 2004, the information per MRP-139 is not included in this Relief Request TXU Response to 4b:
During the evaluation/update process for RI-ISI which occurred for the end of the third period and coincided with the end of the first interval for Unit 2, CPSES Report ER-ME-107, Degradation Mechanism Evaluation of Class 1 & Class 2 Piping in Support of ASME Code Case N-578, was revised to remove assumption 7 which stated that " Bi-metallic welds with Inconel buttering are not considered susceptible to the PWSCC degradation mechanism."
This was removed based on the new criteria being addressed in the industry to address PWSCC in bi-metallic welds with Inconel buttering. PWSCC will be considered as a degradation mechanism for dissimilar welds, and as stated previously, will be addressed in the next RI-ISI evaluations/updates for Units I and 2, which are scheduled for 2007.
TXU Response to 4c:
As stated previously, MRP-139 issue and actions to be taken are captured in the Corrective Action Program under SMF-2005-003502 for CPSES Units I and 2. The RI-ISI will address these new degradation mechanisms to their previous RI- ISI rankings for the affected documents and will make the necessary changes to the plant specific documents, which for CPSES are ER-ME-107 and ER-EA-012, Consequence Evaluation of Class 1 & Class 2 Piping in Support of ASME Code Case N-578. These welds and examination requirements will then be captured in the either the ISI or AISI Program Plans.
- 5. NRC Question:
Note 6 of Table 1 states, "due to a change in ASME Section XI Code criteria, 4 (inch) NPS Class 2 auxiliary feedwater piping was added to the ISI Program, and therefore, the RI-ISI Program, for the first time during the third ISI interval." This relief request, dated December 15, 2005, states the alternative to the code requirements is to be used for the second interval of Unit 2. Please, explain this apparent discrepancy.
TXU Response to 5:
Note 6 of Table I should state that "4-inch AF piping was added to the ISI Program for Unit 2 for the first time during the second ISI interval." A typographical mistake was made.