ML22195A284 | 31 January 2023 | | | Draft Regulatory Guide DG 1406, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1 (RG 1.147 Rev 21) | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
Regulatory Guide 1.147 | 17 December 2021 | | | 0, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1 | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML20120A631 | 31 January 2021 | | | Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 20, (DG-1367) | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML19156A178 | 31 March 2020 | | | Rulemaking: Final Rule: Regulatory Analysis for the American Society of Mechanical Engineers Code Cases | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Through Wall Leak Through-Wall Leakage Dissimilar Metal Weld Backfit |
JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan | 17 December 2018 | FitzPatrick | Constellation | Fifth Ten-Year Lnservice Inspection Interval Program Plan | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Moisture barrier License Renewal EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Manual Operator Action Thermal fatigue |
ML18099A054 | 31 August 2018 | | | Rulemaking: Proposed Rule: Egulatory Analysis for American Society of Mechanical Engineers Code Cases, Rg 1.84, Rev 38; Rg 1.147, Rev 19; Rg 1.192, Rev 3; and Rg 1.193, Rev 6 | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld Backfit |
ML18099A051 | 26 July 2018 | | | FRN: Proposed Rule: American Society of Mechanical Engineers Code Cases, Rg 1.84, Rev 38; Rg 1.147, Rev 19; Rg 1.192, Rev 3; and Rg 1.193, Rev 6 | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Through Wall Leak Through-Wall Leakage Dissimilar Metal Weld Backfit |
ML17312B080 | 25 January 2018 | | | OMB-3150-0011 Final 2018 Collection Renewal, 10 CFR Part 50 Supporting Statement, Section 5 - Issuance, Limitations, and Conditions of Licenses and Construction Permits | Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference |
IR 05000219/2017004 | 24 January 2018 | Oyster Creek | Holtec | NRC Integrated Inspection Report 05000219/2017004 | High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination |
ML17314A008 | 10 November 2017 | LaSalle | Constellation | Submittal of Program Plan Associated with the Fourth Lnservice Inspection (ISI) Interval and the Third Containment Lnservice Inspection (Cisi) Interval | Non-Destructive Examination Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Integrated leak rate test License Renewal Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld Thermal fatigue |
IR 05000317/2017002 | 2 August 2017 | Calvert Cliffs | Constellation | Integrated Inspection Report 05000317/2017002 and 05000318/2017002 | Boric Acid High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Internal Flooding Nondestructive Examination Functionality Assessment Condition Adverse to Quality Process Control Program Operability Determination Operability Assessment |
IR 05000334/2016003 | 8 November 2016 | Beaver Valley | Vistra | Integrated Inspection Report 05000334/2016003 and 05000412/2016003 | Offsite Dose Calculation Manual Fire Barrier Commercial Grade Dedication Internal Flooding Probabilistic Risk Assessment VT-2 Functionality Assessment Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination Maintenance Rule Program Pressure Boundary Leakage |
ML16300A036 | 26 October 2016 | Byron | Constellation | Fourth Ten-Year Interval Inservice Inspection Program | Safe Shutdown Boric Acid Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Moisture barrier License Renewal Earthquake Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld Thermography Thermal fatigue |
ML15027A202 | 2 March 2016 | | | Draft Regulatory Guide DG-1296, Proposed Rev. 18 of Rg 1.147 | Stroke time Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Flow Accelerated Corrosion Commercial Grade Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Backfit |
ML15224B359 | 4 August 2015 | Limerick | Constellation | Inservice Inspections Summary Report for the Period April 19, 2013, Through May 7, 2015 | Commercial Grade Dedication Hydrostatic Coatings VT-2 FLEX EVT-1 |
ML15222A251 | 28 July 2015 | Wolf Creek | Wolf Creek Nuclear Operating Corporation | Inservice Inspection Program Third Interval, Third Period, Refueling Outage 20 Owner'S Activity Report | Hydrostatic Through-Wall Leak |
RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | 29 October 2014 | Peach Bottom Quad Cities | Constellation Constellation | Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure | Functionality Assessment Through-Wall Leak |
ML14066A069 | 3 March 2014 | Oconee | Duke Energy | End of Cycle 26 Refueling Outage, Inservice Inspection Summary Report; Fourth Ten Year Inspection Interval | Boric Acid Weld Overlay Hydrostatic Anchor Darling VT-2 EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Thermal fatigue |
IR 05000313/2013005 | 4 February 2014 | Arkansas Nuclear | Entergy | IR 05000313-13-005, 05000368-13-005, on 10/01/2013 - 12/31/2013, Arkansas Nuclear One, Units 1 and 2, Integrated Inspection Report, Fire Protection and Operability Determinations and Functionality Assessments | Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program |
IR 05000334/2013003 | 30 July 2013 | Beaver Valley | | IR 5000334-2013003 and 5000412-2013003, 04-01-2013 - 06-30-2013, Beaver Valley Power Station - NRC Integrated Inspection Report | Boric Acid Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Water Inventory Control Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Through-Wall Leak Through-Wall Leakage Grace period Operability Assessment |
IR 05000334/2012004 | 7 November 2012 | Beaver Valley | | IR 05000334-12-004, 05000412-12-004; 07/1/12 9/30/2012; Beaver Valley Power Station Units 1 & 2; Heat Sink Performance and Licensed Operator Requalification Program | High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Probabilistic Risk Assessment Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Fukushima Dai-Ichi Significance Determination Process Job Performance Measure Process Control Program Operability Determination Through-Wall Leakage Scaffolding Siren |
ML12306A291 | 1 November 2012 | Arkansas Nuclear | Entergy | Transmittal Email and WCAP-17128-NP, Revision 1, Flaw Evaluation of CE Design RCP Suction and Discharge Nozzle Dissimilar Metal Welds, Phase III Study, May 2010 | Safe Shutdown Boric Acid Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake VT-2 Finite Element Analysis Stress corrosion cracking Dissimilar Metal Weld DM weld Unidentified leakage |
ML12297A333 | 18 October 2012 | Millstone | Dominion | Relief Request RR-04-13 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange | Safe Shutdown Time of Discovery Mission time Post Accident Monitoring Coatings Nondestructive Examination Temporary Modification Pressure boundary leak Through-Wall Leak Through Wall Leak Fire Protection Program |
PNP 2012-069, ASME Section XI 90-Day Inservice Inspection Summary Report | 3 August 2012 | Palisades | Entergy | ASME Section XI 90-Day Inservice Inspection Summary Report | |
IR 05000327/2012002 | 30 April 2012 | Sequoyah | Tennessee Valley Authority | IR 05000327-12-002, 05000328-12-002, on 1/1/2012 - 3/31/2012 Sequoyah Nuclear Plant, Units 1 & 2, Adverse Weather Protection, Fire Protection, Flood Protection Measures, Evaluation of Changes, Tests, or Experiments, & Permanent Plant Modifi | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Operator Manual Action Significance Determination Process Foreign Material Exclusion Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Unidentified leakage |
IR 05000285/2011006 | 16 March 2012 | Fort Calhoun | Omaha Public Power District | IR 05000285-11-006; Omaha Public Power District; on November 14, 2011, ?February 2, 2012; Fort Calhoun Station Biennial Team Inspection of the Identification and Resolution of Problems. | Safe Shutdown Boric Acid Coatings Temporary Modification Condition Adverse to Quality Aging Management Significance Determination Process Job Performance Measure Foreign Material Exclusion Operability Determination License Renewal Scaffolding Operability Assessment |
IR 05000247/2011004 | 10 November 2011 | Indian Point | Entergy | IR 05000247-11-004; 7/1/2011- 9/30/2011; Indian Point Nuclear Generating (Indian Point) Unit 2; Follow Up of Events | Safe Shutdown Fire Barrier Enforcement Discretion Functionality Assessment Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report Earthquake Through-Wall Leak |
ML11311A222 | 7 November 2011 | Indian Point | Entergy | IR 05000286-11-004; 7/1/11 - 9/30/11; Indian Point Nuclear Generating (Indian Point) Unit 3; Resident Integrated Inspection Report | Safe Shutdown High winds Fire Barrier Commercial Grade Dedication Enforcement Discretion Functionality Assessment Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Earthquake Maintenance Rule Program Through Wall Leak Downpower |
ML11263A148 | 13 September 2011 | Wolf Creek | | Inservice Inspection Program Third Interval, Second Period, Refueling Outage 18 Owner'S Activity Report | Weld Overlay Through Wall Leak |
ML11234A077 | 19 August 2011 | Millstone | | Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange | Mission time Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Through-Wall Leak Through Wall Leak |
ML111730475 | 20 July 2011 | Three Mile Island | Constellation | Fourth Inservice Inspection Interval Relief Requests I4R-02, I 4R-03, I4R-04, I4R-05, and I4R-06 | High winds Weld Overlay Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Large early release frequency Exemption Request Dissimilar Metal Weld |
ML11139A273 | 17 May 2011 | San Onofre | Southern California Edison | Owner'S Report of Inservice Inspection, Form NIS-1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Pressure boundary leak Through-Wall Leak |
ML110830895 | 22 April 2011 | Turkey Point | NextEra Energy | Safety Evaluation for Relief Request No. 8 Regarding Repair of Spent Fuel Pool Transfer Canal Drain Piping | Boric Acid Time of Discovery Incorporated by reference Through-Wall Leak |
L-11-083, Submittal of Inservice Examination Plan | 28 March 2011 | Perry | FirstEnergy | Submittal of Inservice Examination Plan | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Integrated leak rate test Moisture barrier Earthquake EVT-1 Liquid penetrant Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Scaffolding Grace period Thermal fatigue |
ML110760485 | 16 March 2011 | San Onofre | | Third Ten-Year Inservice Interval Relief Request ISI-3-31, Flaw Evaluation of High-Energy Schedule 10s Emergency Core Cooling System Piping | Time of Discovery High Radiation Area Mission time Through-Wall Leak |
TMI-11-061, ISI Program Plan, Fourth Ten-Year Inspection Interval | 15 March 2011 | Three Mile Island | | ISI Program Plan, Fourth Ten-Year Inspection Interval | Boric Acid Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Flow Accelerated Corrosion Stress corrosion cracking Moisture barrier License Renewal Control of Heavy Loads EVT-1 Liquid penetrant Dissimilar Metal Weld Power change Thermography Thermal fatigue |
IR 05000482/2010005 | 11 February 2011 | Wolf Creek | | IR 05000482-10-005; Wolf Creek Nuclear Operating Corporation; 10/01/2010 - 12/31/2010; Wolf Creek Generating Station, NRC Integrated Inspection Report | Unanalyzed Condition Boric Acid Fitness for Duty Ultimate heat sink Offsite Dose Calculation Manual Water Inventory Control Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Job Performance Measure Process Control Program Operability Determination Earthquake Through-Wall Leak Fire Protection Program Operability Assessment Unidentified leak |
IR 05000271/2010005 | 8 February 2011 | Vermont Yankee | Entergy | IR 05000271-10-005, on 10/01/2010-12/31/2010, Vermont Yankee Nuclear Power Station, Identification and Resolution of Problems | Safe Shutdown High Radiation Area Fire Barrier Nondestructive Examination Locked High Radiation Area Significance Determination Process Process Control Program Operability Determination Fire Protection Program Downpower Operability Assessment |
L-2010-243, Response to Request for Additional Information Relief Request No. 8, Transfer Canal Drain Line Piping Repair | 4 February 2011 | Turkey Point | | Response to Request for Additional Information Relief Request No. 8, Transfer Canal Drain Line Piping Repair | Boric Acid Pressure boundary leak |
IR 05000250/2010005 | 27 January 2011 | Turkey Point | | | Hot Short Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Stroke time Time to boil Enforcement Discretion Probabilistic Risk Assessment Fire impairment Nondestructive Examination VT-2 Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination Liquid penetrant Through Wall Leak Fire Protection Program Scaffolding Unidentified leakage |
ML110280004 | 27 January 2011 | Turkey Point | | Integrated Inspection Report 2010-005 | Hot Short Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Enforcement Discretion Probabilistic Risk Assessment Fire impairment Nondestructive Examination VT-2 Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Liquid penetrant Through Wall Leak Fire Protection Program Scaffolding |
ML11024A045 | 24 January 2011 | Limerick | | IR 05000352-10-005; 05000353-10-005; 10/01/2010-12/31/2010; Limerick Generating Station, Units 1 and 2; Routine Integrated Report | High Radiation Area Fire Barrier Stroke time Internal Flooding Locked High Radiation Area Significance Determination Process Job Performance Measure Scram Discharge Volume Operability Determination Siren |
ML110050494 | 14 January 2011 | Hatch | Southern Nuclear | Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253 | Nondestructive Examination VT-2 Functionality Assessment Liquid penetrant Through-Wall Leak |
ML103550488 | 20 December 2010 | San Onofre | | Response to Request for Additional Information Regarding Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-31, Flaw Evaluation of High-Energy Schedule 10s Emergency Core Cooling System Piping | Non-Destructive Examination Nondestructive Examination Through-Wall Leak |
RS-10-204, Withdrawal of Request for NRC Approval to Use ASME Code Case N-513-2 | 24 November 2010 | Clinton | Constellation | Withdrawal of Request for NRC Approval to Use ASME Code Case N-513-2 | |
ML103230380 | 22 November 2010 | Millstone | | Withdrawal of Relief Request IR-3-12 Regarding the Use of American Society of Mechanical Engineering Code Case N-513-2 | |
ML103230045 | 18 November 2010 | Millstone | | Withdrawal of Relief Request RR-04-03 for the Use of ASME Code Case N-513-2 | VT-2 |
ML103230004 | 18 November 2010 | Millstone | | Withdrawal of Alternative Request IR-3-12 for the Use of ASME Code Case N-513-2 | |
IR 05000277/2010004 | 10 November 2010 | Peach Bottom | Constellation | IR 05000277-10-004 and 05000278-10-004, on 07-01-10 - 09-30-10, Peach Bottom Atomic Power Station - NRC Integrated Inspection Report | High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Stroke time Water Inventory Control Enforcement Discretion Temporary Modification Functionality Assessment Test box Significance Determination Process Job Performance Measure Operability Determination Annual Radiological Effluent Release Report Scaffolding Coast down Siren |
ML103120058 | 10 November 2010 | Three Mile Island | | Completion of NRC Activities Related to Relief Request I4R-01 Concerning the Expanded Applicability for Use of ASME Code Case N-513-2 | |