ML11024A045

From kanterella
Jump to navigation Jump to search
IR 05000352-10-005; 05000353-10-005; 10/01/2010-12/31/2010; Limerick Generating Station, Units 1 and 2; Routine Integrated Report
ML11024A045
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/24/2011
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Generation Co
Krohn P
References
IR-10-005
Download: ML11024A045 (32)


See also: IR 05000352/2010005

Text

January 24, 2011

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION - NRC INTEGRATED

INSPECTION REPORT 05000352/2010005 AND 05000353/2010005

Dear Mr. Pacilio:

On December 31, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Limerick Generating Station Units 1 and 2. The enclosed integrated

inspection report documents the inspection results which were discussed on January 7, 2011,

with Mr. W. Maguire and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel based on the results of the inspection, no findings were identified.

In accordance with 10 Code of Federal Regulations (CFR) Part 2.390 of the NRC's "Rules of

Practice," a copy of this letter, its enclosure, and your response (if any) will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is

accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Paul G. Krohn, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos: 50-352, 50-353

License Nos: NPF-39, NPF-85

Enclosure:

Inspection Report 05000352/2010005 and 05000353/2010005

w/Attachment: Supplemental Information

cc w/encl:

Distribution via ListServ

M. Pacilio

2

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION - NRC INTEGRATED

INSPECTION REPORT 05000352/2010005 AND 05000353/2010005

Dear Mr. Pacilio:

On December 31, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Limerick Generating Station Units 1 and 2. The enclosed integrated

inspection report documents the inspection results which were discussed on January 7, 2011,

with Mr. W. Maguire and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel based on the results of the inspection, no findings were identified.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of the

NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Paul G. Krohn, Chief

Projects Branch 4

Division of Reactor Projects

Distribution w/encl:(via e-mail)

W. Dean, RA

D. Lew, DRA

J. Clifford, DRP

G. Dentel, DRP

D. Roberts, DRS

P. Wilson, DRS

P. Krohn, DRP

A. Rosebrook, DRP

E. Torres, DRP

S. Ibarrola, DRP

E. DiPaolo, DRP, SRI

N. Sieller, DRP, RI

N. Esch, DRP, AA

J. Trapp, RI, OEDO

RidsNrrPMLimerick Resource

RidsNrrDorlLpl1-2Resource

ROPreportsResource@nrc.gov

SUNSI Review Complete: _PGK___ (Reviewers Initials)

DOC NAME: G:\\DRP\\BRANCH4\\INSPECTION REPORTS\\LIMERICK\\2010\\LIM 2010 4TH QTR\\

LIM 2010-005 REV 1.DOCX

After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in box"C" = Copy w/out attachment/enclosure "E" = Copy w/attachment/enclosure "N" = No copy

OFFICE mmt

RI/DRP

RI/DRP

RI/DRP

NAME

EDiPaolo/PGK for

ARosebrook/AAR

PKrohn/PGK

DATE

01/ 24 /11

01/ 24 /11

01/ 24 /11

OFFICIAL RECORD COPY

1

Enclosure

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Docket Nos:

50-352, 50-353

License Nos:

NPF-39, NPF-85

Report No:

05000352/2010005 and 05000353/2010005

Licensee:

Exelon Generation Company, LLC

Facility:

Limerick Generating Station, Units 1 & 2

Location:

Sanatoga, PA 19464

Dates:

October 1, 2010 through December 31, 2010

Inspectors:

E. DiPaolo, Senior Resident Inspector

N. Sieller, Resident Inspector

J. Hawkins, Acting Resident Inspector

A. Rosebrook, Senior Project Engineer

T. Moslak, Health Physicist

J.Caruso, Senior Operations Engineer (Section 1R11.2)

J. DAntonio, Senior Operations Engineer (Section 1R11.2)

J. Tomlinson, Operations Engineer (Section 1R11.2)

C. Crisden, Emergency Preparedness Specialist

Approved by:

Paul G. Krohn, Chief

Projects Branch 4

Division of Reactor Projects

2

Enclosure

TABLE OF CONTENTS

SUMMARY OF FINDINGS ......................................................................................................... 3

REPORT DETAILS ..................................................................................................................... 4

1.

REACTOR SAFETY ............................................................................................................ 4

1R01 System Seasonal Adverse Weather Protection ...................................................... 4

1R04

Equipment Alignment ............................................................................................. 5

1R05

Fire Protection ........................................................................................................ 5

1R06

Flood Protection Measures .................................................................................... 6

1R11

Licensed Operator Requalification Program ........................................................... 6

1R12 Maintenance Effectiveness ................................................................................... 8

1R13

Maintenance Risk Assessments and Emergent Work Control ............................... 8

1R15

Operability Evaluations .......................................................................................... 9

1R19

Post-Maintenance Testing ..................................................................................... 9

1R22

Surveillance Testing ............................................................................................ 10

1EP2

Alert and Notification System (ANS) Evaluation ................................................... 11

1EP3

Emergency Response Organization (ERO) Staffing and Augmentation System 11

1EP4

Emergency Action Level (EAL) and Emergency Plan Changes ........................... 11

1EP5

Correction of Emergency Preparedness Weaknesses ......................................... 12

2.

RADIATION SAFETY ........................................................................................................ 12

2RS01 Radiological Hazard Assessment and Exposure Controls .................................... 12

4.

OTHER ACTIVITIES ......................................................................................................... 13

4OA1

Performance Indicator (PI) Verification ................................................................. 13

4OA2

Identification and Resolution of Problems ............................................................. 15

4OA3

Event Follow-up ................................................................................................... 17

4OA5

Other Activities ..................................................................................................... 18

4OA6

Meetings, Including Exit ........................................................................................ 19

ATTACHMENT: SUPPLEMENTAL INFORMATION ................................................................ 19

SUPPLEMENTAL INFORMATION ......................................................................................... A-1

KEY POINTS OF CONTACT .................................................................................................. A-1

LIST OF ITEMS OPENED OR CLOSED ................................................................................ A-2

LIST OF DOCUMENTS REVIEWED ...................................................................................... A-2

LIST OF ACRONYMS .......................................................................................................... A-10

3

Enclosure

SUMMARY OF FINDINGS

IR 05000352/2010005; 05000353/2010005; 10/01/2010-12/31/2010; Limerick Generating

Station, Units 1 and 2; routine integrated report.

The report covered a three-month period of inspection by resident inspectors, a senior project

engineer, a health physicist, an emergency preparedness specialist, and an announced

inspection by operations engineers. The NRCs program for overseeing the safe operation of

commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight,"

Revision 4, dated December 2006.

No findings were identified.

4

Enclosure

REPORT DETAILS

Summary of Plant Status

Unit 1 began the inspection period operating at full rated thermal power (RTP). On

December 4, operators reduced power to approximately 94 percent to facilitate main turbine

valve testing, control rod scram time testing, a control rod pattern adjustment, and to perform

secondary plant maintenance. Power was restored to full RTP on December 5. Unit 1

remained at full RTP for the remainder of the inspection period.

Unit 2 began the inspection period operating at full RTP. On October 23, power was reduced

(unplanned) to approximately 50 percent as a result of the trip of the A recirculation pump

motor-generator set. Following troubleshooting and repairs to the generator voltage regulator,

power was further reduced on October 24 to approximately 33 percent to facilitate the restart of

the A recirculation pump. Power was restored to full RTP on October 25. On October 30,

operators reduced power to 85 percent to facilitate a follow up control rod pattern adjustment.

Power was restored to full RTP on October 31. A power reduction to 85 percent was performed

on November 20 to facilitate a control rod pattern adjustment. Full power was restored on

November 21. On December 3, power was reduced (unplanned) to approximately 58 percent

as a result of the trip of the A recirculation pump motor-generator set. Operators reduced

power to approximately 35 percent to facilitate the restart of the A recirculation pump following

troubleshooting and repairs to the recirculation pump motor-generator set generator voltage

regulator. Full RTP was restored on December 6. On December 18, operators reduced power

to approximately 80 percent to facilitate main turbine valve testing, fuel channel distortion

testing, and a control rod pattern adjustment. The unit was restored to full RTP on

December 19. Unit 2 remained at full RTP for the remainder of the inspection period.

1.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems and Barrier Integrity

1R01 System Seasonal Adverse Weather Protection (71111.01 - 1 seasonal sample)

a. Inspection Scope

The inspectors assessed the effectiveness of the licensees cold weather protection

program as it related to ensuring that equipment in the facilitys spray pond pump house

would remain functional and available in cold weather conditions. This equipment

includes the emergency service water (ESW) pumps, residual heat removal (RHR)

service water pumps, motor-operated valves associated with the spray pond, and

support electrical equipment. In addition to reviewing the licensees program-related

documents and procedures, walkdowns were conducted of the freeze protection

equipment (e.g., ventilation system dampers, building heating system, etc.) associated

with the above systems/components. The inspectors observed plant conditions and

evaluated those conditions against criteria documented in procedure GP-7, Cold

Weather Preparation and Operation. Licensee problem identification and resolution

associated with cold weather protection was also assessed. Documents reviewed are

listed in the Attachment.

5

Enclosure

b. Findings

No findings were identified.

1R04 Equipment Alignment

Partial Walkdown (71111.04Q - 3 samples)

a. Inspection Scope

The inspectors performed partial walkdowns of the plant systems listed below to verify

operability following realignment after a system outage window or while safety-related

equipment in the opposite train was inoperable, undergoing surveillance testing (ST), or

potentially degraded. The inspectors used Technical Specifications (TS), Exelon

operating procedures, plant piping and instrumentation diagrams (P&ID), and the

Updated Final Safety Analysis Report (UFSAR) as guidance for conducting partial

system walkdowns. The inspectors reviewed the alignment of system valves and

electrical breakers to ensure proper in-service or standby configurations as described in

plant procedures and drawings. During the walkdowns, the inspectors evaluated the

material condition and general housekeeping of the systems and adjacent spaces. The

documents reviewed are listed in the Attachment. The inspectors performed walkdowns

of the following areas:

Emergency diesel generator (EDG) D23 on October 21, 2010;

A control room emergency fresh air supply system following return-to-service on

November 3, 2010; and

Unit 2 high pressure coolant injection (HPCI) system when the B loop of emergency

service water was out-of-service (OOS) on December 2, 2010.

b. Findings

No findings were identified.

1R05 Fire Protection

Fire Protection - Tours (71111.05Q - 4 samples)

a. Inspection Scope

The inspectors conducted a tour of the four areas listed below to assess the material

condition and operational status of fire protection features. The inspectors verified that

combustible materials and ignition sources were controlled in accordance with Exelons

procedures. Fire detection and suppression equipment was verified to be available for

use, and passive fire barriers were verified to be maintained in good material condition.

The inspectors also verified that station personnel implemented compensatory measures

for OOS, degraded, or inoperable fire protection equipment in accordance with the

stations fire plan. The documents reviewed are listed in the Attachment. The

inspectors toured the following areas:

Spray Pond Pumphouse, Western Half (Fire Area 122);

Spray Pond Pumphouse, Eastern Half (Fire Area 123);

6

Enclosure

Control Room and Peripheral Rooms (Fire Area 24); and

Remote Shutdown Room (Fire Area 26).

b. Findings

No findings were identified.

1R06 Flood Protection Measures (71111.06 - 1 internal flooding sample)

a. Inspection Scope

The inspectors reviewed the UFSAR and related flood analysis documents to identify

areas that can be affected by internal flooding, to identify features designed to alert

operators of a flooding event, and to identify features designed for coping with internal

flooding. The inspectors performed a walkdown of the Main Control Room Chiller

Rooms (Reactor Enclosure, Elevation 200) and adjacent areas. The inspectors

observed flood protection features to assess their ability to minimize the impact of a

flooding event. The inspectors performed a review of operator actions contained in

off-normal procedures for flooding to verify that the actions can reasonably be used to

achieve the desired outcome. The documents reviewed are listed in the Attachment.

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program

.1

Resident Inspector Quarterly Review (71111.11Q - 1 sample)

a. Inspection Scope

On November 9, 2010, the inspectors observed two annual licensed operator simulator

examinations (LSES-2004). The simulator scenarios tested the operators ability to

respond to operating equipment failures, reactivity transients, loss of drywell cooling, and

loss of coolant leaks in the drywell. The inspectors observed licensed operator

performance including operator critical tasks, which are required to ensure the safe

operation of the reactor and protection of the nuclear fuel and primary containment

barriers. The inspectors also assessed crew dynamics and supervisory oversight to

verify the ability of operators to properly identify and implement appropriate TS actions,

regulatory reports, emergency event declarations, and notifications. The inspectors

observed training instructor critiques and assessed whether appropriate feedback was

provided to the licensed operators. The documents reviewed are listed in the

Attachment.

b. Findings

No findings were identified.

.2

Biennial Requalification Program Review (71111.11B - 1 sample)

a. Inspection Scope

7

Enclosure

The following inspection activities were performed using NUREG 1021, Revision 9,

Supplement 1, Operator Licensing Examination Standards for Power Reactors,

Inspection Procedure Attachment 7111111, Licensed Operator Requalification

Program, Appendix A, Checklist for Evaluating Facility Testing Material, and

Appendix B, Suggested Interview Topics.

A review was conducted of recent operating history documentation found in inspection

reports, licensee event reports, the licensees corrective action program, and the most

recent, NRC plant issues matrix. The inspectors also reviewed specific events from the

licensees corrective action program which indicated possible training deficiencies to

verify that they had been appropriately addressed. The senior resident inspector was

also consulted for insights regarding licensed operators performance. These reviews did

not detect any operational events that were indicative of possible training deficiencies.

For the 2010 examination cycle, the biennial written examinations (i.e., administered in

2009) and annual operating tests administered for weeks three, four, and five were

reviewed for content, quality, and excessive overlap to ensure that these exams met the

criteria established in the Examination Standards and 10 CFR 55.59.

On December 10, 2010, the results of the annual operating tests for 2010 were reviewed

to determine if pass/fail rates were consistent with the guidance of NUREG-1021,

Revision 9, Supplement 1, Operator Licensing Examination Standards for Power

Reactors, and NRC Manual Chapter 0609, Appendix I, Operator Requalification

Human Performance Significance Determination Process, were also performed. The

review verified the following:

Crew pass rates were greater than 80 percent (Pass rate was 100 percent);

Individual pass rates on the written examination were greater than 80 percent (N/A -

Biennial written examination was not administered this year);

Individual pass rates on the job performance measures of the operating exam were

greater than 80 percent (Pass rate was 98 percent); and

More than 75 percent of the individuals passed all portions of the operating

examination (Pass rate was 98 percent).

Observations were made of the dynamic simulator examinations and job performance

measures (JPMs) administered during the week of November 15, 2010, for Operations

and Staff Crew C. These observations included facility evaluations of crew and

individual performance during the dynamic simulator examinations and individual

performance of JPMs.

The remediation plans for 22 out-of-the-box scenarios were reviewed to assess the

effectiveness of the remedial training. Two reactivations were reviewed to ensure that

10 CFR 55.53 license conditions and applicable program requirements were met.

Instructors and training/operation=s management were interviewed for feedback on their

training program.

A sample of ten operator medical examinations were also reviewed for compliance with

license conditions, including NRC regulations.

8

Enclosure

Simulator performance and fidelity were reviewed for conformance to the reference plant

control room. Selected simulator deficiency reports were reviewed to assess licensee

prioritization and timeliness of resolution. Simulator testing records were reviewed to

verify that scheduled tests were performed.

b. Findings

No findings were identified.

1R12 Maintenance Effectiveness (71111.12Q - 1 sample)

a. Inspection Scope

The inspectors evaluated Exelons work practices and follow-up corrective actions for

one issue within the scope of the maintenance rule. The inspectors reviewed the

performance history of these structures, systems, and components (SSCs) and

assessed the effectiveness of Exelons corrective actions, including any extent-of-

condition determinations to address potential common cause or generic implications.

The inspectors assessed Exelons problem identification and resolution actions for these

issues to evaluate whether Exelon had appropriately monitored, evaluated, and

dispositioned the issues in accordance with Exelon procedures and the requirements of

10 CFR Part 50.65, Requirements for Monitoring the Effectiveness of Maintenance. In

addition, the inspectors reviewed the maintenance rule classifications, performance

criteria, and goals for these SSCs and evaluated whether they appeared reasonable and

appropriate. The documents reviewed are listed in the Attachment. The inspectors

reviewed the following issue:

Issue Report (IR) 1137553 ESW pinhole leak repair - ESW loop B return piping

from Unit 2 RHR pump compartment unit cooler.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control (71111.13 - 6 samples)

a. Inspection Scope

The inspectors evaluated the effectiveness of Exelons maintenance risk assessments

required by 10 CFR Part 50.65(a)(4). This inspection included discussion with control

room operators and risk analysis personnel regarding the use of Exelons on-line risk

monitoring software. The inspectors reviewed equipment tracking documentation, daily

work schedules, and performed plant tours to gain assurance that the actual plant

configuration matched the assessed configuration. Additionally, the inspectors verified

that Exelons risk management actions, for both planned and emergent work, were

consistent with those described in Exelon procedure, ER-AA-600-1042, On-Line Risk

Management. The documents reviewed are listed in the Attachment. The inspectors

reviewed the following samples:

Units 1 and 2 on-line risk profile during the EDG D12 load reject test with the 20

offsite power source unavailable on October 6, 2010;

9

Enclosure

Unit 2 on-line risk profile while in single recirculation loop operations following A

motor generator (MG) trip October 22 - October 24, 2010;

Unit 1 on-line risk and compensatory measures during fire header partial outage

November 5 - November 8, 2010;

Units 1 and 2 on-line risk profile when the B control enclosure chiller was

discovered to be unavailable due to insufficient ESW flow on November 13, 2010;

Units 1 and 2 on-line risk profile when the 222 Plant Services bus was de-energized

November 24 - 25 due to a supply feeder cable fault; and

Unit 2 risk profile while in single recirculation loop operations following A MG trip

December 3, 2010 - December 5, 2010.

b. Findings

No findings were identified.

1R15 Operability Evaluations (71111.15 - 7 samples)

a. Inspection Scope

The inspectors assessed the technical adequacy of a sample of seven operability

evaluations to ensure that Exelon properly justified TS operability and verified that the

subject component or system remained available such that no unrecognized increase in

risk occurred. The inspectors reviewed the UFSAR to verify that the system or

component remained available to perform its intended safety function. In addition, the

inspectors reviewed compensatory measures implemented to ensure that the measures

worked and were adequately controlled. The inspectors also reviewed a sample of IRs

to verify that Exelon identified and corrected deficiencies associated with operability

evaluations. The documents reviewed are listed in the Attachment. The inspectors

reviewed the following evaluations:

IR 1120701, Radiation monitor failed check source functional test;

IR 1132289, Degraded wire connection on Unit 1 drywell floor drain sump level

monitor;

IR 1137553, ESW pinhole leak on B loop return piping from Unit 2 RHR pump

compartment unit cooler (OPE-10-008, Revision 08);

IR 1143600, ESW B loop flow balance issues;

IR 1143434, Unit 1 scram discharge volume (SDV) valve exceeded maximum

allowed stroke time;

IR 1151354, Unit 1 HPCI turbine mechanical overspeed will not reset; and

IR 1153065, EDG D14 fuel oil supply pressure fluxuations during operations.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing (71111.19 - 8 samples)

a. Inspection Scope

10

Enclosure

The inspectors reviewed eight post-maintenance tests to verify that procedures and test

activities ensured system operability and functional capability. The inspectors reviewed

Exelons test procedures to verify that the procedures adequately tested the safety

functions that may have been affected by the maintenance activity, and that the

acceptance criteria in the procedures were consistent with information in the licensing

and design basis documents. The inspectors also witnessed the test or reviewed test

data to verify that the results adequately demonstrated restoration of the affected safety

functions. The documents reviewed are listed in the Attachment. The inspectors

reviewed the following samples:

R1152057, Repair Unit 1 Division IV steam leak detection;

C0235528, Unit 2 A MG set voltage regulator dynamic testing after card

replacements;

C0235261, Troubleshoot and rework Technical Support Center emergency

ventilation system outside air damper;

C0231042, ESW B loop flow balance;

C0236019, Unit 2 A recirculation pump MG repair;

A1786977, Loss of power to Unit 2 outboard main steam isolation valve logic;

C0235392, Replace Unit 2 Division III emergency core cooling system inverter; and

C0236065, Adjust pressure regulator to Unit 1 SDV piping vent primary containment

isolation valve (XV-047-1F011).

b. Findings

No findings were identified.

1R22 Surveillance Testing (71111.22 - 7 samples; 5 routine surveillances, 1 in-service testing

(IST) and 1 reactor coolant system leakage)

a. Inspection Scope

The inspectors either witnessed the performance of, or reviewed test data, for seven

STs associated with risk-significant SSCs. The reviews verified that Exelon personnel

followed TS requirements and that acceptance criteria were appropriate. The inspectors

also verified that the station established proper test conditions, as specified in the

procedures, that no equipment preconditioning activities occurred, and that acceptance

criteria were met. The documents reviewed are listed in the Attachment. The inspectors

reviewed the following samples:

ST-6-052-760, Safeguard Piping Fill Quarterly Valve Test;

ST-6-060-460-1, Primary Containment Isolation Capability Check;

ST-6-092-323-1, D13 DG Loss of Coolant Accident Load Reject Testing and Fast

Start Operability Test Run;

ST-6-082-365-0, Inoperable Unit 1 Safeguard Power Supply Actions for Both Units;

ST-6-049-230-1, Reactor Core Isolation Cooling Pump, Valve & Flow IST;

ST-6-047-200-1, SDV Exercise Test; and

ST-6-107-596-2, Drywell Floor Drain Sump/ Equipment Drain Tank Surveillance Log/

OPCON 1, 2, 3 (reactor coolant system leakage).

11

Enclosure

b. Findings

No findings were identified.

Cornerstone: Emergency Preparedness (EP)

1EP2 Alert and Notification System (ANS) Evaluation (71114.02 - 1 sample)

a. Inspection Scope

An onsite review was conducted to assess the maintenance and testing of the current

Limerick ANS. The inspectors reviewed ANS procedures and the updated Limerick ANS

design report to ensure Exelons compliance with design report commitments for system

maintenance and testing. A sample of IRs pertaining to the ANS was reviewed for

causes, trends, and corrective actions. The inspectors observed the conduct of the

Limerick monthly siren test. During the inspection, the inspectors also interviewed the

Mid-Atlantic EP Manager in regards to the new ANS which is planned for approval in

April 2011. The inspection was conducted in accordance with NRC Inspection

Procedure 71114, Attachment 2. Planning Standard, 10 CFR 50.47(b)(5) and the

related requirements of 10 CFR 50, Appendix E, were used as reference criteria.

b. Findings

No findings were identified.

1EP3 Emergency Response Organization (ERO) Staffing and Augmentation System

(71114.03 - 1 sample)

a. Inspection Scope

The inspectors conducted a review of Limericks ERO augmentation staffing

requirements and the process for notifying and augmenting the ERO was conducted.

This was performed to ensure the readiness of key licensee staff to respond to an

emergency event and to ensure Exelons ability to activate their emergency facilities in a

timely manner. The inspectors reviewed the Limerick and corporate ERO rosters,

station and corporate augmentation reports since March 2009, and CRs related to the

ERO staffing augmentation system. The inspectors also reviewed a sampling of ERO

responders training records to ensure training and qualifications were up to date. The

inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 3. Planning Standard, 10 CFR 50.47(b)(2) and related requirements of

10 CFR 50, Appendix E, were used as reference criteria.

b. Findings

No findings were identified.

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes (71114.04 - 1 sample)

a. Inspection Scope

12

Enclosure

Since the last NRC inspection of this program area, Exelon implemented various

changes to their Emergency Plan and implementing procedures. Exelon had

determined that, in accordance with 10 CFR 50.54(q), any change made to the Plan,

and its lower-tier implementing procedures, had not resulted in any decrease in

effectiveness of the Plan, and that the revised Plan continued to meet the standards in

50.47(b) and the requirements of 10 CFR 50, Appendix E. The inspectors reviewed all

Emergency Action Level changes, including changes to the security EALs as endorsed

by NEI 99-02, Revision 5. A sample of emergency plan changes including the changes

to lower-tier emergency plan implementing procedures, were evaluated for any potential

decreases in effectiveness of the Emergency Plan. However, this review by the

inspectors was not documented in an NRC Safety Evaluation Report and does not

constitute formal NRC approval of the changes. Therefore, these changes remain

subject to future NRC inspection in their entirety. The inspection was conducted in

accordance with NRC Inspection Procedure 71114, Attachment 4. The requirements in

10 CFR 50.54(q) were used as reference criteria.

b. Findings

No findings were identified.

1EP5 Correction of Emergency Preparedness Weaknesses (71114.05 - 1 sample)

a. Inspection Scope

The inspectors reviewed a sampling of self-assessment procedures and reports to

assess Exelons ability to evaluate their EP performance and programs. The inspectors

reviewed a sampling of CRs from March 2009 through December 2010, initiated by

Exelon at Limerick from drills and audits. Additionally, the inspectors reviewed 10 CFR

50.54(t) audits from 2009 and 2010; and self-assessment reports. This inspection was

conducted in accordance with NRC Inspection Procedure 71114, Attachment 5,

Planning Standard, 10 CFR 50.47(b)(14), and the related requirements of 10 CFR 50,

Appendix E, were used as reference criteria.

b. Findings

No findings were identified.

2.

RADIATION SAFETY

Cornerstones: Occupational and Public Radiation Safety

2RS01 Radiological Hazard Assessment and Exposure Controls (71124.01 - 1 sample)

a. Inspection Scope

During the period December 13 - 17, 2010, the inspectors conducted the following

activities to verify that the licensee was evaluating, monitoring, and controlling

radiological hazards for work performed in locked high radiation areas, including the

Independent Spent Fuel Storage Installation (ISFSI), and other radiological controlled

areas, and workers were adhering to these controls when working in these areas.

13

Enclosure

Implementation of these controls was reviewed against the criteria contained in 10 CFR

20, TSs, and Exelons procedures. The documents reviewed listed in the Attachment.

Radiological Hazards Assessment

The inspectors reviewed recent revisions to radiation protection procedures regarding

various radiation protection processes, including radiological postings, and

contamination monitoring. The inspectors determined that the new revisions did not

reduce the scope or effectiveness of previously established radiological controls.

Radiological Hazards Control and Work Coverage

The inspectors toured accessible radiological controlled areas in Units 1 & 2, including

the ISFSI, turbine buildings, and reactor buildings to confirm the accuracy of survey data

and the adequacy of postings and radiation work permits (RWP). The inspectors

reviewed survey maps for areas toured to determine the timeliness of survey data and

the adequacy of RWP controls.

Contamination and Radioactive Material Control

The inspectors observed workers surveying and releasing potentially contaminated

materials for unrestricted use. The inspectors verified that the counting instrumentation

was located in a low background area and that the instruments sensitivity was

appropriate for the type of contamination being measured.

Problem Identification and Resolution

Relevant IRs, associated with radiological controls, and electronic dosimeter dose/dose

rate alarm reports initiated between March through November 2010, were reviewed by

the inspectors. The inspectors discussed the IRs with licensee staff to determine if the

follow up activities were being conducted in an effective and timely manner,

commensurate with their safety significance.

b. Findings

No findings were identified.

4.

OTHER ACTIVITIES

4OA1 Performance Indicator (PI) Verification

.1

Barrier Integrity and Mitigating Systems Cornerstone PIs (71151 - 6 samples)

a. Inspection Scope

The inspectors sampled Exelons submittal of the Barrier Integrity cornerstone and

Mitigating Systems cornerstone PIs listed below to verify the accuracy of the data

recorded from October 2009 though September 2010. The inspectors utilized

performance indicator definitions and guidance contained in Nuclear Energy Institute

(NEI) 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 6,

to verify the basis in reporting for each data element. The inspectors reviewed various

14

Enclosure

documents, including portions of the main control room logs, issue reports, power history

curves, work orders, and system derivation reports. The inspectors also discussed the

method for compiling and reporting performance indicators with cognizant engineering

personnel and compared graphical representations from the most recent PI report to the

raw data to verify that the report correctly reflected the data. The documents reviewed

are listed in the Attachment.

Cornerstone: Barrier Integrity

Units 1 and 2 Reactor Coolant System Leak Rate (BI02); and

Units 1 and 2 Reactor Coolant System Activity (BI01).

Cornerstone: Mitigating Systems

Units 1 and 2 Mitigating System Performance Index, Cooling Water Systems (MS10).

b. Findings

No findings of significance were identified.

.2

Occupational Exposure Control Effectiveness PI (71151 - 1 sample)

a. Inspection Scope

The inspectors reviewed implementation of the licensees Occupational Exposure

Control Effectiveness PI Program (OR01). Specifically, the inspectors reviewed

electronic dosimetry alarm reports, IRs, and associated documents, for occurrences

involving locked high radiation areas, very high radiation areas, and unplanned

exposures against the criteria specified in NEI 99-02, Regulatory Assessment

Performance Indicator Guideline, Revision 6, to verify that all occurrences that met the

NEI criteria were identified and reported as performance indicators.

b. Findings

No findings were identified.

.3

RETS/ODCM Radiological Effluent Occurrences PI (71151 - 1 sample)

a. Inspection Scope

The inspectors reviewed relevant effluent release issue reports for the period October

2009 through November, 2010, for issues related to the public radiation safety

performance indicator, which measures radiological effluent release occurrences that

exceed 1.5 mrem/qtr whole body or 5.0 mrem/qtr organ dose for liquid effluents;

5mrads/qtr gamma air dose, 10 mrad/qtr beta air dose, and 7.5 mrads/qtr for organ dose

for gaseous effluents. The inspectors reviewed the following documents to ensure the

licensee met all requirements of the performance indicator (PR01):

Monthly projected dose assessment results due to radioactive liquid and gaseous

effluent releases;

15

Enclosure

Quarterly projected dose assessment results due to radioactive liquid and gaseous

effluent releases; and

Dose assessment procedures.

b. Findings

No findings were identified.

.4

Emergency Preparedness Cornerstone PIs (71151- 3 samples)

a. Inspection Scope

The inspectors reviewed data for Limericks EP PIs, which are: (1) Drill and Exercise

Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and, (3) ANS Reliability

(EP03). The inspectors reviewed the PI data and its supporting documentation from the

fourth quarter of 2009 through the third quarter of 2010 to verify the accuracy of the

reported data. The review of these PIs was conducted in accordance with NRC

Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02,

Regulatory Assessment Performance Indicator Guidelines, Revision 6.

b. Findings

No findings were identified.

4OA2 Identification and Resolution of Problems

.1

Review of Items Entered into the Corrective Action Program (CAP)

a. Inspection Scope

As required by Inspection Procedure 71152, Identification and Resolution of Problems,

and in order to help identify repetitive equipment failures or specific human performance

issues for follow-up, the inspectors screened all items entered into Limericks CAP. The

inspectors accomplished this by reviewing each new condition report, attending

management review committee meetings, and accessing Exelons computerized

database.

b. Findings

No findings were identified.

.2

Semi-Annual Review to Identify Trends (71152 - 1 trend sample)

a. Inspection Scope

The inspectors performed a semi-annual review of site issues, to identify trends that

might indicate the existence of more safety significant safety issues, as required by

Inspection Procedure 71152, Identification and Resolution of Problems. The

inspectors included in this review, repetitive or closely-related issues that may have

been documented by Exelon outside of the corrective action program, such as Plant

Health Committee reports including the Top Ten Equipment Issues List, the Plant Health

16

Enclosure

Committee Issues List, the Open Action Items List, and the Performance Improvement

Integration Matrix. The inspectors also reviewed Exelons corrective action database for

the third and fourth quarters of 2010, to assess IRs written in various subject areas (e.g.,

equipment problems, human performance issues, etc.), as well as individual issues

identified during the NRCs daily IR review (Section 4OA2.1).

b. Findings and Observations

No findings were identified. The inspectors assessed that Exelon was identifying issues

at a low threshold and entering the issues into the CAP for resolution.

Notwithstanding, the inspectors noted a recent negative trend concerning the health of

non-safety-related underground 13kV power supply cables. Within a 7-month period,

Limerick experienced three non-safety related cable failures. In two of the three cases,

the cables had previously been identified by Exelon as requiring repair or replacement

due to degraded insulation that was discovered during testing. Specifically:

On April 2, 2010, the 122 Plant Services Transformer supply cable faulted shortly

after being placed in service following maintenance (IR 1051496). Part of the

maintenance had been to repair a known, degraded section of cable insulation.

However, the fault occurred in a section of cable that had not been repaired, despite

being previously identified as degraded. At the time, Unit 1 was in a refueling outage

and therefore the effect on the plant was minimal.

On June 23, 2010, operators inserted a manual scram on Unit 1 as a result of the

loss of both recirculation pumps (IR 1083732). The initiator for the transient was the

fault of an underground portion of the 13kV power supply cable to the 144D

Technical Support Center Transformer. This, coupled with other non-related

equipment failures, resulted in the loss of the operating stator cooling water pump

and the tripping of the recirculation motor-generator sets. For more detail see FIN 05000352/2010004-02, Failure to Identify Incorrectly Adjusted Control Power Relay

Resulting in Unit 1 Manual Scram. This cable had not been tested, but had been

identified as requiring testing in the future.

On November 24, 2010, the 222 Plant Services Transformer supply cable faulted,

causing the loss of two of the three Unit 2 service water pumps (IR 1144472). This

cable was known to have degraded insulation resistance but had not been repaired.

Due to the ambient temperatures at the time of the loss (i.e. service water

temperatures were cool), Unit 2 was able to maintain full power operations using the

remaining service water pump.

The inspectors reviewed the extent of power supply cable insulation degradation at

Limerick. The inspectors noted that there were two other 13kV power supply cables that

testing had identified as degraded and requiring action in the near term. These cables

were associated with the Unit 1 A circulating water pump and the Unit 1 C circulating

water pump. Because of the recent failures, Exelon identified the need to expedite

replacement of known degraded cables and testing of the remaining cables. As a result,

a high impact team was established to coordinate cable replacements and other

corrective actions. At the close of the inspection period, cable replacements were

planned to commence in January 2011. In addition, Exelon planned to coordinate with

an industry research group to help determine the causes of cable failures and failure

mechanisms. The inspectors concluded that Exelon had identified this trend and

Exelons actions taken or planned to address the trend appeared to be comprehensive.

17

Enclosure

The inspectors determined this trend was not applicable to safety-related cables

because test results for the safety-related 4kV underground cables indicated they had

acceptable insulation resistance. This was primarily due to more favorable operating

conditions (e.g., lower operating voltage and intermittent operation of the load).

.3

Annual Sample: Underground Cable Vault Water Intrusion (71152 - 1 Annual sample)

a. Inspection Scope

The inspectors reviewed Limericks actions under IR 1056715, which was initiated to

track Exelon fleet-wide actions to improve long-term health of medium and low voltage

power cables routed in underground structures. The inspectors reviewed the corrective

actions taken or planned to assure the timeliness was commensurate with the potential

safety significance. The inspectors also interviewed plant personnel regarding the

identified issues and implemented corrective actions. Specific documents reviewed are

listed in the Attachment.

b. Findings and Observations

No findings were identified.

IR 1003826 was initiated by Limerick to track project actions necessary to establish and

maintain the underground manholes and conduits of both safety-related and non-safety-

related electrical manholes in a dry condition. As discussed in Section 4OA2.2 above,

the inspectors noted a recent negative trend concerning the health of non-safety-related

underground 13kV power supply cables. For all three non-safety-related power supply

cable failures experienced at Limerick in 2010, Exelon suspected that the wet

underground environment contributed to the failure. As a result, Exelon identified the

need to expedite replacement of known degraded cables and testing of cables that had

not been previously tested.

Exelons long-term action plan to improve underground cable reliability was still under

development at the time of this inspection. The long-term plan will be customized based

on the results of manhole inspections, water infiltration rates, and the risk ranking of

cables. The inspectors concluded, from review of the draft plan and discussions with

engineers, that the long-term plan will address appropriate factors including cable

testing, cable replacements, underground drainage system repairs and/ or modifications,

etc. For safety-related manholes and conduits, Exelon planned to install a pumping

system to maintain them dry. At the time of this inspection, the modification was

scheduled for installation by June 1, 2011. Based on a review of the key actions in IR

1056715 and IR 1003826 that have been taken to date, the inspectors concluded that

Exelons planned actions appeared to be timely and would improve long-term health of

the cables.

4OA3 Event Follow-up (71153 - 3 samples)

a. Inspection Scope

For the three plant events listed below, the inspectors reviewed and/or observed plant

parameters, reviewed personnel performance, and evaluated performance of mitigating

systems. The inspectors communicated the plant events to appropriate regional

18

Enclosure

personnel and compared the event details with criteria contained in Inspection Manual

Chapter 0309, Reactive Inspection Decision Basis for Reactors, for consideration of

potential reactive inspection activities. As applicable, the inspectors verified that Exelon

made appropriate emergency action classification assessments and properly reported

the event in accordance with 10 CFR Parts 50.72 and 50.73. The inspectors reviewed

Exelons follow-up actions related to the events to assure that appropriate corrective

actions were implemented commensurate with their safety significance.

Unit 2 A recirculation pump trip on October 23, 2010;

Loss of Plant Services Bus 222 on November 24, 2010; and

Unit 2 A recirculation pump trip on December 3, 2010.

b. Findings

No findings were identified.

4OA5 Other Activities

.1

Independent Spent Fuel Storage Installation (ISFSI) Monitoring Controls

(71124.01/60855 - 1 sample)

a. Inspection Scope

The inspectors reviewed routine operations and monitoring of the ISFSI (Docket No.

72-1004). The inspectors walked down the ISFSI and with the assistance of a Senior

Radiation Protection Technician, performed independent dose rate measurements of the

storage modules, and confirmed module temperatures were within the required limits.

The inspectors also reviewed plant equipment operator logs for ISFSI surveillances,

relevant issue reports, and environmental ISFSI dosimetry records. Radiological control

activities for the ISFSI were evaluated against 10 CFR 20, ISFSI TSs, and the

licensees procedures.

The inspectors also reviewed the effectiveness of radiological controls for the most

recent loading and transfer of five (5) dry storage casks, that was conducted during the

June through August 2010 period. Actual worker dose was compared to forecasted

estimated exposure and determined be within a reasonable range (< 50% difference)

and cumulative exposure was less than 5 person-rem.

b. Findings

No findings were identified.

.2

(Closed) Unresolved Item (URI) 05000352/353/2009006-02, Technical Specification

Requirements for Motor-Operated Valve (MOV) Thermal Overload Bypass Feature

a. Inspection Scope

During the 2009 component design bases inspection (CDBI), a URI was opened to

determine if Exelon was meeting the intent of TS 3.8.4.2.b regarding the bypassing of

thermal overloads on certain manually operated MOVs during an accident condition.

Exelon entered the issue into the CAP. The inspectors reviewed the IR and corrective

19

Enclosure

actions initiated to address the URI, which included a technical evaluation of the issue.

The inspectors reviewed procedures OP-LG-108-101-1004, Valves, Revision 4, and

OP-LG-103-102-1002, Strategies for Successful Transient Mitigation, Revision 5, to

determine whether the operators were provided adequate guidance on manually

operated MOV operation and bypassing of the thermal overloads. The inspectors

interviewed training staff to ensure thermal overload bypass operation was part of the

long range training program, and that the appropriate training had been in place and

conducted prior to the CDBI. The inspectors also interviewed operators and observed

simulated operator actions in the simulator to assess operator knowledge on proper

valve stroke indication, thermal overload actuation indication, and thermal overload

bypass operation of the manually operated MOVs to ensure complete valve operation.

b. Findings

No performance deficiencies or findings were identified and the URI is closed.

4OA6 Meetings, Including Exit

On January 7, the inspectors presented the inspection results to Mr. W. Maguire and

other members his staff. The inspectors confirmed that proprietary information was not

included in the inspection report.

ATTACHMENT: SUPPLEMENTAL INFORMATION

A-1

Attachment

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel:

W. Maguire, Site Vice President

E. Callan, Plant Manager

S. Johnson, Assistant Plant Manager

R. Dickinson, Director of Training

P. Gardner, Director of Operations

R. Kreider, Director of Maintenance

C. Gerdes, Security Manager

D. Merchant, Radiation Protection Manager

D. Palena, Manager Nuclear Oversight

J. Hunter, Manager, Regulatory Assurance

S. Bobyock, Manager, Plant Engineering Programs

N. Dennin, Shift Operations Superintendent

R. McLaughlin, Operations Support Manager

W. Lewis, Senior Engineering Manager

M. Gillin, Balance of Plant Engineering Manager

K. Slough, Mechanical/Structural Engineering Design Manager

M. DiRado, Engineering Rapid Response Manager

J. Risteter, Radiation Protection Manager

R. Harding, Regulatory Assurance Engineer

C. Goff, Operations Training Manager

T. Carr, Maintenance Supervisor

R. Rhode - Licensed Operator Requalification Training Supervisor

V. Hydro, Simulator Supervisor

R. Forst, Annual Operating Exam Developer

S. Cohen, Annual Operating Exam Developer

J. Mihm, Biannual Written Developer

F. Burzynski, Systems Engineer

M. Barth, Systems Engineer

J. Brittain, Senior Staff Engineer

S. Deihm, Work Week Manager

M. Leahy, Procurement Engineer Supervisor

M. Minicozzi, System Engineer

B. Tracey, Systems Engineer

G. Weiss, Systems Engineer

P. Welch, Maintenance Planner QV Inspector

D. Zaharchuk, Systems Engineer

J. Commiskey, Radiological Engineer

D. Wahl, Environmental Scientist

NRC Personnel:

E. DiPaolo, Senior Resident Inspector

N. Sieller, Resident Inspector

J. Hawkins, Acting Resident Inspector

A. Rosebrook, Senior Project Engineer

C. Crisden, Emergency Preparedness Specialist

A-2

Attachment

LIST OF ITEMS OPENED OR CLOSED

Opened

None

Closed

05000352/353/2009006-02 URI

Technical Specification Requirements for

Motor Operated Valve Thermal Overload

Bypass Feature (Section 4OA5.2)

Opened and Closed

None

Discussed

None

LIST OF DOCUMENTS REVIEWED

Common References

Limerick Unit 1 and Unit 2 UFSAR

Limerick Unit 1 and Unit 2 TSs

Limerick Unit 1 and Unit 2 Technical Requirements Manual

Limerick Unit 1 and Unit 2 Operator Logs

Section 1R01: Adverse Weather Protection

Issue Reports

1091311

Procedures

WC-AA-107, Seasonal Readiness, Revision 8

ARC-MCR-02, E-5, Spray Pond Pump Station Temperature Trouble, Revision 2

GP-7, Cold Weather Preparation and Operation, Revision 43

Work Orders

R1156051, Plant Heating Steam and Auxiliary Steam System

Miscellaneous

Letter of Certification of 2010 Limerick Winter Readiness, dated November 15, 2010

Open Winter Readiness Work items List

Section 1R04: Equipment Alignment

Procedures

S92.9.N, Routine Inspection of the Diesel Generators, Revision 59

Miscellaneous

System Notebook, Diesel Generator and Auxiliary Systems

Diesel Generator System Health Report

A-3

Attachment

2S92.1.N (COL - 3), Equipment Alignment for 2C Diesel Generator, Revision 23

UFSAR Section 8.3.1.1.3, Standby Power System

Licensee Event Report 1-96-006, CREFAS Inoperable Requiring Entry into TS 3.0.3,

May 30, 1996

2S55.1.A (COL), Equipment Alignment for Automatic Operation of HPCI System, Revision 17

Section 1R05: Fire Protection

Issue Reports

1129649

Procedures

F-S-001, Pre-Fire Plan Strategy for Spray Pond Structure Western Half (Fire Area 122),

Revision 12

F-S-002, Pre-Fire Plan Strategy for Spray Pond Structure Eastern Half (Fire Area 123),

Revision 10

ARC-MCR-006Q3L Turbine 239/269 Cond. Area/ TB, Revision 4

OP-MA-201-007, Fire Protection System Impairment Control, Revision 6

S22.8.H, Inoperable Fire Protection Equipment Actions, Revision 24

ST-7-084-925-0, Fire Door Closing Mechanism Inspection, Revision 5

F-A-024, Control Room and Peripheral Rooms

F-A-026, Remote Shutdown Room

Miscellaneous

A1747020

A1780973

Section 1R06: Flood Protection

Issue Reports

1154883

Procedures

SE-4-1, Reactor Enclosure Flooding, Revision 8

Miscellaneous

A 0-817141, Evaluate Door Preventive Maintenance

Section 1R11: Licensed Operator Requalification Program

Issue Reports

1140582

Procedures

LSES - 2004, Simulation Scenario, Revision 7

TQ-AA-150: Operator Training Programs Revision 4

T-225, Startup and shutdown of Suppression Pool and Drywell Spray Operation, Revision 020

Miscellaneous

TQ-AA-150, Operator Training Programs, Revision 4

HR-AA-07-101 NRC Licensed Operator Medical Examination

LLOR1001B, Residual Heat Removal System Review, SDC and ADHR

LLOR1001I, 1 Refueling 13 Plant Modifications

OP-AA-105-102 NRC Active License Maintenance

A-4

Attachment

EPRI NP-5562 Analysis of Anticipated Transients without Scram in Severe BWR Accidents

Simulator Test Review Board Minutes 2009-4 7/29/2009

Job Performance Measures (JPMs)

058, 086, 098, 099, 103, 114, 129, 131,134, 150, 210, 232, 261,515, 523, 758

Scenarios

LSES-2004, LSES-2035, LSES-3003, LSES-3004, LSES-5002, LSES-5003, LSES-5005,

LSES-7008

Written Examinations

NRC-2009-03-RO, NRC-2009-03-SRO, NRC-2009-04-RO, NRC-2009-04-SRO, NRC-2009-05-

SRO, NRC-2009-05-SRO

Simulator Work Requests

SWR 2008093/11090, Excessive Lag in Bypass Valve Closure as Pressure Drops after a

Turbine Trip

SWR 2008094/11107, Discrepancy between Plant and Simulator Generator Output

SWR 2008144/11338, Following core update, SLC shutdown takes longer than GE analysis

time

SWR 2008133/11272, Incorrect FW Temperature Used in Modeling Feed-Water Rupture in

Containment

SWR 2008121/11192, Open Lamp and OHA for TBV Should Operate at Same Set-point

SWR 2008102/11130, During ATWS, Power Remains Too High as Level is Lowered

Transient Tests 7.01, Reactor Scram, May 30, 2009 (Baseline: actual plant trips, SRB evaluation)

7.02, Trip of All Feed-water Pumps, May 30, 2009

7.03, Closure of All MSIVs, May 30, 2009

7.04, Trip of Both Recirculation Pumps, May 30, 2009

Annual/Normal Evolution Tests 6.12, Steady State Performance/Drift Test at 100% Power, July 26, 2009

1.12, Simulator to Reference Plant Critical Parameter Comparison, March 25, 2008

6.09, Normal Operations Performance Test: Reactor Trip Followed by Recovery to Rated

Power, November 22, 2009

Malfunction Tests

3-MPC257, Suppression Pool Water Leak to Reactor Enclosure, July 11, 2010

3-MED250B, Failure of 24 VDC Power Supply E/S-X-10082, March 18, 2007

3-MED015B, Inadvertent Trip of Safeguard Feeder Breaker 201-D11, January 13, 2007

3-MRH562A, RHR Pump B Suction Strainer Clogs - Small, August 9, 2009

3-MVI529B, RPV Pressure Transmitter PT42-103A Fails Low, June 28, 2008

3-MVI232C, RPV Level Transmitter LT-42-1N080B Fails Upscale, August 23, 2008

Non ANSI Testing

10-002-X-A, Integrated Response to Isolation of Condensate to Feed-water String A,

November 16, 2009

10-002-VII-D, Integrated Response to Trip of Four Circulating Water Pumps,

November 16, 2009

Physical Fidelity Checks Panel 00C424, October 2, 2010

Physical Fidelity Checks Panel 10C201-Remote Shutdown Panel, October 2, 2010

A-5

Attachment

Section 1R12: Maintenance Effectiveness

Issue Reports

1137553

1565145

Procedures

ASME Sect. III Code 3 Case N-513-2 Evaluation Criteria for Temporary Acceptance of Flaws in

Moderate Energy Class 2 or 3 Piping Section XI, Division I

ER-AA-310, Implementation of the Maintenance Rule, Revision 8

ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 8

MA-AA-716-210, PCM Process, Revision 10

Miscellaneous

Action - A1782939

Engineering Change Request 03-00705

Operability Evaluation, OPE-10-008, Revision 08

Work Order C0235674

Work Order C0235822

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Issue Report

1010943

1051496

1055147

1100185

1129709

1131393

1144472

1148152

Procedures

WC-LG-101-1001, Guideline for the Performance of On-Line Work/ On-Line System Outages,

Revision 14

WC-LG-104-1001, Guideline for the Review, Screening and Execution of Operation Risk

Activities, Revision 3

OP-AA-108-117, Protected Equipment Program, Revision D

MA-AA716-004, Attachment 2 Complex Troubleshooting, Revision 10

ER-AA-3003 Cable Condition Monitoring Program, Revision 0

OP-AA-106-101-1006, Issue Resolution Documentation Form, Revision 8

OP-AA-101-113-1004, Equipment Prompt Verbal Report, Revision 17

OP-AA-108-117, Protected Equipment Program, Revision D

OP-LG-108-117-1000, Limerick Protected Equipment Program, Revision 1

WG-AA-101, Online Work Control Process, Revision. 17

WG-LG-101-1001, Guideline for the Performance of Online Work/Online System Outages,

Miscellaneous

Generic Letter 80-30, Clarification of the Term Operable as it Applies to Single Failure

Criterion for Safety Systems Required by Technical Specifications, April 10, 1980.

ECR 10-00458

OT-112

OT-104

Action Request

A1785133

A1751413

A1586003

A-6

Attachment

A1663427

A1535446

A1709610

A1786141

Work Order

C0236019

C0233546

C0233547

Section 1R15: Operability Evaluations

Issue Reports

0642968

0642968

0985994

1115912

1137523

1140448

1143434

1144238

1144249

1144292

1145979

1151354

1152249

Procedures

ST-2-026-360-0, General Atomics Digital Process Radiation Monitors, Revision 4

ASME Code Case N-513-2, Evaluation Criteria for Temporary Acceptance of Flaws in

Moderate Energy Class 2 or 3 Piping Section XI, Division 1

M-C-756-001 HPCI Turbine Inspection, Revision 26

OP-AA-108-115, Operability Determinations, Revision 9

OP-AA-108-115-1002 Attachment 1, Supplemental Considerations for On-Shift Immediate

Operability Determinations, Revision 002

RT-2-011-252-0 (251-0) A Loop (B Loop) ESW Loop B Flow Balance, Revision 21

RT-6055-330-1(2) HPCI Turbine Over-speed Mechanism Operability Check, Revision 20

S92.9.N Routine Inspection of Diesel Generators, Revision 59

ST-6-055-230-1 HPCI Pump, Valve and Flow Test, Revision 74

Miscellaneous

Operability Evaluation OPE-10-008, Revision 8

ASME Code (OM) 1990 Sect. ISTC 4.2.9 (b)

GE SIL 392 Rev. 1 Improved HPCI Turbine/Mechanical Over-speed Trip Design

Generic Letter 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code

Class 1, 2, and 3 Piping

LER 87-066-00 HPCI Inoperability Due to Malfunction of Hydraulic-Mechanical Over-speed Trip

Mechanism

Terry Turbine Maintenance Guide for HPCI Applications

Operability Evaluation

OL1 - Turbine Reservoir HPCI Turbine Oil Sample Results from Dec. 09 - Sept. 10

OPE-10-09, Revision 0

OPE-09-005

Action Request

A1643599

A1538528

A1522918, Evaluation 50

A1733595

A-7

Attachment

Work Order

C0231042

C0236115

Section 1R19: Post-Maintenance Testing

Issue Reports

1123479

0747229

0748913

0750139

0750404

0911901

0913964

0953751

0997302

1039893

1064929

1136029

1138439

1139723

1139996

1140214

1140215

1143600

1151949

Procedures

EP-MA-124-1001-F-02, Technical Support Center/Operational Support Center Equipment Test,

Revision E

ARC-MCR-222 F-5, Unit 2 Division 2 Safeguard Battery Ground, Revision 2

CC-MA-304, Establishing and Maintaining Component Classification, Revision 0

ER-AA-340-1001 GL 89-13 Program Implementation Instructional Guide, Revision 007

GP-8.4 U/1 (U/2) Attachment 1 Isolation Bypass, Revision 008

NE-C-211 CRL Control, Revision 011

NE-C-240 Component Identification and Descriptions, Revision 001

RT-2-011-254-0 ESW Loop B D/P and Flow Data Collection, Revision 022

ST-2-072-106-1 (2) 4 Div I Refuel Floor BOP Isolation LSF/SAA and SGTS Test, Revision 1

ST-6-092-365-0 Attachment 4 Inoperable Unit 1 Safeguard Power Supply Actions for Both

Units, Revision 38

T-228, Inerting and Purging Primary Containment, Revision 022 (1)

2S11.1.A (COL-2) Equipment Alignment of ESW Loop B System, Revision 33

Miscellaneous

Calculation 1001, Compartment Temperature Transients for Steam and Water Leaks,

Revision 4b

IN 86-82 Failures of Scram Discharge Volume Vent and Drain Valves

P&ID 8031-M-61, Liquid Radwaste Collection, Sheet 4, Revision. 15

2A RRP Voltage Regulator Action Plan 12/15/10

Engineering Change 09-00551, Permanent Setpoint Change for TIS-025-101/201 B & D

Technical Evaluation for IR 390341, Recommendations for PMT of CREFAS Isolation Valves

Troubleshooting, Rework and Testing 10-127, Investigate Changing Leakrate of U2 DW

Equipment Drain Sump Leak Rate

Action Request

A1606276, Technical Evaluation

Work Orders

C0217140

C0235528

C0217141

C0229269

Section 1R22: Surveillance Testing

Issue Reports

1134173

1132485

1117800

0836062

0844439

0884271

1052559

1123250

1133664

1133723

1137894

1137977

1138001

1138015

A-8

Attachment

Procedures

OP-AA-108-103, Locked Equipment Program, Revision 2

CC-MA-304 Establish and Maintaining Component Classification, Revision 0000

M-C-747-016 CRD Scram Vent and Drain Valve Examination and Maintenance, Revision 004

S32.8.A Placing Unit 1 Main Transformers and 11 Unit Aux Transformers in SVC, Revision 22

S92.9.N, Routine Inspection of the Diesel Generators, Revision 59

ST-4-LLR-361-1 Scram Discharge Volume Vent and Drain Valves, Revision 009

ST-6-047-200-1 SDV Valve Exercise Test, Revision 024

ST-6-049-230-1, RCIC Pump, Valve and Flow Test Revision 074

ST-6-052-760-1 Safeguard Piping Fill Quarterly Valve Test, Revision 017

ST-6-092-114-2, D24 Diesel Generator 24 Hour Endurance Test, Revision 29

ST-6-092-323-1 D13 DG LOCA/LOAD Reject Testing and Fast Start Operability Test Run,

Revision 019

ST-6-092-365-0, Inoperable Unit 1 Safeguard Power Supply Actions for Both Units, Revision 38

Action Request

A1684886

Work Order

C0232841

Section 1EP4:Drill Evaluation

Issue Reports

1096028

1098708

Procedures

EP-AA-112-100-F-01, Shift Emergency Director Check List, Revision. K

EP-AA-114-F-01, Release In Progress Determination Guidance, Revision. D

Limerick Station Annex Table LGS 3-1, Emergency Action Matrix, Revision. 18

Limerick 2010 Off-Year Exercise Evaluation Report

Section 2RS01: Radiological Hazard Assessment and Exposure Controls

Procedures

RP-AA- 376, Radiological Postings, Labeling, and Markings, Revision 5

RP-AA-376-1001, Radiological Postings, Labeling, and Marking Standard, Revision 5

RP-AA-503, Unconditional Release Survey Method, Revision 4

Section 4OA1: Performance Indicator Verification

Issue Reports

1136395

1137448

1096698

1098653

1102973

1090623

1090880

1092212

1094965

1080457

1080717

1081159

1081428

1039368

1053889

1051357

1002432

1005495

1051506

Procedures

ST-5-061-570-0, RadWaste Discharge Permit, Revision 43

ST-5-076-826-0, Monthly Gaseous Release Dose Calculations, Revision 14

LS-AA-2150, Monthly Data Elements for RETS/ODCM Radiological Effluent Occurrences,

Revision 5

A-9

Attachment

LS-AA-2140, Monthly Data Elements for NRC Occupational Exposure Control Effectiveness,

Revision 5

CY-LG-120-105; Obtaining Samples from and Operation of the Reactor Enclosure Sample

Station, Revision 11

CY-LG-120-110; Chemistry Sampling and Analysis, Revision 10

ER-AB-331-1006; BWR RCS Leakage Monitoring and Action Plan, Revision 2

LS-AA-2001; Collecting and Reporting of NRC Performance Indicator Data, Revision 13

LS-AA-2100, Monthly Data Elements for NRC Reactor Coolant (RCS) Leakage, Revision 5

LS-AA-2200; Mitigating System Performance Index Data Acquisition and Reporting, Revision 3

ST-5-041-885-1; Dose Equivalent I-131 Determination, Revision 19

ST-5-041-885-2; Dose Equivalent I-131 Determination, Revision 15

ST-6-107-596-1, Drywell Floor Drain Sump/Equipment Drain Tank Surveillance Log/OPCON

1,2,3, Revision 22

ST-6-107-596-2, Drywell Floor Drain Sump/Equipment Drain Tank Surveillance Log/OPCON

1,2,3, Revision 25

Miscellaneous

Main Control Room Operator Logs 11/1/2009-12/13/2010

NEI 99-02; Regulatory Assessment Performance Indicator Guideline, Revision 6

Reactor Oversight Program MSPI Basis Document, Limerick Generating Station, Revision 1

U1 MSPI Cooling Water System Unavailability and Unreliability Index for 2010

U2 MSPI Cooling Water System Unavailability and Unreliability Index for 2010

Section 4OA2: Problem Identification and Resolution

Issue Reports

1056715

1003826

Section 4OA3: Event Followup

Procedures

OT-1/2, Recirculation Pump Trip, Revision 45

Section 4OA5: Other Activities

Correction Action Documents

00985060

Evaluations

Limerick Position Paper on Compliance with Technical Specification 3.8.4.2 Motor Operated

Valves Thermal Overload, Revision 0

Procedures

OP-LG-108-101-1004, Valves, Revision 4

OP-LG-103-102-1002, Strategies for Successful Transient Mitigation, Revision 5

ST-6-107-590-0, Daily Surveillance Log/Common Plant - At all times, Revision 87

RP-AA-214, Area TLD Surveillance, Revision 3

A-10

Attachment

LIST OF ACRONYMS

ADAMS

Agencywide Documents Access Management System

ANS

Alert and Notification System

CAP

Corrective Action Program

CDBI

Component Design Bases Inspection

CFR

Code of Federal Regulations

DEP

Drill and Exercise Performance

EAL

Emergency Action Level

EDG

Emergency Diesel Generator

EP

Emergency Preparedness

ERO

Emergency Response Organization

ESW

Emergency Service Water

HPCI

High Pressure Coolant Injection

IR

Issue Report

IST

In-Service Testing

ISFSI

Independent Spent Fuel Storage Installation

JPM

Job Performance Measures

MG

Motor Generator

MOV

Motor-Operated Valve

NEI

Nuclear Energy Institute

NRC

Nuclear Regulatory Commission

OOS

Out of Service

P&ID

Piping and Instrumentation Drawing

PI

Performance Indicator

PARS

Publicly Available Records

RHR

Residual Heat Removal

RTP

Rated Thermal Power

RWP

Radiation Work Permits

SDV

Scram Discharge Volume

SSC

Structure, System, Component

ST

Surveillance Test

TS

Technical Specification

UFSAR

Updated Final Safety Analysis Report

URI