Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23353A15731 October 2023UFSAR Revision 28 (Redacted Version)Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Half scram
Ultimate heat sink
Mission time
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Temporary Modification
Squib
VT-2
Emergency Lighting
Aging Management
Abnormal operational transient
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Design basis earthquake
Scram Discharge Volume
Process Control Program
Feedwater Controller Failure
Battery sizing
Overtravel
License Renewal
Earthquake
Control of Heavy Loads
Power-Operated Valves
Hardened vent
Fuel cladding
Recently irradiated fuel
Accidental discharge
Fire Protection Program
Power change
Coast down
GOTHIC
Unidentified leakage
Failure to Scram
ML22292A1155 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Table of ContentsLoop seal
Coatings
ML22292A1285 October 20225 to Updated Final Safety Analysis Report, Appendix a, Reload AnalysisShutdown Margin
Stroke time
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
Fuel cladding
ML22292A1275 October 20225 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML22292A1265 October 20225 to Updated Final Safety Analysis Report, Chapter 15, Table of ContentsAbnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
ML22292A1255 October 20225 to Updated Final Safety Analysis Report, Chapter 15, AppendicesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Half scram
Safe Shutdown Earthquake
Operating Basis Earthquake
Operator Manual Action
Abnormal operational transient
Double blade guide
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Rod Drop Event
Spiral reload
Fuel cladding
Power change
Coast down
ML22292A1295 October 20225 to Updated Final Safety Analysis Report, Chapter 14, Table of ContentsShutdown Margin
Emergency Lighting
ML22292A1245 October 20225 to Updated Final Safety Analysis Report, Appendix C, Licensee Renewal Supplement - Aging Management Programs and Time-Limited Aging AnalysesFire Barrier
Hydrostatic
Coatings
Operating Basis Earthquake
Aging Management
License Renewal
Biofouling
EVT-1
Fire Protection Program
Power Uprate
ML22292A1235 October 20225 to Updated Final Safety Analysis Report, Appendix a, Figure A.0-1, the Content of Figure A.0-1 Is Historical and Has Been Deleted
ML22292A1215 October 20225 to Updated Final Safety Analysis Report, Appendix B
ML22292A1205 October 20225 to Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Fuel cladding
ML22292A1225 October 20225 to Updated Final Safety Analysis Report, Chapter 17, Quality AssuaranceNon-Destructive Examination
Nondestructive Examination
Condition Adverse to Quality
ML22292A1185 October 20225 to Updated Final Safety Analysis Report, Chapter 15, FiguresFeedwater Controller Failure
ML22292A1175 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures
ML22292A1165 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft
ML22292A1305 October 20225 to Updated Final Safety Analysis Report, Chapter 17, Figures
ML22292A1135 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Zebra Mussel
Tornado-Generated Missile
Design basis earthquake
Frazil ice
Overtravel
Earthquake
Power-Operated Valves
Fuel cladding
Unidentified leakage
Power Uprate
ML22292A1145 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position Cmeb 9.5-1, Rev. 2 Dated July 1981Safe Shutdown
Ultimate heat sink
Fire Barrier
Hydrostatic
Emergency Lighting
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML22292A1125 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Abnormal operational transient
Scram Discharge Volume
Earthquake
Turbine Missile
Fuel cladding
ML22292A1115 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Through 6.2Boric Acid
Reactor Vessel Water Level
Loop seal
High Radiation Area
Grab sample
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Tornado-Generated Missile
Surveillance Frequency Control Program
Scram Discharge Volume
MELLLA
Earthquake
Power-Operated Valves
Fuel cladding
GOTHIC
ML22292A1105 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End
ML22292A1095 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End
ML22292A1085 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3Earthquake
Turbine Missile
ML22292A1065 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B Thru 9CHot Short
Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Excess Flow Check Valve
Earthquake
Control of Heavy Loads
ML22292A1055 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42Earthquake
ML22292A1045 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7Safe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Squib
Abnormal operational transient
Surveillance Frequency Control Program
Overtravel
Earthquake
Fuel cladding
Power change
ML22292A1035 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38
ML22292A1025 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1Loop seal
Post Accident Monitoring
Hydrostatic
GOTHIC
ML22292A1015 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F
ML22292A0965 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Table of ContentsSafe Shutdown
Ultimate heat sink
Fire Barrier
Control of Heavy Loads
ML22292A0935 October 20225 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML22292A0915 October 20225 to Updated Final Safety Analysis Report, Chapter 5, Table of ContentsReactor Vessel Water Level
Grab sample
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Abnormal operational transient
Pressure and Temperature Limits Report
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Unidentified leakage
Unidentified leak
Power Uprate
ML22292A0925 October 20225 to Updated Final Safety Analysis Report, Chapter 11, Figures
ML22292A0945 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Table of ContentsSafe Shutdown
ML22292A0955 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8ASafe Shutdown
Half scram
Fire Barrier
Slow transfer
Safe Shutdown Earthquake
Coatings
Reserve Station Service Transformer
Operating Basis Earthquake
Emergency Lighting
Surveillance Frequency Control Program
ML22292A0845 October 20225 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
Grab sample
Hydrostatic
Operating Basis Earthquake
Temporary Modification
Design basis earthquake
Power-Operated Valves
Turbine Missile
Power change
Coast down
ML22292A0895 October 20225 to Updated Final Safety Analysis Report, Chapter 5, Figures
ML22292A0905 October 20225 to Updated Final Safety Analysis Report, Chapter 4, Table of ContentsShutdown Margin
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Pressure and Temperature Limits Report
Scram Discharge Volume
Overtravel
Fuel cladding
Power change
Coast down
ML22292A0885 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Table of ContentsUltimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Earthquake
ML22292A0875 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Table of ContentsAnticipated operational occurrence
Earthquake
Turbine Missile
ML22292A0865 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Hazardous Materials Data Collection
ML22292A0855 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55
ML22292A0835 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5Safe Shutdown
Half scram
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Reserve Station Service Transformer
Operating Basis Earthquake
Tornado-Generated Missile
Abnormal operational transient
Tornado Missile Protection
Design basis earthquake
Scram Discharge Volume
Overtravel
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Power change
Unidentified leakage
ML22292A1315 October 20225 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69
ML22292A0975 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8Safe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado-Generated Missile
Tornado Missile Protection
Earthquake
Liquid penetrant
Through-Wall Leakage
ML22292A0985 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed
ML22292A0995 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End
ML22292A1005 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2C Through 2IEarthquake
Biofouling
NMP2L2821, 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System5 October 20225 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System
ML22292A1385 October 20225 to Updated Final Safety Analysis Report, Chapter 18, Figures