ML23353A157 | 31 October 2023 | UFSAR Revision 28 (Redacted Version) | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Half scram Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Weld Overlay Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Temporary Modification Squib VT-2 Emergency Lighting Aging Management Abnormal operational transient Pressure and Temperature Limits Report Surveillance Frequency Control Program Design basis earthquake Scram Discharge Volume Process Control Program Feedwater Controller Failure Battery sizing Overtravel License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Hardened vent Fuel cladding Recently irradiated fuel Accidental discharge Fire Protection Program Power change Coast down GOTHIC Unidentified leakage Failure to Scram |
ML22292A115 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 6, Table of Contents | Loop seal Coatings |
ML22292A128 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Appendix a, Reload Analysis | Shutdown Margin Stroke time Anticipated operational occurrence Abnormal operational transient Feedwater Controller Failure Fuel cladding |
ML22292A127 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 14, Figures | |
ML22292A126 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents | Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure |
ML22292A125 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Appendices | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Half scram Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Abnormal operational transient Double blade guide Scram Discharge Volume Feedwater Controller Failure MELLLA Rod Drop Event Spiral reload Fuel cladding Power change Coast down |
ML22292A129 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents | Shutdown Margin Emergency Lighting |
ML22292A124 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Appendix C, Licensee Renewal Supplement - Aging Management Programs and Time-Limited Aging Analyses | Fire Barrier Hydrostatic Coatings Operating Basis Earthquake Aging Management License Renewal Biofouling EVT-1 Fire Protection Program Power Uprate |
ML22292A123 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Appendix a, Figure A.0-1, the Content of Figure A.0-1 Is Historical and Has Been Deleted | |
ML22292A121 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Appendix B | |
ML22292A120 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Fuel cladding |
ML22292A122 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assuarance | Non-Destructive Examination Nondestructive Examination Condition Adverse to Quality |
ML22292A118 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Figures | Feedwater Controller Failure |
ML22292A117 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures | |
ML22292A116 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft | |
ML22292A130 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 17, Figures | |
ML22292A113 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Zebra Mussel Tornado-Generated Missile Design basis earthquake Frazil ice Overtravel Earthquake Power-Operated Valves Fuel cladding Unidentified leakage Power Uprate |
ML22292A114 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position Cmeb 9.5-1, Rev. 2 Dated July 1981 | Safe Shutdown Ultimate heat sink Fire Barrier Hydrostatic Emergency Lighting Earthquake Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML22292A112 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Abnormal operational transient Scram Discharge Volume Earthquake Turbine Missile Fuel cladding |
ML22292A111 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Through 6.2 | Boric Acid Reactor Vessel Water Level Loop seal High Radiation Area Grab sample Stroke time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Tornado-Generated Missile Surveillance Frequency Control Program Scram Discharge Volume MELLLA Earthquake Power-Operated Valves Fuel cladding GOTHIC |
ML22292A110 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End | |
ML22292A109 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End | |
ML22292A108 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 | Earthquake Turbine Missile |
ML22292A106 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B Thru 9C | Hot Short Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operator Manual Action Multiple Spurious Operation Emergency Lighting Excess Flow Check Valve Earthquake Control of Heavy Loads |
ML22292A105 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 | Earthquake |
ML22292A104 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7 | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Squib Abnormal operational transient Surveillance Frequency Control Program Overtravel Earthquake Fuel cladding Power change |
ML22292A103 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 | |
ML22292A102 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 | Loop seal Post Accident Monitoring Hydrostatic GOTHIC |
ML22292A101 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F | |
ML22292A096 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents | Safe Shutdown Ultimate heat sink Fire Barrier Control of Heavy Loads |
ML22292A093 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 10, Figures | |
ML22292A091 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 5, Table of Contents | Reactor Vessel Water Level Grab sample Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Incorporated by reference Abnormal operational transient Pressure and Temperature Limits Report Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Unidentified leakage Unidentified leak Power Uprate |
ML22292A092 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 11, Figures | |
ML22292A094 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 7, Table of Contents | Safe Shutdown |
ML22292A095 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A | Safe Shutdown Half scram Fire Barrier Slow transfer Safe Shutdown Earthquake Coatings Reserve Station Service Transformer Operating Basis Earthquake Emergency Lighting Surveillance Frequency Control Program |
ML22292A084 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal Grab sample Hydrostatic Operating Basis Earthquake Temporary Modification Design basis earthquake Power-Operated Valves Turbine Missile Power change Coast down |
ML22292A089 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 5, Figures | |
ML22292A090 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 4, Table of Contents | Shutdown Margin Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Pressure and Temperature Limits Report Scram Discharge Volume Overtravel Fuel cladding Power change Coast down |
ML22292A088 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Table of Contents | Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
ML22292A087 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents | Anticipated operational occurrence Earthquake Turbine Missile |
ML22292A086 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Hazardous Materials Data Collection | |
ML22292A085 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 | |
ML22292A083 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5 | Safe Shutdown Half scram Ultimate heat sink Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Reserve Station Service Transformer Operating Basis Earthquake Tornado-Generated Missile Abnormal operational transient Tornado Missile Protection Design basis earthquake Scram Discharge Volume Overtravel Earthquake Turbine Missile Fuel cladding Liquid penetrant Power change Unidentified leakage |
ML22292A131 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 | |
ML22292A097 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8 | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Tornado Missile Protection Earthquake Liquid penetrant Through-Wall Leakage |
ML22292A098 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed | |
ML22292A099 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End | |
ML22292A100 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2C Through 2I | Earthquake Biofouling |
NMP2L2821, 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System | |
ML22292A138 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 18, Figures | |