START-UP INTERNAL TECHNICAL REVIEW TEST GROUP MANAGER REVIEW AND APPROVAL (1)
REVIEW CYCLE (2)
JOINT TEST GROUP APPROVAL
- 1. FINAL STEP FOR SELECTED PRELIMINARY TESTS.
- 2. JTG MEMBERS, QUALITY ASSURANCE AND OTHERS AS DESIGNATED BY THE TEST GROUP MANAGER.
FIGURE 14.2-1 REVIEW CYCLE FOR SELECTED PRELIMINARY ANO ALL PREOPERATIONALTESTPROCEDURES NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 24 FEBRUARY 1986
I-a:
z w
w
- =
0 0
a::
0..
w LL w
0..
I/)
I 0
a:
0 0
w
- c z
- c llJ w
..J
~
u c(
ii:
I-a:
LL 0
m w
I-90 I
80 I
70 I
60 240 I I 50 200 I I 40 160 I I 600 30 120 I I I 400 20 80 I I I 200 10 40 I I I a
0 0
I 0
2000 EFFICIENCY 40 I-I w~
TYPICAL NPSHR ~ -- _.. -
_"\\---
20
- ~----, -;r;,a:
BHP AT 1.0 S.G.'.. -
0 a.. z CAPACITY - U.S. GALLONS PER MINUTE 4000 6000 8000 10,000 12,000 FIGURE 14.2-lb-1 SERVICE WATER PUMP CHARACTERISTIC CURVE NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVfSION 0 APRIL 1989
(
TECHNICAL REVIEW (LEAD STD&A AND POWER ASCENSION MANAGER) i STAFF REVIEW (IN ACCORDANCE WITH AP'S) i SORC REVIEW AND ACCEPTANCE
.f ***** SRAB REVIEW*
APPROVAL BY GENERAL SUPERINTENDENT
- ONLY AS REQUIRED BY THE GENERAL SUPERINTENDENT FIGURE 14.2-2 REVIEW CYCLE FOR INITIAL STARTUP TEST PROCEDURES NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 28 MAY 1987
TEST ENGINEER REVIEW l
TEST GROUP MANAGER/LEAD ENGINEER (1)
JOINT TEST GROUP REVIEW AND APPROVAL l
SORC REVIEW AND ACCEPTANCE OF SYSTEM l
ACCEPTANCE BY THE STATION SUPERINTENDENT
- 1. FINAL STEP FOR PRELIMINARY TEST RESULTS EXCEPT AS NOTED IN 14.2.5.1 FIGURE 14.2-3 PRELIMINARY AND PREOPERATIONAL TEST RESULTS REVIEW NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 24 FEBRUARY 1986
I I
TECHNICAL REVIEW AND ACCEPTANCE i
STATION SUPERINTENDENT REVIEW AND ACCEPTANCE i
QUALITY ASSURANCE REVIEW AND ACCEPTANCE i
SORC REVIEW AND ACCEPTANCE (GE LEAD STD&A, S.O.M., TECHNICAL SUPT.,
AND POWER ASCENSION MANAGER) i*****+SRAB*
GENERAL SUPERINTENDENT REVIEW AND APPROVAL
- ONLY AS REQUIRED BY THE GENERAL SUPERINTENDENT FIGURE 14.2-4 INITIAL STARTUP TEST RESULTS REVIEW NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 28 MAY 1987
110 no 100 10 10 JO 10 to
- o
- io JO 10 0
0 1G JO lO IQ "llClln CDllS fl.OW CONDmON (TC)
RECIRC PUMPS OPERATING ON LOW FREQUENCY POWER SUPPLY 2
BETWEEN 50'!& ANO 75'16 CONTROL ROD LINES, AT OR BELOW THE ANALYTICAL LOWER LIMIT OF MASTER FLOW CONTROL MOOE 3
FROM 50% TO 75'16 CONTROL ROD LINES AND CORE FLOW BETWEEN 80% ANO MAXIMUM ALLOWABLE 5
lalWJN 8 TO *SX a:: TH£ llAlEll ROD LIHE 8ETllUN NATURAi. ClRClll.llTIDN Alt!>&: ABDVC.
"DE NW.YTICM.. LOliER LlllT CF MllST£R ~
Fl.DV t1lN1RCL Al.SO FROH TH: lOiir.(
ADO UNE TO Tt£ ee% llOO LIN£ llT HlllUML ClRCU.llTTOtf.
6 WITHIN 0 TO *6'16 OF RA TED THERMAL POWER, ANO WITHIN Mii OF RA TEO CORE FLOW RA TE FIGURE 14.2-5 TEST CONDITION REGION DEFINITION NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 0 APRIL 1989
THIS FIGURE HAS BEEN DELETED FIGURE 14.2-6 i
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 22 NOVEMBER 1985
SUPERVISOR OF OPERATIONS OPERATIONS STAFF STATION SUPERINTENDENT I
NMP:Z PROJECT DIRECTOR STARTUP MANAGER I
SWEC PROJECT MANAGER TEST GROUP MANAGERS TEST ENGINEERS AND STAFF I
GE SITE OPERATIONS MANAGER SWEC PROJECT ADVISORY ENGINEER I
GE LEAD ENGINEER STARTUP l TEST DESIGN AND ANALYSIS I
GESTARTUPl TEST DESIGN AND ANALYSIS ENGINEERS I
GE OPERATIONS SUPERINTENDENT I
GE SHIFT SUPERINTENDENTS FIGURE 14.2-7 UNIT 2 STARTUP ORGANIZATION NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 16 DECEMBER 1984
JOO
]
200 c...
~
100 0
0 100
~
~
0...... z c iii so Q
- .J u
':t SAFE UPTO l.IMITEO POWER 25 UNSAFE 50 7r; 100 RATED POWER 1%1 RATED POWER 1%1 FIGURE 14.2-21 ~-1 RCIC ACCEPTANCE CRITERIA CURVES FOR CAPACITY AND ACTUATION TIME NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENTS JANUARY 1984
6 UJ
~
w
- E j::
w
(/) z 0 n.
en w a:
0.45 -------..,...----.----"!"""------...,..----.
0.4 1---------+-------ti,--+--------+-----1 0.3 0.2 AREA OF ACCEPTABLE RESPONSE AREA OF UNACCEPTABLE RESPONSE 0...... ------~--------------------------------
0 0.1 0.2 0.3 DELAY TIME (SEC)
FIGURE 14.2-233-1 TRADEOFF CURVE FOR STEP SIZES 0.2P. TO 0.5~
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 0 APRIL 1989
(
6 IJJ
~
w
~
j::
w en z 0
0..
(/)
UJ cc 0.45 -------,....--~.----ir-------~---..,
0.4 1-------+-----~---ir----------t----t 0.3 0.2 AREA OF ACCEPTABLE RESPONSE AREA OF UNACCEPTABLE RESPONSE 0 L..----------------------__... ____.._ ________
~
0 0.1 0.2 0.3 DELAY TIME (SEC)
FIGURE 14.2-234-1 TRADEOFF CURVE FOR STEP SIZES 0.2% TO 0.3 %
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENTS JANUARY 1984
I,
TO BE PROVIDED IN GE TEST INSTRUCTIONS FIGURE 14.2-239-1 TWO-PUMP TRIP COASTDOWN CURVES NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENTS JANUARY 1984