MONTHYEARML22292A1182022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Figures ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A1022022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1362022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5-1, at the Controls Main Control Room El. 306'-0 ML22292A0772022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22292A0662022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22292A1272022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Figures ML22292A0932022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22292A0892022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Figures ML22292A1372022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Figures ML22292A1102022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End ML22292A1172022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A1092022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End ML22292A1012022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F ML22292A0632022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Figures ML22292A0992022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End ML22292A0652022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures ML22292A0922022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Figures ML18018B3202018-01-18018 January 2018 Undersized Documents - Transformer 2MTX-XM1B - Oil Cooler Piping, Failed Windings, Tank Bulging, Preparation for Removal, HV Tap Changer, and Lv Leads and Bracing ML18018B1942018-01-18018 January 2018 Undersized Documents, Drawings and Photographs ML17037C7252017-02-0606 February 2017 Drawing; Figure 7.15-1, Rod Worth Minimizer Functional Control Diagram ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037B4552017-02-0606 February 2017 Drawing 12177-EE-1AR-3, 600V One Line Diagram 2EHS*MCC102 Auxiliary Building North - Nine Mile Point Nuclear Station - Unit 2. ML17037A7102017-02-0606 February 2017 Figure 12.7-1a Radiation Zones - Reactor Building. ML17037C6602017-02-0606 February 2017 Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation ML17037C6592017-02-0606 February 2017 Figure 5.4-2; Hydrogen and Oxygen Concentration in Primary Containment Following a LOCA ML17037C6582017-02-0606 February 2017 Figure 5.3-2; Stand-by Gas Treatment System ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037A7122017-02-0606 February 2017 Figure 12.7-2a, Radiation Zones-Turbine Building, Radwaste Building, and Screenwell. ML17037A8182017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC24 ML17037A6892017-02-0606 February 2017 Figure 12.1-1, General Arrangement Reactor Building - Plans ML17037A6902017-02-0606 February 2017 Figure 7.9 - 1A, Feedwater Control System. ML17037A6922017-02-0606 February 2017 Figure 7.6-7, Rod Block Interlocks from Neutron Monitoring System ML17037A8292017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC14A ML17037A8382017-02-0606 February 2017 Drawing - (Drawing No. Not Available) ML17037A7142017-02-0606 February 2017 Drawing No. 12241-GSK-31, Over Excavated Area - Reactor Containment - Locations. ML17037A4622017-02-0606 February 2017 Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 4 ML17037A8272017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC15 ML17037B4562017-02-0606 February 2017 Drawing 12177-EE-1AQ-3, 600V One Line Diagram 2EHS*MCC101 & 2EHS*MCC301 Screenwell Building - Nine Mile Point Nuclear Station - Unit 2. ML17037A8162017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC25A ML17037A6942017-02-0606 February 2017 Figure 7.4-10, Power Range Neutron Monitoring System Instrument Electrical Diagram ML17037A7052017-02-0606 February 2017 Figure 2.7-16, Screenwell Building Plan and Sections 2022-10-05
MONTHYEARML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A0822022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1 Thru 1.2-19 Sheet 2 ML22292A0732022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 02, Appendix 2B Table 2B-39 ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018A9612018-01-18018 January 2018 Preservice Inspection Plan ML17037C6892017-02-0606 February 2017 Table 7.2-1, Process Pipelines Penetrating Primary Containment, 1 of 6 ML17037A6592017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-4-1 Through T-4-12, Plate 5-3 ML17037C6832017-02-0606 February 2017 Table 7.2-1, Isolation Signal Codes (Cont'D) 6 of 6 ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C6912017-02-0606 February 2017 Table 7.2-1 (Cont'D) 3 of 6 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037C5612017-02-0606 February 2017 Plate 1-2 - Composite Site Stratographic Column Showing Position of Overcome Borings in Relation to Site Stratigraphy ML17037C7582017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037A6662017-02-0606 February 2017 Relative Pollen Percentages, Spores and Miscellaneous Microfossil Abundance, Plate 1-3 ML17037A6622017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-3, Plate 5-11 ML17037A6582017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-3-1 Through T-3-10, Plate 5-2 ML17037A6632017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-4, Plate 6-12 ML17037A7152017-02-0606 February 2017 Figure 6-3, Response Test Strip Chart for Unstable Condition. ML17037A7012017-02-0606 February 2017 Table 7.2-1 (Continued) ML17037C6922017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037C7592017-02-0606 February 2017 Table 7.2-1 (Cont'D) 6 of 6 ML17037C7792017-02-0606 February 2017 Table 7.2-1 Isolation Signal Codes(Cont'D) 6 of 6 ML17037C7822017-02-0606 February 2017 Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6 ML17037C7852017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML12138A1352012-05-0707 May 2012 Reactor Pressure Vessel Head Weld Flaw Evaluation - Response to NRC Request for Additional Information ML12045A3892012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3962012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML12045A3942012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3932012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3922012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3912012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3902012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3872012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2022-11-10
MONTHYEARML23353A1572023-10-31031 October 2023 UFSAR Revision 28 (Redacted Version) ML22292A1152022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Table of Contents ML22292A1282022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix a, Reload Analysis ML22292A1272022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Figures ML22292A1262022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML22292A1252022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Appendices ML22292A1292022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents ML22292A1242022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix C, Licensee Renewal Supplement - Aging Management Programs and Time-Limited Aging Analyses ML22292A1232022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix a, Figure A.0-1, the Content of Figure A.0-1 Is Historical and Has Been Deleted ML22292A1212022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Appendix B ML22292A1202022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22292A1222022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assuarance ML22292A1182022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Figures ML22292A1172022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1132022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22292A1142022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position Cmeb 9.5-1, Rev. 2 Dated July 1981 ML22292A1122022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3 ML22292A1112022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Through 6.2 ML22292A1102022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End ML22292A1092022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1062022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B Thru 9C ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 ML22292A1042022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7 ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A1022022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 ML22292A1012022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F ML22292A0962022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents ML22292A0932022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22292A0912022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Table of Contents ML22292A0922022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Figures ML22292A0942022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Table of Contents ML22292A0952022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A ML22292A0842022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22292A0892022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Figures ML22292A0902022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Table of Contents ML22292A0882022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Table of Contents ML22292A0872022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents ML22292A0862022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Hazardous Materials Data Collection ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A0832022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5 ML22292A1312022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 ML22292A0972022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8 ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A0992022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End ML22292A1002022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2C Through 2I NMP2L2821, 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System2022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures 2023-10-31
~ a Q REACTIVITY CORE COOLANT SYS CONTAINMENT RADIOACTIVITY o 11 41 1s CONTROL COOL I NG INTEGRITY INTEGRITY CONTROL 1s 17 9 I 2 3 1 5 6 7------
17 91231567891il I 231567B91il I 23156789ilI2345678991231567B991231567891112J4S678911l2J4567B9 FIGURE 18.2-2 NOlE: "X" REPRESENTS VARIABLE FIELD. SAFETY FUNCTION STATUS PERIMETER GRID 15 FOR INFORMATION ONLY ** Dr SPLAY NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPURr USAR REVISION 3 OCTOBER 1991
~~~~~~~~ . ~,.~---
./
8 I 2 J 4 !I 6 7~~--~--'*
R E Ac T I v I T y c 0 N T R 0 L 11234!1678,llZ34!1678!181Z34!1678!1Bl234!16711!1112J4!1678!181ZJ4!1678S81ZJ4!1678981234!1678!1
l1234!1&7BS81234!16789812'J4!167891111234!1678!1812J4!1678!1812J4!!678!11illZJ4!1678!!8tZ34!1678' NOTE1 PERIMETER GR!O IS FOR INFORMATION ONLY. FIGURE 18.2-3 Al.ARM MARKS ARE FOR INFORMATION/ILLUSTRATION ONLY ANO 00 NOT REPRESENT ACTUAL SETPOINT VALUES.
REACTIVITY CONTROL DISPLAY NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDA TEO SAFETY ANALYSIS REPOR r USAA REVISION J OCTOBER IS91
ss0 I J8 1-...-...-...-~~--...-......~...-...---....-...-~...-...-....-...-...-~-...---....-...--...-...-...-+0 38 39 DRYWELL TEMP xxx OEGFI MM:SS MM:SS MM:SS MM:SS MM:SS MM:SS 39 1s - <TI ME -5 MINUTES> <TI ME> 40 41 41 12 42 4J REACTIVITY CORE COOLANT SYS CONTAINMENT RADIOACTIVITY 43 44 44 45 CONTROL COOLING INTEGRITY INTEGRITY CONTROL 45 46 46 n 47 B I 2 3 4 5 6 7-------
812J15 & 789812315678981231567898123156789Bl23t567898123*567B9B12l156789Bl23156789 FJGURE 18.2-4 NOlE: PERIMETER GRIO JS FOR INFORMATION ONLY.
ALARM MARKS ARE FOR INFORMATION/ILLUSTRATION ONLY ANO 00 NOT REPRESENT ACTUAL SETPOINT VALUES. CORE COOLING DISPLAY NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAA REVISION 3 OCTOBER 199 l
I . -- -
I u I 2 3 4 5 6 7 -
c 0 0 L AN T s y s I NT E GR I T y 11123456709Bl23456789Bl234567S981234567B9111234567D!lB1234567B911123456799Bl23456799 ii NMP- 2 DATE: MM/OO/YY ll
!J I I 2 MODE XXXXXXXX TIME: HH:MM:SS 2 I
3 3 I
4 IRPVH PRESSURE xxxx 4
5 ISOLATION VALVE GROUPS - NARROW PSI G 050 5 r----1 15001
' --ALL VALVES CLOSED--
6 I 6 I
./1r------- 1037 I xxx xxx I 7 7 B 1 7 "'-li__~!f>~_J B I 9 I xxx xxx 9
Iii 2 8 11 I 11 I xxx xxx II IZ 3 9 12 I 13 950 750 14 4 xxx 10 xxx 13:
l!I 16 17 5 xxx 11 xxx ~*
16 I xxx 17 :
18 6 xxx 12 1e I 19 19 I 211 i--~~~~...-~~~~-.-~~~----..~~~~----.~~~~---+-850 21110 21 21 ' - - - - -
23 WATER IN loRYWELL PRESSURE - NARROW XXX-XX PSIG zJr---1 LEVEL +5 211 150 I
' Ar 24 25 2s 1 I 26 NUMBER OF '-t[~!9~=J 2& I I
'l7 28 29 OPEN SRV I xx I 0 ?1- 68 271 28 I 29 I I
I I
38 :ia I I 31 0 JI I 75 I DRY WELL I 32 1 J2 I 33 3*
TEMP xxx DEGFj :>JI 34 I I
I
J!j 3!51 I I I 36 361 I 37 371 I 38 i--~~~~~~~~~~~~~~~~~~~~~~~~~~-5 381 12l 1 J9 MM:SS MM:SS MM:SS MM:SS MM:SS MM:SS 39"----..1 4il CTIME -5 MINUTES> CTIME> 411 11 41 n 42 43 REACTIVITY CORE COOLANT SYS CONTAINMENT RADIOACTIVITY 43 44 44 45 CONTROL COOLING INTEGRITY INTEGRITY CONTROL 45 16 16 47 17 0 I 2 3 - 4 5 6 7-------
ll 1234567B9ilJI234567B981234567B9111234567B9iiI23456789iiI234567B911123456789111i!:J45S789 NOTE: PERIMETER GRID IS FOR INFORMATION ONLY. FIGURE 18.2-5 ALARM MARKS ARE FOR INFORMATION/ILLUSTRATION ONLY AND DO NOT REPRESENT ACTUAL SETPOINT VALUES.
COOLANT SYSTEM INTEGRITY DISPLAY NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 3 OCTOBER l991
\.__.,,
B I 2 3 4 S 6 7-----
C 0 N T A I N ME N T I N T E G R I T Y DATE: MM/OD/YY 11123*56789812l45670991234567B91l 1234S67B9111234S6789812345671191t I 234!j679!3BI2345£789 I! NMP- 2 eI I .
MODE XXXXXXXX PAGE 1 OF 2 TIME: HH:MM:SS xxx. x PSIG I t I 15121 2 2 3
I DRY WELL PRESSURE - WI DE ! r--- 1 r xx. x Psro 1 5 I 51+5 I 6 DRYWELL TO I & I I 7 SUPPR CHMBR DIFF PRESS 4[~~§~9~] 1 I 0
I r
8 8 I I
)
?:~
9 9 I I BELOW
[ xxx]
Kl HI I I II OWSIPL I I I I 11 1-5 I 12 L ___ f 12 CURVE IJ lsuPPR CHMBR PRESS XX.X PSIG I - 0 15 16 SUPPR CHMBR PRESS MARGIN TO PSP I xx.x PSIGI 0 ,.a,60 t.J45 ~
JI jCDNTMT HYDROGEN CONC - NARROW [XXJ XX.X 31 r--1
.4t=~~~~=J 321301
~:
~
~
33 33 I I I I t
~ 34
~ 5 35 I 151
~ 36 I I
~ 1- 8 37 I I
~ I I i 1 0 38 I 0 I
~ MM:SS MM:SS MM:SS MM:SS MM:SS MM:SS 39 L--J
~
~ 44 a CONTROL COOLING INTEGRITY INTEGRITY CONTROL 45
~ 46
~ H ll I 2 J ~ 5 6 7--------o-0123.o!56789BI2J4567691l I 2345676911IZJ45676SllI234567891112345 & 7BSI!t234567691112J456789 FIGURE 18.2-6 (SHEET 2 OF 2)
NOTE: PERIMETER GRID IS FOR INFORMATION ONLY.
ALARM HARKS ARE FOR INFORMATION/ILLUSTRATION ONLY ANO DO NOT REPRESENT ACTUAL SETPOINT VALUES.
CONTAINMENT INTEGRITY DISPLAY
<PAGE 2 OF 2>
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 13 OCTOBER 2000
1 r-
~-----=* ~
Iii I
2 MODE XXXXXXXX 3
4 E::+X s ISOLATION VALVE GROUPS Ii --ALL VALVES CLOSE0--
812345678911123456789iI234IS67891il I 234567891il I 23456789111234567891il I 2345678911J2:J4567B9 FIGURE 18.2- 7 NOTE; PERIMETER GRIO IS FOR INFORMATION 01'4. Y.
ALARM MARKS ARE FOR INl'"ORMATfON/ILLUSTRATfON RADIOACTIVITY CONTROL DISPLAY ONLY ANO 00 NOT REPRESENT ACTUAL SETPOINT VALUES.
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAA REVISION 3 OCTOBER 1991
THIS FIGURE HAS BEEN DELETED SOURCE: N/A FIGURE 18.2-8 NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 25 OCTOBER 2022 _J L