ML22292A130
Text
.'--.
SUPERVISOR QUALITY CONTROL
- INSPECTION
- WOAK AEQUfST AEvtEW
- MPECTOR CE'"1RCATION SUPERVISOR
- QUALITY ENGINEERING NMP 1 SUPERVISOR OPEA. SUAV.
- SURVEIUAMCI!
- DATAtAECORO AEVtEW SUPERVISOR QUALITY ENGINEERING NMP 2
- TAblOING
- NAC INTERFACE
- TECHfiffCAI. SUPPOllT
- l"M.~flATIONAl AND STAAT*Uf' TEST SUAVflU.ANCE
- QUALITY l'lANNING
- MOOIFlCATION SUPPOlllT YK:E PRESIDENT QUALITY ASSURANCE SlNIOR SUPERVISOR Q.A. AUDITS
- NMP1 AND NMP2 AUDITS
- OTHEA CORPORA Tl! AUDITS
- QUALITY FtAST SUPERVISOR Q.A. SERVICES
- COORDINATES OA TRAINING
- TREND ANALYSIS
- ~OUAl:ANO M>>WAL DEYElOfl'iEMT SUPERVISOR QUALITY ASSURANCE ENGINEERING
- REVIEW MOOIFICATION DHIGN DOCUMENTS
- OUAUTY nAMNINO FIGURE 17.1-1 MGR. QUALITY &
RELIABILITY ENGINEERING SUPEAVtSOR PROCUREMENT QUALITY&
RELIABILITY ENGINEERING
- VENDOR OUALWK;ATIOM
- !OutflMENT OUAllftCATIOtil SUPPORT
~.
)
~ *'
SUPERVISOR MATERIALS QUALITY ENGINEERING
- MA Tt:AIAL IU.. VEILLANCE e WELDING SUPPORT
- NDESUP'°"'
e fUElSOA QA NUCLEAR ORGANIZATION DURING CONSTRUCTION, PRELIMINARY TEST, PREOPERATIONAL TESTING, STARTUP TESTING, OPERATIONS NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 28 MAY 1987
ANY CONSTRUCTION REWORK CONSTRUCTION MODS APPLICATION ORGANIZATION MANAGER QA-PROJECT APPLICATION PROGRAM APPENDIX D TO PSAR CONSTRUCTION SURVEILLANCE VENDOR AUDITS I
NOTE1
, r NOTE 2 PRELIMINARY &
PREOPERATIONAL TESTS/RESULTS REVIEW RETESTS MANAGER NUCLEAR QA OPERATIONS NOTE3 FSAR CHAPTER17
~------------------- ---------------
MODIFICATIONS NOTES:
OPERATIONAL PROGRAM STARTUP TESTS/RESULTS REVIEW
- 2. SITE AUDITS OF THE INITIAL TEST PHASE ARE PERFORMED BY THE MANAGER OF QA PROJECTS IN ACCORDANCE WITH THE CHAPTER 17 QA PROGRAM FOR AN INTERIM PERIOD UNTIL FUEL LOAD
- 3. THIS LINE DESIGNATES THAT ACTIVITIES SUBSEQUENT TO ACCEPTANCE AND PREOPERATIONAL TESTING ARE GOVERNED BY QATR-1 *
- 4. ANY REQUIRED CONSTRUCTION REWORK OR RETEST UNDER THE ACCEPTANCE/PREOPERATIONAL TESTING PROGRAM ARE GOVERNED BY THE APPLICABLE QA PROGRAM MANAGER NMPC-QATR-1 NUCLEAR TOPICAL REPORT
~----* QA OPERATIONS FIGURE 17.1-2 APPLICABLE QA PROGRAM AND ORGANIZATION USED DURING PRELIMINARY TESTING I CONSTRUCTION, PREOPERATIONAL TESTING AND STARTUP TESTING I OPERATIONS NIAGARA MOHAWK POWER CORPORATION' NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 0 APRIL 1989