SUPERVISOR QUALITY CONTROL

  • INSPECTION
  • WOAK AEQUfST AEvtEW
  • MPECTOR CE'"1RCATION SUPERVISOR
  • QUALITY ENGINEERING NMP 1 SUPERVISOR OPEA. SUAV.
  • SURVEIUAMCI!
  • DATAtAECORO AEVtEW SUPERVISOR QUALITY ENGINEERING NMP 2
  • TAblOING
  • TECHfiffCAI. SUPPOllT
  • l"M.~flATIONAl AND STAAT*Uf' TEST SUAVflU.ANCE
  • QUALITY l'lANNING
  • MOOIFlCATION SUPPOlllT YK:E PRESIDENT QUALITY ASSURANCE SlNIOR SUPERVISOR Q.A. AUDITS
  • NMP1 AND NMP2 AUDITS
  • OTHEA CORPORA Tl! AUDITS
  • QUALITY FtAST SUPERVISOR Q.A. SERVICES
  • COORDINATES OA TRAINING
  • TREND ANALYSIS
  • ~OUAl:ANO M>>WAL DEYElOfl'iEMT SUPERVISOR QUALITY ASSURANCE ENGINEERING
  • REVIEW MOOIFICATION DHIGN DOCUMENTS
  • OUAUTY nAMNINO FIGURE 17.1-1 MGR. QUALITY &

RELIABILITY ENGINEERING SUPEAVtSOR PROCUREMENT QUALITY&

RELIABILITY ENGINEERING

  • VENDOR OUALWK;ATIOM
  • !OutflMENT OUAllftCATIOtil SUPPORT

~.

)

~ *'

SUPERVISOR MATERIALS QUALITY ENGINEERING

  • MA Tt:AIAL IU.. VEILLANCE e WELDING SUPPORT
  • NDESUP'°"'

e fUElSOA QA NUCLEAR ORGANIZATION DURING CONSTRUCTION, PRELIMINARY TEST, PREOPERATIONAL TESTING, STARTUP TESTING, OPERATIONS NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2 FINAL SAFETY ANALYSIS REPORT AMENDMENT 28 MAY 1987

ANY CONSTRUCTION REWORK CONSTRUCTION MODS APPLICATION ORGANIZATION MANAGER QA-PROJECT APPLICATION PROGRAM APPENDIX D TO PSAR CONSTRUCTION SURVEILLANCE VENDOR AUDITS I

NOTE1

, r NOTE 2 PRELIMINARY &

PREOPERATIONAL TESTS/RESULTS REVIEW RETESTS MANAGER NUCLEAR QA OPERATIONS NOTE3 FSAR CHAPTER17


~------------------- ---------------

MODIFICATIONS NOTES:

OPERATIONAL PROGRAM STARTUP TESTS/RESULTS REVIEW

1. THIS LINE DESIGNATES THE APPLICABLE QA MANAGER AND QA PROGRAM
2. SITE AUDITS OF THE INITIAL TEST PHASE ARE PERFORMED BY THE MANAGER OF QA PROJECTS IN ACCORDANCE WITH THE CHAPTER 17 QA PROGRAM FOR AN INTERIM PERIOD UNTIL FUEL LOAD
3. THIS LINE DESIGNATES THAT ACTIVITIES SUBSEQUENT TO ACCEPTANCE AND PREOPERATIONAL TESTING ARE GOVERNED BY QATR-1 *
4. ANY REQUIRED CONSTRUCTION REWORK OR RETEST UNDER THE ACCEPTANCE/PREOPERATIONAL TESTING PROGRAM ARE GOVERNED BY THE APPLICABLE QA PROGRAM MANAGER NMPC-QATR-1 NUCLEAR TOPICAL REPORT

~----* QA OPERATIONS FIGURE 17.1-2 APPLICABLE QA PROGRAM AND ORGANIZATION USED DURING PRELIMINARY TESTING I CONSTRUCTION, PREOPERATIONAL TESTING AND STARTUP TESTING I OPERATIONS NIAGARA MOHAWK POWER CORPORATION' NINE MILE POINT-UNIT 2 UPDATED SAFETY ANALYSIS REPORT USAR REVISION 0 APRIL 1989