Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23318A10828 December 2023FSAR Chapter 1, Figures Redacted
ML23165A24314 June 2023FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19
ML23062A63829 December 2022Revision OL-26 to Final Safety Analysis Report, FiguresTornado Missile
ML23062A64929 December 2022Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification BasesAging Management
ML23062A65429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures
ML23062A65329 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance
ML23062A65229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures
ML23062A65129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical RequirementsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Missed surveillance
Pressure and Temperature Limits Report
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Power change
ML23062A65029 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan RequirementsSafe Shutdown
Reactor Vessel Water Level
Loop seal
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
VT-2
Emergency Lighting
Process Control Program
Earthquake
Fuel cladding
ML23062A64729 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures
ML23062A64529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Grab sample
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Past operability
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Missile Protection
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
GOTHIC
ML23062A64429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Commercial Grade Dedication
Safe Shutdown Earthquake
Weld Overlay
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Temporary Modification
Emergency Lighting
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
License Renewal
Earthquake
Power-Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Scaffolding
Backfit
Power change
Flow Induced Vibration
GOTHIC
ML23062A64329 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve
ML23062A64229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Emergency Lighting
Finite Element Analysis
B.5.b
Tornado Missile Protection
Surveillance Frequency Control Program
Design basis earthquake
Excess Flow Check Valve
Earthquake
Control of Heavy Loads
Power-Operated Valves
Fuel cladding
Fire Protection Program
Power change
Siren
ML23062A64129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation ProtectionSafe Shutdown
Boric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Coatings
Fuel cladding
Pressure Boundary Leakage
Scaffolding
Overexposure
ML23062A64029 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
FLEX
Safeguards Contingency Plan
Earthquake
ML23062A63929 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 8, FiguresBoric Acid
FLEX
ML23062A63729 December 2022Revision OL-26 to Final Safety Analysis Report, Change Notice LogSafe Shutdown
Ultimate heat sink
Coatings
Aging Management
Surveillance Frequency Control Program
Open Phase Condition
License Renewal
ML23062A63629 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML23062A63529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident AnalysisSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Grab sample
Stroke time
Safe Shutdown Earthquake
Emergency Lighting
Design basis earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
Coast down
ML23062A63429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures
ML23062A63329 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Loop seal
Ultimate heat sink
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Past operability
Operating Basis Earthquake
Nondestructive Examination
Pressure and Temperature Limits Report
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
Unidentified leakage
ML23062A63229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures
ML23062A63129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Fuel cladding
Power change
Flow Induced Vibration
ML23062A63029 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site CharacteristicsEarthquake
ML23062A62929 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures
ML23062A61829 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Stroke time
Tornado Missile
Hydrostatic
Fast acting solenoid valve
Earthquake
Power-Operated Valves
Turbine Missile
ML23062A60629 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Temporary Modification
Emergency Lighting
Open Phase Condition
Offsite Circuit
ML23062A60729 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time
ML23062A60829 December 2022Revision OL-26 to Final Safety Analysis Report, List of Effective Figures
ML23062A60929 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Water Inventory Control
Met Tower
Earthquake
Fuel cladding
Power change
ML23062A61129 December 2022Revision OL-26 to Final Safety Analysis Report, List of Effective Sections
ML23062A61229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures
ML23062A61329 December 2022Revision OL-26 to Final Safety Analysis Report, List of Effective Tables
ML23062A61529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 2, FiguresHydrostatic
ML23062A61629 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve
ML23062A61729 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program
ML23062A62429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal SupplementBoric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Aging Management
Pressure and Temperature Limits Report
Foreign Material Exclusion
License Renewal
Earthquake
Biofouling
Fire Protection Program